Site-specific RAMS for UK construction work

Construction RAMS that hold up on a CDM site — not a generic template and not a chatbot paragraph. Riskora structures the document for your trade and site. 100+ industries supported.

UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Example UK (RAMS) front cover produced by Riskora
Try the new compact mode. Same document, just more compact

Full version

Preview first. No card needed. Download when you're happy.

  • Free to start
  • No signup to preview
  • Done in ~60 seconds

Built around CDM duty-holder expectations: principal contractor review, site logistics, working at height, plant interface, permits, RAMS briefings and sign-off.

  • UK · IE · US · CA · AU · NZ
  • RAMS · SWMS · JHA · JSA · COSHH · Task Analysis · Toolbox Talks
  • Site-specific — not a blank template
  • First document free · No card required
You're probably here because…
  • Principal contractor wants RAMS before you set foot on site.
  • You won a package and the client wants paperwork by Friday.
  • Your last RAMS came back marked up by the site team.
  • You need one document that works across trades on the same job.
What to add to the box
  • The principal contractor's RFI or email
  • Scope of works or sub-contract package
  • Site manager WhatsApp / message
  • An older RAMS for a similar project
  • Tender or PQQ requirements
Inside the document

What Riskora builds into every construction RAMS

Trade-specific hazards

Groundworks, roofing, fit-out, services, civils — hazards selected for the actual trade.

Hierarchy of controls

Elimination first, PPE last — and residual risk shown after controls.

Sequenced method statement

Step-by-step method with responsible person, plant interface and hold points.

Working at height & plant

Edge protection, MEWPs, scaffolds, lifting and pedestrian segregation where relevant.

Permits & RAMS-to-permit links

Hot works, excavation, confined spaces and isolation permits referenced from the method.

Emergency arrangements

First aid, fire, spill, rescue and escalation specific to a CDM site.

Site logistics & welfare

Access, deliveries, segregation, welfare and environmental considerations.

Briefing & sign-off register

Briefing record, version lock and audit trail inside your workspace.

Principal contractor-ready PDF

Branded, paginated PDF you can submit to PC without reformatting.

Example output

What a construction RAMS from Riskora looks like

Structured for CDM duty-holders. Hazards mapped to controls, sequenced method, plant and PPE, permits and emergency arrangements on their own pages.

Not a blank template

Why this isn't a stock construction RAMS template

Stock construction templates and generic AI chatbots can't reflect your package, your site or your sequence. Riskora is part of an end-to-end safety document and site safety management system — every construction RAMS lands in your workspace alongside risk assessments, method statements, COSHH, toolbox talks and sign-off records.

Inside the document

What your RAMS actually contains

Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.

  • Hazards

    Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.

  • Controls

    Control measures mapped to each hazard with residual risk scoring after controls are applied.

  • PPE

    PPE requirements tied to the activity and site, ready to brief to the team.

  • Method steps

    Step-by-step method statement structured around how the work is actually sequenced on site.

  • Emergency arrangements

    First aid, rescue plan, emergency contacts and site-specific escalation routes.

  • COSHH prompts

    Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.

  • Sign-off

    Operative sign-off captured against the document — names, dates and acknowledgement of the brief.

  • Version history

    Every change tracked so you can show what was issued, when, and which version the team signed.

  • Approval status

    Clear approval state on every document — draft, in review, approved, issued — visible across the team.

  • Audit trail

    Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.

Before & after

From copied-and-pasted to site-specific

The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.

Before

Generic template copied from an old job.

  • • Hazards and controls that don't match this site or task.
  • • Method steps written for a different sequence of work.
  • • No emergency arrangements specific to the location.
  • • Client flags it as generic and asks for a rewrite.
After

Site-specific document structured around this job, site and task.

  • • Hazards captured from the actual scope you pasted in.
  • • Method steps sequenced for how the work runs on site.
  • • Emergency arrangements and rescue plan tied to the location.
  • • Approved internally, briefed to the team, signed off and stored.
How it works

From job details to signed-off document

A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.

  1. 1
    Paste job details

    Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.

  2. 2
    Riskora structures the document

    Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.

  3. 3
    Review, edit and download

    You stay in control of every section. Tweak anything, then download a clean PDF or share a link.

  4. 4
    Brief the team and record sign-off

    Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.

Built for site reality

Built by people who've written this paperwork on real sites

Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.

  • Built for contractors, consultants and teams
    Solo trades, principal contractors and in-house safety teams all run on the same workflow.
  • Supports multiple countries
    UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard.
  • Not just documents
    Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.
Start in seconds

Describe the package — get a CDM-ready construction RAMS

Drop in the package, the PC email or your site manager's notes. Riskora structures the document for the trade.

Preview first. No card needed. Download when you're happy.

FAQ

Questions for this exact situation

Yes. RAMS are structured for principal contractor review — hazards, controls, sequenced method, permits, plant interface, emergency arrangements and briefing/sign-off.

Yes. Riskora handles groundworks, roofing, fit-out, M&E, civils, services and finishing trades — each with trade-specific hazards.

Yes. Riskora can build a worker-facing toolbox talk from the key hazards and method points in the RAMS.

Yes. Site, scope, plant, access and conditions are captured and reflected in the document.

No. Riskora structures the content; a competent person should review and approve before issue.

Yes — your first construction RAMS is free, no card. Paid plans add unlimited documents, projects and team access.

Riskora helps structure a site-specific safety document. It does not replace competent review, site supervision, client requirements or legal duties. Always check the final document before issue.