RAMS for Roofing Work

UK construction-safety guidance by the Riskora Editorial Team

Producing a proper rams for roofing work is not optional — it is a legal and practical requirement for construction work in the UK. Whether you are a sole trader or managing a multi-phase project, documented risk management protects your workers, satisfies clients, and keeps you on the right side of HSE enforcement.

Under 5 minutesNo training requiredPDF downloadBuilt for UK contractors

Example RAMS

RAMS for Roofing Work

  • Scope and description of the roofing work works
  • Site-specific hazards relevant to construction
  • Risk ratings (likelihood × severity matrix)
  • Control measures for each hazard
Create a roofing RAMS free

No card required · 1 lifetime safety document · Upgrade when you need more

When This Document Is Required

Under CDM 2015 and HSE guidance, a RAMS for roofing work must be prepared before work begins on any construction site. The principal contractor is responsible for ensuring RAMS are in place, but duty holders at every level must contribute.

What Must Be Included

  • Scope and description of the roofing work works
  • Site-specific hazards relevant to construction
  • Risk ratings (likelihood × severity matrix)
  • Control measures for each hazard
  • PPE requirements for all personnel
  • Emergency procedures and first aid
  • Roles and responsibilities
  • Permits to work where applicable
  • Toolbox talk / briefing records
  • Review date and sign-off

Common Mistakes to Avoid

  • Using a generic template without adapting it to the actual roofing work conditions on site
  • Not reviewing the document when site conditions change
  • Missing sign-off from a competent person before work begins
  • Failing to brief workers on the RAMS content
  • Listing control measures that are not implemented
  • Leaving the RAMS generic when the hazards specific to roofing work — the ones a principal contractor will look for first — are what decide whether it is accepted

Example Scenario

A construction contractor in UK needs to produce a rams for roofing work before starting work next week. The client has requested professional documentation as a condition of site access. Using Riskora, they select the relevant trade preset, review pre-populated hazards, adjust controls for their specific site, and generate a professional rams in under 5 minutes — ready for review and sign-off.

The legal duty behind a rams for roofing work

Under the Work at Height Regulations 2005 the duty is a hierarchy, not a choice: avoid the work at height, then prevent the fall with collective protection, and only then mitigate the distance and consequences. Regulation 9 imposes a separate, specific duty on fragile surfaces. HSG33 sets the expectation that access, edge protection and fragile-surface controls are planned before anyone reaches the roof — which is exactly what a principal contractor is reading your documentation to confirm.

  • Work at Height Regulations 2005 · SI 2005/735

    HSE

  • Construction (Design and Management) Regulations 2015 · SI 2015/51

    HSE

  • Control of Asbestos Regulations 2012 (cement sheets, bitumen felts) · SI 2012/632

    HSE

  • Management of Health and Safety at Work Regulations 1999, reg 3 · SI 1999/3242

    HSE

Supporting HSE guidance

  • HSG33 — Health and safety in roof work: HSE
  • Fragile roofs: safe working practices (GEIS5): HSE

Hazards and controls reviewers expect to see

Roof work kills more construction workers in the UK than any other single activity, and the fatal falls are rarely from the edge — they are through the surface, usually within the first hour on a roof nobody had surveyed. Most rejected roofing documentation fails on the same point: it names 'working at height' as a hazard but says nothing about which surfaces on this roof are fragile and how they will be covered.

HazardControl measure
Fall through a fragile surface — rooflight, fibre-cement sheet or corroded deckTreat every rooflight and cement sheet as fragile until proven otherwise. Cover, stage over or fit proprietary rooflight covers before access; use crawling boards on sheeted roofs; never rely on paint or netting alone as the primary control.
Fall from an unprotected leading edge, eaves or vergeIndependent edge protection (double guardrail plus toeboard) to all open edges, or a scaffold with a working platform at eaves level. Where edge protection is not reasonably practicable, a soft-landing system or fall-arrest anchored to a designed point, with a rescue plan.
Falling materials, tiles, batten offcuts or tools striking people belowExclusion zone with physical barriers and signage under the working area, debris netting or brick guards to the scaffold, enclosed chutes to a skip, and no throwing or dropping of materials at any stage.
Wind loading on sheets, membranes and insulation boardsStop-work wind speeds stated numerically (typically 17 mph / Beaufort 4 for sheet handling, 23 mph for MEWP use), anemometer readings recorded by the supervisor, and materials weighted or strapped down at every break.
Hot works on built-up felt and torch-on systems igniting the roof build-upHot work permit with a 60-minute fire watch after the last flame, torch-free detailing at all upstands and abutments, extinguishers at the working position, and no torch-on within 150 mm of combustible substrates.
Asbestos cement sheets or bituminous products disturbed during strip-outRefurbishment and demolition survey obtained before work starts; where asbestos cement is present, non-licensed work with whole-sheet removal, no breaking, controlled lowering and waste consigned under the Hazardous Waste Regulations 2005.

A defensible work sequence for roofing work

  1. 1Pre-start survey: confirm roof construction, locate all fragile surfaces and rooflights, obtain the asbestos survey, and check the structure will carry the loads imposed by access equipment and materials.
  2. 2Establish the exclusion zone at ground level, sign it, and confirm no unprotected access beneath the working area.
  3. 3Erect the access scaffold or position the MEWP to a designed, inspected standard; scaffold handed over with a valid tag and inspected before first use and every 7 days.
  4. 4Install edge protection to all open edges and cover or stage over every fragile surface before any operative works on the roof.
  5. 5Strip and load out in controlled sequence, using enclosed chutes to the skip; segregate any asbestos-containing material for consigned disposal.
  6. 6Carry out the roof covering works, observing hot work permit conditions and stop-work wind speeds.
  7. 7Progressive clean-down, removal of debris netting and access equipment in reverse order, and final inspection with sign-off by the competent person.

Why these documents get rejected

  • Naming 'work at height' as the hazard without identifying which surfaces on this specific roof are fragile
  • Relying on a harness and lanyard as the primary control with no anchor point specified and no rescue plan
  • No stated wind speed at which sheeting or MEWP work stops
  • No refurbishment and demolition asbestos survey referenced before strip-out of an older roof
  • Edge protection described as 'as required' rather than specified for each open edge and elevation

Roofing Work: common questions

Does a domestic re-roof need a written risk assessment?

If you employ anyone, yes — and in practice it is needed regardless. The Management of Health and Safety at Work Regulations 1999 require significant findings to be recorded where five or more people are employed, but the Work at Height Regulations 2005 apply to every roof job irrespective of size, and CDM 2015 applies to domestic projects with the duties passing to the contractor.

How should fragile rooflights be dealt with in the documentation?

By name and by location. State that all rooflights and fibre-cement sheets are treated as fragile, then state the physical control — proprietary covers, staging over, or barriers at 2 m — and who fits them before roof access is permitted. A generic 'avoid fragile surfaces' line is the single most common reason roofing documentation is sent back.

What wind speed should stop roof work?

Give a number rather than 'high winds'. Sheet and membrane handling normally stops around 17 mph (Beaufort 4) because the material becomes a sail, and most MEWP manufacturers specify a maximum of 28 mph (12.5 m/s), with 23 mph a common site limit. State who takes the reading and where it is recorded.

Create Your RAMS in Minutes

Select your trade, pick your hazards, and generate a structured document — no training required.

Create a roofing RAMS free

No card required · 1 lifetime safety document · Paid tiers add branding, sign-off and audit trails

Or learn more about the platform: See plans and one-off options →

Built for real job scenarios · Designed for UK contractors and competent-person review

All documents should be reviewed by a competent person before use on site.

Free safety-document builder

Create a roofing RAMS free — preview before sign-up

Generate a preview first. Sign up only when you want to save, edit or export.

Final RAMS must be reviewed and approved by a competent person before use.

Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.