RAMS stands for Risk Assessment and Method Statement — the combined site-safety document a UK principal contractor reviews before letting any sub-contractor start work. This hub answers what RAMS means, links seven worked examples by trade, and explains the CDM 2015 and MHSWR 1999 rules behind it.
RAMS stands for Risk Assessment and Method Statement — a single combined document that sets out the hazards of a construction task and the step-by-step safe method of doing it. On UK sites it is the working safety document a principal contractor reviews before letting a sub-contractor onto site.
The risk-assessment half is required by Regulation 3 of the Management of Health and Safety at Work Regulations 1999. The method-statement half is the practical sequence of work the operatives will follow. Together they cover the task, the people doing it, the plant and substances used, the residual risk after controls, and the supervision and review arrangements. CDM 2015 Regulation 15 makes the contractor responsible for producing it.
The fastest way to write a RAMS that passes review is to read a real one for the same trade. We publish seven worked UK RAMS examples — scaffolding, electrical first-fix, groundworks, roofing, hot works, soft-strip demolition and lifting operations — each with the exact section headings a principal contractor scans for.
Every example pairs a populated risk-assessment table (hazard · who's at risk · existing controls · residual risk · further action) with a sequenced method statement, sign-off block and review trigger. They're written to the structure HSG150, HSG168, HSG185 and the CDM 2015 ACoP expect, so you can lift the format directly.
A method statement is the work sequence. A risk assessment is the hazard analysis. RAMS is both, bound together so the controls in the risk assessment line up with the steps in the method. Submitting a method statement alone is one of the most common reasons a principal contractor sends paperwork back.
If the task is low-risk and repetitive, a generic risk assessment plus a short method statement may be accepted. If the task involves work at height, hot works, confined space, asbestos, lifting or service strikes, the PC will expect a combined site-specific RAMS — and they will check that each method step references the risk-assessment controls.
A RAMS that passes first review has eight clear sections: scope, site/programme detail, hazards and controls, sequenced method, PPE and plant, competence and training, emergency arrangements, and sign-off. Most rejections come from missing site-specific detail, generic copy-paste hazards, or a method that does not sequence the work.
Principal contractors are scanning for site address, project reference, named supervisor, the specific plant and substances on this job, and a hazard list that matches the work in front of them. They are not looking for length — they are looking for site specificity.
RAMS stands for Risk Assessment and Method Statement. It is one combined document — the risk assessment identifies the hazards of a construction task and the controls in place, and the method statement sets out the safe, sequenced way of doing the work.
Is a RAMS legally required on UK construction sites?
A written risk assessment is legally required under the Management of Health and Safety at Work Regulations 1999 for any employer with five or more employees, and CDM 2015 makes contractors responsible for planning, managing and monitoring construction work safely. In practice every UK principal contractor will require a site-specific RAMS before letting a sub-contractor start.
What is the difference between a RAMS and a method statement?
A method statement only describes how the work will be done. A RAMS is a method statement plus the risk assessment that justifies the controls in it. On most UK sites the principal contractor will reject a stand-alone method statement for medium- or high-risk work.
How long should a construction RAMS be?
There is no required length. A short tiling job might be three pages; a multi-day lift operation could be twenty. What matters is that the document is site-specific, sequences the actual work, and the controls in the risk assessment line up with the steps in the method.
Where can I find a worked RAMS example for my trade?
Our RAMS examples page has seven full worked UK examples — scaffolding, electrical, groundworks, roofing, hot works, demolition and lifting — each in the format principal contractors expect.