UK safety documents — the contractor's hub

If you build, dig, install or maintain anything in the UK, you're producing safety documents whether you want to or not. Principal contractors want RAMS before site access. CDM duty-holders expect site-specific risk assessments. COSHH applies the moment a hazardous substance turns up. This page is the index — pick the document you need and jump straight to the builder.

Core UK builders

Templates that turn into structured documents

Urgent and rejected-document help

Trade-specific RAMS

Guides and legal context

Software comparisons

Create your free Riskora account →

Regulatory context, common mistakes and a worked example

UK contractors juggle several different safety documents depending on who's asking — CDM duty-holders, principal contractors, COSHH-impacted clients, fire authority. This hub shows which document goes where and links the builders for each.

Regulation and guidance referenced

  • CDM 2015 Regulation 15Duties of principal contractor (HSE)

    The Principal Contractor's duty to plan, manage and monitor the construction phase — the trigger for the RAMS / construction phase plan documents.

  • MHSWR 1999 Regulation 3Risk assessment (HSE)

    Every employer must make a suitable and sufficient risk assessment. The legal basis behind every RA the builder produces.

  • COSHH 2002 Regulation 6Assessment of risks from substances hazardous to health (HSE)

    Where substances hazardous to health are present, a written COSHH assessment is required before exposure.

  • RRO 2005 Article 9Fire safety risk assessment (HMG / Home Office)

    The Regulatory Reform (Fire Safety) Order requires a fire risk assessment for every relevant premises — separate from construction RA.

Common mistakes that get this document rejected

  • RAMS used where a COSHH assessment is needed

    Including 'hazardous substances controlled via PPE' in a RAMS does not satisfy COSHH Regulation 6 — substance-specific assessments are still required.

  • No construction phase plan

    For notifiable CDM projects, the principal contractor must produce a construction phase plan before work starts — the RAMS supports it but doesn't replace it.

  • Toolbox talks not recorded

    Briefing records (with names, dates, signatures) are what auditors check, not the talk's content. Generic talks without a record fail audit.

Worked example

Scenario: A small electrical contractor working on a refurbishment of a retail unit — CDM notifiable, occupied building above.

What went wrong: Single RAMS submitted; principal contractor rejected for missing COSHH (for solvent-based adhesives) and no construction phase plan reference.

The fix: Split into RAMS, separate COSHH assessment for the specific solvents, and a CPP reference page. Briefing register added with signature columns.

Outcome: All accepted on resubmission. RAMS reviewed weekly and after any change to scope.

Last reviewed: datePublished 2026-06-25, lastReviewed 2026-06-25.

Reviewed by Riskora's safety content team. This page summarises publicly available guidance — always check the latest version with the original regulator before submitting safety documents.

Free RAMS builder

Create your RAMS free — preview before sign-up

Generate a preview first. Sign up only when you want to save, edit or export.

Final RAMS must be reviewed and approved by a competent person before use.