London is the most regulated construction environment in the UK. Beyond the standard CDM 2015 and HSE expectations, every site sits inside at least one borough's planning conditions, often a TfL red-route permit zone, frequently a Section 61 prior consent area for noise, and increasingly the Ultra Low Emission Zone (ULEZ) for plant and deliveries. A RAMS that doesn't acknowledge this layered framework rarely makes it past induction.
UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Full version
London RAMS need to address the borough's planning conditions, any Section 61 noise consent, TfL highway permits where the site abuts a Red Route, ULEZ-compliant plant declarations, and (for many central sites) Considerate Constructors Scheme commitments. The HSE-aligned core is the same — what changes is the planning, environmental and traffic-management layer wrapped around it.
A boilerplate UK construction RAMS will get rejected on most central London sites. Principal contractors and CDM coordinators look for explicit references to the local conditions: TfL lane rental fees, the borough's permitted working hours, NRSWA Section 50 licences for any utility opening, ULEZ-compliant vehicle declarations for deliveries, and (for sites near the Underground) LU Asset Protection consultations. Without these, a competent reviewer will assume the contractor hasn't read the planning conditions — and bounce the RAMS back.
Working in London means satisfying HSE duties under HASAWA 1974 and CDM 2015 plus the borough's planning conditions, the Mayor of London's NRMM standards (since 2015 across Greater London), and any TfL or LU asset-protection requirements where applicable. RAMS that name these explicitly are far more likely to be approved on first submission.
Use a structured RAMS that lets you bolt on the London-specific layer without rewriting the core. Riskora's builder applies the standard hierarchy of controls and HSE-aligned hazards, then leaves space for the project-specific Section 61 number, CLP reference, ULEZ plant list and traffic-management plan. Pair it with our Working at Height assessor and the 5×5 risk score calculator to get the standard parts right before you layer the London context on top.
Before you generate your document, these guides cover the knowledge that underpins every good RAMS, risk assessment, and method statement.
RAMS for Construction
The CDM 2015-aligned core that London projects build on top of.
RAMS for Road Works & Traffic Management
Essential for any project working on or adjacent to TfL Red Routes or borough highways.
RAMS for Excavation Near Utilities
Highly relevant in central London where utility density is among the highest in Europe.
RAMS for Work Near Railways
Covers Network Rail and Underground asset-protection consultation requirements.
CDM 2015 Risk Assessment
The foundational regulation behind every London construction RAMS.
Section 61 of the Control of Pollution Act 1974 is a voluntary prior consent — you apply to the borough's Environmental Health team for agreed working hours and noise limits. It's not mandatory, but without one the borough can issue a Section 60 notice mid-job that stops work. Most central London principal contractors require a Section 61 to be in place before site mobilisation, and your RAMS should reference the consent number and agreed hours.
The core risk assessment doesn't change between boroughs, but the wrapper does. Westminster, Camden and the City of London have stricter quiet-hours and out-of-hours restrictions than outer boroughs. Tower Hamlets and Southwark have specific construction logistics plans (CLPs) for many wards. Your method statement should reference the borough's specific conditions rather than a generic 'comply with local authority requirements' line.
A small fit-out contractor wins a £38k shopfront refurbishment on Marylebone High Street. The unit is on a borough-controlled (not TfL) road, but Westminster's quiet hours apply: no noisy work before 08:00 or after 18:00 weekdays, none before 09:00 Saturdays, none on Sundays. The principal designer requires RAMS submitted at least seven days before mobilisation.
The contractor uses Riskora's Refurbishment / Strip-Out preset for the standard hazards — manual handling of glazing, work at height for the new fascia, dust suppression for plaster removal, electrical isolation under BS 7671. They then add the London layer: Westminster pavement licence number for the small skip and welfare unit, a NRMM declaration for the petrol-driven cut-off saw (Stage V compliant), the agreed delivery window (06:30 unloading direct to van, finished by 07:45 to clear the loading bay before retail trading), and a Section 61 reference for the two days of hammer-action drilling.
The RAMS is approved on first submission. Three weeks in, an Environmental Health officer responds to a noise complaint — because the Section 61 is in place and being followed, no notice is issued and work continues uninterrupted.
1. Listing 'comply with local authority requirements' without naming the borough or condition
Why it fails: Westminster and the City of London review RAMS for their high-profile sites. A generic line tells the reviewer the contractor hasn't read the planning consent.
Fix: Quote the planning condition number and reference the specific borough Environmental Health contact or planning officer name.
2. Submitting plant lists with no NRMM declaration
Why it fails: Greater London has required Stage IIIB minimum (Stage IV/V on larger sites) for non-road mobile machinery since 2015. Non-compliant plant gets refused at the gate on most central sites.
Fix: Include a plant register with engine make, model, Stage rating and (where required) the NRMM Register reference number for each unit.
3. No Construction Logistics Plan reference for sites that need one
Why it fails: Most planning consents in zones 1-2 condition a CLP. Without referencing the approved delivery windows, vehicle types and route, principal contractors can't sign off the RAMS.
Fix: Reference the CLP document number, agreed delivery window, and any holding-bay arrangement explicitly in the method statement.
Will this take long?
Under 5 minutes. Select your trade, pick hazards, download.
Is it complicated?
No training needed. The guided builder walks you through every step.
Do I need experience?
If you know what work you're doing, you can use Riskora.
Is it free to try?
Yes. The Free plan needs no card — generate, review and download one free PDF. Upgrade any time for branding, sign-off and higher limits.
Create your RAMS in under 5 minutes
No onboarding or setup needed — start generating documents instantly
Try Riskora FreeNo card required · 1 lifetime safety document · Upgrade when you need more
All documents generated by Riskora should be reviewed by a competent person before use on site. Riskora provides structured templates — professional judgement is always required.
"London-specific compliance — Section 61, CLPs, NRMM and TfL permits — is what separates an approved London RAMS from a rejected one. The HSE core is necessary but not sufficient."
Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.
Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.
Control measures mapped to each hazard with residual risk scoring after controls are applied.
PPE requirements tied to the activity and site, ready to brief to the team.
Step-by-step method statement structured around how the work is actually sequenced on site.
First aid, rescue plan, emergency contacts and site-specific escalation routes.
Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.
Operative sign-off captured against the document — names, dates and acknowledgement of the brief.
Every change tracked so you can show what was issued, when, and which version the team signed.
Clear approval state on every document — draft, in review, approved, issued — visible across the team.
Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.
The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.
Generic template copied from an old job.
Site-specific document structured around this job, site and task.
A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.
Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.
Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.
You stay in control of every section. Tweak anything, then download a clean PDF or share a link.
Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.
Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.
No training. No complex setup. Just select your trade and go.
Primary UK sources covering the legal and practical framework behind RAMS, risk assessments and method statements.
Generate a preview first. Sign up only when you want to save, edit or export.
Final RAMS must be reviewed and approved by a competent person before use.
Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.