Risk Assessment for Asbestos Removal During Refurbishment — UK

UK construction-safety guidance by the Riskora Editorial Team

Refurbishment work in buildings constructed before 2000 carries a high probability of encountering asbestos. If your project involves stripping out ceilings, removing floor tiles, disturbing insulation, or opening up walls, you must assume asbestos is present until proven otherwise. A risk assessment for asbestos removal during refurbishment is not just good practice — it is a legal requirement under CAR 2012.

Under 5 minutesNo training requiredPDF downloadBuilt for UK contractors

Example Risk Assessment

Risk Assessment for Asbestos Removal During Refurbishment — UK

  • R&D survey findings and ACM locations identified
  • Types of asbestos present (chrysotile, amosite, crocidolite)
  • Assessment of whether each ACM will be disturbed by the refurbishment works
  • Classification: licensable, non-licensable, or notifiable non-licensable work
Create a asbestos removal refurbishment risk assessment free

No card required · 1 lifetime safety document · Upgrade when you need more

When This Document Is Required

The Control of Asbestos Regulations 2012 require a risk assessment before any work that may disturb asbestos-containing materials. For refurbishment projects, Regulation 7 mandates that a refurbishment and demolition (R&D) survey is completed before work begins in any building constructed or refurbished before 2000. The risk assessment must be based on the survey findings and must identify all ACMs that may be disturbed during the refurbishment works. This applies to all duty holders — building owners, contractors, and self-employed workers.

What Must Be Included

  • R&D survey findings and ACM locations identified
  • Types of asbestos present (chrysotile, amosite, crocidolite)
  • Assessment of whether each ACM will be disturbed by the refurbishment works
  • Classification: licensable, non-licensable, or notifiable non-licensable work
  • Control measures for each ACM — removal, encapsulation, or management in situ
  • RPE requirements and face-fit testing records
  • Air monitoring arrangements during removal
  • Waste handling and disposal procedures
  • Emergency fibre release procedures
  • Clearance and reoccupation criteria

Common Mistakes to Avoid

  • Starting refurbishment work before completing an R&D asbestos survey
  • Assuming a management survey is sufficient for refurbishment — it is not
  • Treating all asbestos work as non-licensable without proper classification
  • Not monitoring air quality during and after asbestos disturbance
  • Failing to segregate asbestos-contaminated areas from other refurbishment works
  • Disposing of asbestos waste through standard construction waste routes

Example Scenario

A fit-out contractor in London is refurbishing a 1980s office floor. The R&D survey identifies asbestos insulation board in the ceiling void, asbestos floor tiles in the kitchen area, and asbestos-containing textured coating on corridor walls. The client requires a risk assessment before any strip-out begins. Using Riskora, the project manager generates a risk assessment covering all three ACM types, classifies the work, specifies control measures for each, and produces professional documentation in under 5 minutes.

Create Your Risk Assessment in Minutes

Select your trade, pick your hazards, and generate a structured document — no training required.

Create a asbestos removal refurbishment risk assessment free

No card required · 1 lifetime safety document · Paid tiers add branding, sign-off and audit trails

Or learn more about the platform: See plans and one-off options →

Built for real job scenarios · Designed for UK contractors and competent-person review

All documents should be reviewed by a competent person before use on site.

Free safety-document builder

Create a asbestos removal refurbishment risk assessment free — preview before sign-up

Generate a preview first. Sign up only when you want to save, edit or export.

Final RAMS must be reviewed and approved by a competent person before use.

Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.