Kiwi safety documents, built for the site you're actually on
Under HSWA 2015, every PCBU has to show they've thought about the work, the people and the risks. Main contractors want a Task Analysis, JSA or SWMS before you're on site — not a UK RAMS with kiwi added in a footer. Riskora structures every NZ doc for you. 100+ industries supported.
New Zealand (JSA) example document — Kitchen Reconfiguration & Beam Install — 42 Tinakori Road, Wellington. Client: Mr & Mrs Henderson (Private Client). Site: 42 Tinakori Road, Thorndon, Wellington 6011. Scope: Removal of a load-bearing internal wall in an existing 1910 weatherboard villa, installation of a 250 UB engineered steel beam to form a 4.8 m opening, replacement of kitchen joinery, services first/second fix, and minor strip-out of pre-2000 sheet linings. Works occur in an occupied dwelling within a Heritage Area 1 zone.

Full version
- Free to start
- No signup to preview
- Done in ~60 seconds
Structured for HSWA 2015 — PCBU duties, hierarchy of controls, worker engagement and Notifiable Event triggers visible on every PDF.
- UK · IE · US · CA · AU · NZ
- RAMS · SWMS · JHA · JSA · COSHH · Task Analysis · Toolbox Talks
- Site-specific — not a blank template
- First document free · No card required
- The main contractor wants a Task Analysis, JSA or SWMS before site.
- Last submission got flagged as an off-the-shelf template.
- WorkSafe NZ inspector, notifiable event or audit is looming.
- You need to show worker engagement in writing.
- The main contractor's request
- Your scope of works or quote
- A supervisor's WhatsApp or text
- Previous TA / JSA to update for this site
- Pre-qual or prequal requirements
What Riskora builds into every NZ safety document
Job-specific hazards
Hazards drawn from the task, the site and the scope you describe — not a stock list.
Hierarchy of controls
Elimination first, PPE last. Initial and residual risk shown side by side.
Step-by-step method
Sequenced steps with a person responsible for each, written for this Task Analysis.
PPE & equipment
Task-specific PPE, plant and inspection requirements.
Emergency arrangements
First aid, fire, spill and rescue arrangements specific to the work.
Chemicals & substances
Substance prompts appear when materials in scope need a hazardous-substance assessment.
Permits & hold points
Hot work, working at height, confined space and inspection hold points where they apply.
Briefing & sign-off
Pre-start briefing register, version lock and an audit-ready workflow.
Main-contractor ready NZ PDF
Branded, paginated PDF you can issue without reformatting.
NZ docs, not a UK RAMS with kiwi added
Native Kiwi terminology — PCBU, Notifiable Event, Site Safe, worker engagement. Hazards mapped to the HSWA hierarchy of controls. Sign-on register and supervisor sign-off on every PDF.
Riskora isn't a blank template or a generic AI text generator
Riskora asks for your job and site context, then structures a client-ready, site-specific JSA: hazards, controls, method steps, PPE, emergency arrangements and sign-off — not a paragraph of AI prose. You stay in control of every section and the output is built for an audit-ready workflow.
What your JSA actually contains
Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.
Hazards
Task-specific hazards for the job, captured row by row — not a generic list pulled from an old JSA.
Controls
Control measures mapped to each hazard with residual risk scoring after controls are applied.
PPE
PPE requirements tied to the activity and site, ready to brief to the team.
Method steps
Step-by-step method statement structured around how the work is actually sequenced on site.
Emergency arrangements
First aid, rescue plan, emergency contacts and site-specific escalation routes.
COSHH prompts
Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.
Sign-off
Operative sign-off captured against the document — names, dates and acknowledgement of the brief.
Version history
Every change tracked so you can show what was issued, when, and which version the team signed.
Approval status
Clear approval state on every document — draft, in review, approved, issued — visible across the team.
Audit trail
Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.
From copied-and-pasted to site-specific
The reason JSA get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.
Generic template copied from an old job.
- • Hazards and controls that don't match this site or task.
- • Method steps written for a different sequence of work.
- • No emergency arrangements specific to the location.
- • Client flags it as generic and asks for a rewrite.
Site-specific document structured around this job, site and task.
- • Hazards captured from the actual scope you pasted in.
- • Method steps sequenced for how the work runs on site.
- • Emergency arrangements and rescue plan tied to the location.
- • Approved internally, briefed to the team, signed off and stored.
From job details to signed-off document
A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.
- 1Paste job details
Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.
- 2Riskora structures the document
Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.
- 3Review, edit and download
You stay in control of every section. Tweak anything, then download a clean PDF or share a link.
- 4Brief the team and record sign-off
Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.
Built by people who've written this paperwork on real sites
Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.
- Built for contractors, consultants and teams
Solo trades, principal contractors and in-house safety teams all run on the same workflow. - Supports multiple countries
UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard. - Not just documents
Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.
Describe the job details — get a structured JSA
Describe the job details, scope of works, email or WhatsApp message. Riskora structures the rest.
Questions for this exact situation
Riskora helps structure a site-specific safety document. It does not replace competent review, site supervision, client requirements or legal duties. Always check the final document before issue.
Related Riskora pages
- NZ Task Analysis generatorThe standard NZ document
- NZ JSA generatorJob Safety Analysis
- NZ SWMS generatorWhen an Aussie PC is involved
- NZ toolbox talk generatorPre-start briefing
- All NZ safety documentsFull NZ index
- Same-day JSA (NZ)JSA in hand today
- Rebuild an existing JSAUpload and re-issue
- Australian SWMSFor trans-Tasman work
- Emergency document helpYou need it today
- PricingFree start · paid from £29/mo