NYC Site Safety Plan Template — DOB BC 3310 (Chapter 33)
Generate professional NYC Site Safety Plan documents in minutes. No training required.
A Site Safety Plan template structured for New York City Department of Buildings filings under the NYC Construction Codes Chapter 33 / BC §3310. Built for Major Buildings (15+ stories, 100+ feet, or other §3310.2 triggers) where a Site Safety Manager (SSM) or Site Safety Coordinator (SSC) must seal the plan. Aligned with NYC DOB review and BEST Squad inspection expectations.
Designed for: NYC general contractors, construction managers, SSMs, SSCs and developers filing for Major Building permits
US (JSA) example document — Roof Tear-Off & Re-Cover — 482 Sandalwood Drive, Boise. Client: Sandalwood Homeowners Association. Site: 482 Sandalwood Drive, Boise, ID 83702. Scope: Tear-off of 2,400 sq ft of 3-tab asphalt shingles, replacement of damaged decking, installation of ice-and-water shield, synthetic underlayment and GAF Timberline HDZ architectural shingles. Works programmed over 6 working days with a crew of 4 roofers and 1 ground operative.

Full version
Complete Guide to NYC Site Safety Plan (US)
What is a NYC Site Safety Plan?
A Site Safety Plan (SSP) is the master safety filing for any Major Building construction or demolition job in New York City, required by NYC BC §3310. It documents how the contractor will protect the public, adjacent properties, workers and the city right-of-way during construction. The plan must be sealed by a licensed Site Safety Manager or Site Safety Coordinator, filed with NYC DOB, and kept on site for inspection by DOB and BEST Squad inspectors.
When is it legally required?
NYC BC §3310.2 triggers an SSP for Major Buildings, defined as: any new building or full demolition of a building that is 15 stories or more, 100 feet or more in height, or otherwise classified as a Major Building under the Code. Many alterations also trigger SSP requirements depending on scope. An SSM is required on jobs of 15+ stories or 100+ feet; smaller Major Building jobs may use an SSC. The plan must be sealed, filed and approved before the permit is issued.
Who is responsible?
The Site Safety Manager (SSM) or Site Safety Coordinator (SSC) is the licensed individual who prepares and seals the plan. They must hold a current NYC DOB SSM or SSC license. The General Contractor and Construction Manager are jointly responsible for implementing the plan and for maintaining it on site. Changes to the means and methods, hoist setup, sidewalk shed configuration or adjacent-property protections require an amended plan signed and refiled.
Where is it commonly used?
Every NYC Major Building construction or demolition job — Manhattan high-rise residential, commercial towers in Long Island City, hotel projects in Brooklyn, mixed-use in the Bronx. The plan is reviewed by NYC DOB at permit issuance and inspected on site by both NYC DOB inspectors and the BEST Squad (Building Enforcement Safety Team) responsible for jobsite safety enforcement.
What a Complete NYC Site Safety Plan Includes
- Project address, BIN, block/lot, permit numbers
- SSM/SSC name, license number, seal and signature
- GC and CM name, license numbers, contact
- Site plan and site logistics drawings
- Sidewalk shed design, location and BC §3307.6 compliance
- Construction fence and gates (BC §3307.7)
- Hoist(s) — type, location, capacity, operator licensing, BC §3314
- Crane and derrick — CD/CN/MD certificates, licensed operator, lift plans
- Material storage and loading zones
- Adjacent property protection (BC §3309) — including occupied neighbour notification
- Pedestrian and vehicular traffic plan, MPT where required
- Worker access, hoisting and egress
- Fire safety plan and Fire Department interface (FDNY notification, standpipes, FD access)
- Emergency action plan, mustering, communication tree (911 + DOB + FDNY)
- Hot work, hot tar, roofing safety — BC §3308
- Fall protection programme (29 CFR 1926 Subpart M)
- Worker training — 40-hour and 62-hour Site Safety Training (SST) card per LL196
- Drug & alcohol policy, daily sign-in
- TR1 / TR8 special inspection schedule references
- Amendments log
What's included in this template
Project & Filing Information
Address, BIN, block/lot, permit, SSM/SSC seal.
Site Logistics & Drawings
Site plan, sequencing, access, egress, material storage.
Sidewalk Shed & Construction Fence
Per BC §3307.6 / §3307.7.
Hoisting Equipment
Hoists, cranes, derricks, lift plans, licensed operators.
Adjacent Property Protection
BC §3309 — surveys, protections, notifications.
Pedestrian & Vehicular Safety
MPT, traffic plan, public way protection.
Fire Safety
BC §3308 — hot work, standpipes, FDNY interface.
Worker Safety
Fall protection, SST cards (LL196), induction, sign-in.
Emergency Action Plan
Mustering, 911/DOB/FDNY communication tree, first aid.
Special Inspections
TR1/TR8 references and schedule.
Amendments Log
Every change refiled and dated.
US Requirements and Best Practice
Legal expectations
- ● Sealed by a licensed Site Safety Manager (SSM) or Site Safety Coordinator (SSC) — NYC BC §3310
- ● Filed with NYC DOB before permit issuance
- ● Major Building definition met — 15+ stories, 100+ ft, or §3310.2 trigger
- ● Sidewalk shed designed and erected per BC §3307.6 before vertical work above grade
- ● Adjacent property protection notification served on neighbours — BC §3309.4
- ● All workers and supervisors hold SST cards per Local Law 196 of 2017
- ● Crane/derrick operations under a licensed Hoisting Machine Operator — DOB-issued
- ● FDNY notified for hot work, hot tar and standpipe modifications
- ● Plan kept on site, current copy, available for DOB and BEST Squad inspectors
What inspectors typically look for
- ● Is the SSP sealed and is the SSM/SSC actually on site (or rostered with a documented backup)?
- ● Does the as-built sidewalk shed match the filed plan dimensions and design?
- ● Is the adjacent-property notification (BC §3309.4) served and acknowledged?
- ● SST cards present and current for every worker on site (LL196)?
- ● Hoist operator license posted, daily inspection log up to date?
- ● Crane CD/CN/MD certificates current and posted?
- ● Fire safety plan posted; standpipes maintained; FDNY notifications filed?
- ● Has the plan been amended after each significant scope change, or is it still the original filing?
Common compliance mistakes
- Using an SSM/SSC seal on a job that has outgrown their license tier
- No amended plan after a hoist relocation, shed reconfiguration or scope change
- Workers on site without current SST cards (LL196 — strict liability)
- Adjacent property protection notification never served, or served late
- Sidewalk shed installed differently from the filed drawing
- Crane lift plan generic — not specific to the lift being executed
- Fire safety plan not posted; FDNY hot work permit absent
- No documented daily SSM/SSC site presence or rostered backup
Example Use Cases
22-story residential ground-up, Chelsea (Manhattan)
A 22-story residential tower hits the §3310.2 Major Building threshold on both height and stories. SSP sealed by a full SSM, sidewalk shed across the full Lex frontage per BC §3307.6, two material hoists and one personnel hoist on the south elevation, BC §3309 notification served on the two adjacent occupied buildings, tower crane with documented CD certificate and named licensed Hoisting Machine Operator. SST register checked weekly against the daily sign-in.
12-story mixed-use alteration, Long Island City (Queens)
An alteration with vertical enlargement that triggers §3310 for the work scope. SSC seals the plan under the smaller-job threshold, sidewalk shed limited to the affected frontage, single mast climber on the south elevation, occupied retail at grade remains open requiring a fully protected access corridor and dust/noise controls referenced from the plan, FDNY notification for standpipe modifications during the vertical extension.
8-story full demolition, Downtown Brooklyn
Full demolition of an 8-story masonry building triggers Major Building demolition under §3310. SSM-sealed plan covers means-and-methods sequencing top-down, sidewalk bridge on two frontages, debris-chute layout, MEP disconnect schedule, asbestos abatement clearance, BC §3309 protection of two abutting party walls, water-misting dust control with neighbour notifications, and explicit no-burning hot-work restriction.
How to use this template
- 1
Confirm Major Building status
BC §3310.2 — 15+ stories, 100+ ft, or other triggers. Determines SSM vs SSC requirement.
- 2
Engage your SSM or SSC
Licensed individual seals the plan. Confirm license tier matches the job.
- 3
Draft the site logistics
Shed, fence, hoist, crane, storage, access — drawings before narrative.
- 4
BC §3309 adjacent property protection
Survey neighbours, serve notification, document protections.
- 5
Build the fire safety plan
BC §3308 hot work, standpipes, FDNY notifications and permits.
- 6
Worker safety section
Fall protection programme + SST card register per LL196. No SST = no entry.
- 7
Emergency action plan
Muster points, communication tree, FDNY/DOB/911 contacts on posted board.
- 8
File with NYC DOB
Plan reviewed at permit issuance. Keep stamped copy on site.
- 9
Amend on every scope change
Hoist move, shed reconfig, crane swap — amended plan refiled and resealed.
Common mistakes to avoid
- SSM/SSC license tier doesn't match job size (Major Building filed by an SSC)
- Plan never amended after a hoist relocation or scope change
- Workers on site without current SST cards — Local Law 196 strict liability
- BC §3309 adjacent property notification not served before work began
- Sidewalk shed as-built differs from filed drawing
- Generic crane lift plan rather than per-lift specifics
- No FDNY notification for hot work or standpipe modifications
- SSM/SSC named but no documented daily presence or rostered backup
Share or Use This Template
This NYC Site Safety Plan template is free to use and share. Feel free to reference it with your team, include it in training materials, or link to it from your own resources.
Why templates have limitations
Templates provide a solid starting point, but they require manual editing to match your specific site conditions, hazards, and work activities. This can be time-consuming and important site-specific risks may be missed if sections are left generic.
For projects where accuracy and speed matter, many contractors prefer tools that generate structured documents automatically based on real project inputs.
Prefer to generate this instantly?
Riskora creates fully structured NYC Site Safety Plan documents in under 5 minutes. Select your trade, choose your hazards, and download — no manual editing required.
Frequently asked questions
Or start from this template inside Riskora — edit, customise, and download in minutes.