Domestic roofing kills more sole traders and small-firm operatives than almost any other UK construction activity. HSE data has shown falls from height accounting for around a third of construction fatalities for over a decade, and short-duration domestic roof work is consistently over-represented because crews underestimate it — a half-day strip-and-felt is the same hazard as a week-long commercial replacement, with less time spent planning. A proper method statement matters because most domestic roofs don't get scaffold-tower protection: the controls are ladder discipline, edge-awareness, weather thresholds and material-handling sequence. This page covers what a UK domestic roofing method statement needs to contain to be accepted at induction and to hold up after an incident.
UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Full version
No card required · 1 free PDF · Upgrade any time (completely free)
A method statement for domestic roofing is required wherever a contractor is undertaking work at height on a residential property under CDM 2015 Regulation 13 (plan, manage and monitor). The Work at Height Regulations 2005 Regulation 4 require employers to plan all work at height, and a written method statement is the standard way to evidence that planning. Domestic clients are exempt from most CDM duties — but the contractor is not. If you are the sole trader or the principal contractor on a domestic re-roof, repointing, ridge or chimney job, you are responsible for producing the method statement. Insurers, lenders requiring a re-roof for a mortgage offer, and any sub-let scaffolders will also expect it before mobilising. Where the job is over 30 working days or 500 person-days, a CDM F10 notification is also required.
A two-person roofing crew in Leeds is quoted for a full strip-and-replace on a 1930s semi: 85m² of concrete interlocking tile, gable verges, a chimney to be re-flashed, and a shared party-wall eaves with the neighbouring property. The homeowner's insurer requires a method statement before releasing the deposit. Using Riskora, the lead roofer selects the Roofing preset, confirms pre-loaded hazards (fall from eaves, fall through fragile rooflight on the rear extension, manual handling of tile bundles, dropped tiles into the side passage, hot works during felt-and-flash, public interface on the front pavement), specifies scaffold with toe-boards and brick-guards to all elevations, sets the weather stop threshold and lowering chute for tile removal, and exports a 9-page PDF in 5 minutes. The insurer accepts on first submission and the scaffold is up the following Monday.
Select your trade, pick your hazards, and generate a structured document — no training required.
Start Free with RiskoraNo card required · 1 free PDF · Upgrade for branding, DOCX, sign-off and audit trails (completely free)
Or learn more about the platform: Build it free with Riskora →
All documents should be reviewed by a competent person before use on site.
Generate a preview first. Sign up only when you want to save, edit or export.
Final RAMS must be reviewed and approved by a competent person before use.
Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.