Build a site-specific SWMS for Australian high-risk construction work

Create an Australian SWMS from your scope of works, site task or client brief. Include hazards, controls, monitoring, review and worker sign-off — aligned with WHS Regulation 291/299 and PCBU duties. 100+ industries supported.

Australia (SWMS) example document — Tenancy 3 Commercial Fit-Out — 88 Latrobe Street, Melbourne. Client: Latrobe Holdings Pty Ltd. Site: 88 Latrobe Street, Tenancy 3, Melbourne, VIC 3000. Scope: Cat-B fit-out of an existing 220 m² ground-floor tenancy: demolition of partitions, new steel-stud partitioning, suspended grid ceiling, joinery, electrical and data first/second fix, painting and floor coverings. Works occur during occupied-building hours under a building-manager permit. SWMS prepared because HRCW (work > 2 m on scissor lifts and powered mobile plant) is involved.

Example Australia (SWMS) front cover produced by Riskora
Try the new compact mode. Same document, just more compact

Full version

Preview first. No card needed. Download when you're happy.

  • Free to start
  • No signup to preview
  • Done in ~60 seconds

Riskora helps structure your safety document. A competent person must review it before use. Structured for Australian WHS — Regulation 291/299, PCBU duties, hierarchy of controls and worker sign-on.

  • UK · IE · US · CA · AU · NZ
  • RAMS · SWMS · JHA · JSA · COSHH · Task Analysis · Toolbox Talks
  • Site-specific — not a blank template
  • First document free · No card required
You're probably here because…
  • The principal contractor needs a SWMS before site induction.
  • An activity falls under one of the 18 HRCW categories.
  • Your last SWMS got knocked back as too generic.
  • An inspector or auditor wants to see the SWMS on site.
What to add to the box
  • The PCBU's request for SWMS
  • Your scope of works or quote
  • A supervisor's text message
  • Previous SWMS to update for this site
  • Tender or pre-qual requirements
Inside the document

What Riskora builds into every SWMS

Job-specific hazards

Hazards drawn from the task, the site and the scope you describe — not a stock list.

Hierarchy of controls

Elimination first, PPE last. Initial and residual risk shown side by side.

Step-by-step method

Sequenced steps with a person responsible for each, written for this SWMS.

PPE & equipment

Task-specific PPE, plant and inspection requirements.

Emergency arrangements

First aid, fire, spill and rescue arrangements specific to the work.

Chemicals & substances

Substance prompts appear when materials in scope need a hazardous-substance assessment.

Permits & hold points

Hot work, working at height, confined space and inspection hold points where they apply.

Briefing & sign-off

Pre-start briefing register, version lock and an audit-ready workflow.

Principal-contractor ready SWMS PDF

Branded, paginated PDF you can issue without reformatting.

Example output

A SWMS, not a UK RAMS with the spelling changed

Native Australian terminology — PCBU, HRCW, sign-on, White Card. Hazards mapped to the WHS hierarchy of controls. Sign-on register and supervisor sign-off built into the PDF.

Not a blank template

Riskora isn't a blank template or a generic AI text generator

Riskora asks for your job and site context, then structures a client-ready, site-specific SWMS: hazards, controls, method steps, PPE, emergency arrangements and sign-off — not a paragraph of AI prose. You stay in control of every section and the output is built for an audit-ready workflow.

Inside the document

What your SWMS actually contains

Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.

  • Hazards

    Task-specific hazards for the job, captured row by row — not a generic list pulled from an old SWMS.

  • Controls

    Control measures mapped to each hazard with residual risk scoring after controls are applied.

  • PPE

    PPE requirements tied to the activity and site, ready to brief to the team.

  • Method steps

    Step-by-step method statement structured around how the work is actually sequenced on site.

  • Emergency arrangements

    First aid, rescue plan, emergency contacts and site-specific escalation routes.

  • COSHH prompts

    Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.

  • Sign-off

    Operative sign-off captured against the document — names, dates and acknowledgement of the brief.

  • Version history

    Every change tracked so you can show what was issued, when, and which version the team signed.

  • Approval status

    Clear approval state on every document — draft, in review, approved, issued — visible across the team.

  • Audit trail

    Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.

Before & after

From copied-and-pasted to site-specific

The reason SWMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.

Before

Generic template copied from an old job.

  • • Hazards and controls that don't match this site or task.
  • • Method steps written for a different sequence of work.
  • • No emergency arrangements specific to the location.
  • • Client flags it as generic and asks for a rewrite.
After

Site-specific document structured around this job, site and task.

  • • Hazards captured from the actual scope you pasted in.
  • • Method steps sequenced for how the work runs on site.
  • • Emergency arrangements and rescue plan tied to the location.
  • • Approved internally, briefed to the team, signed off and stored.
How it works

From job details to signed-off document

A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.

  1. 1
    Paste job details

    Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.

  2. 2
    Riskora structures the document

    Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.

  3. 3
    Review, edit and download

    You stay in control of every section. Tweak anything, then download a clean PDF or share a link.

  4. 4
    Brief the team and record sign-off

    Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.

Built for site reality

Built by people who've written this paperwork on real sites

Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.

  • Built for contractors, consultants and teams
    Solo trades, principal contractors and in-house safety teams all run on the same workflow.
  • Supports multiple countries
    UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard.
  • Not just documents
    Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.
Start in seconds

Describe the job details — get a structured SWMS

Describe the job details, scope of works, email or WhatsApp message. Riskora structures the rest.

Preview first. No card needed. Download when you're happy.

FAQ

Questions for this exact situation

Yes. The 18 HRCW activities under WHS Regulation 291 are covered — work at height, confined space, energised electrical, demolition, asbestos, powered mobile plant, and so on.

Yes. Built around the Model WHS Act and aligned with NSW, QLD, VIC, SA, WA, TAS, ACT and NT implementations. Victoria's OHS Act terminology is supported where it differs.

Yes — every worker who reads and accepts the SWMS signs on, with provision for White Card and HRWL details.

It is built for the principal contractor review — HRCW identified, controls in hierarchy order, supervisor's review, sign-on register and review-when-changes triggers visible.

Yes — first SWMS is free, no card.

Riskora helps structure a site-specific safety document. It does not replace competent review, site supervision, client requirements or legal duties. Always check the final document before issue.