Skip to content
Your first safety document is free.No card required

UK construction risk assessments

Construction risks.
Clearly assessed.
Ready in minutes.

Turn your work package into a structured construction risk assessment. Bring the task, people, hazards and controls together in a professional PDF, ready for your site review.

  • Free to start
  • Preview before sign-up
  • PDF download
See a real Riskora document

Preview before signup. Your first lifetime safety document is free. No card required.

YOUR FIRST DOCUMENT, FREE

What construction work are you planning?

Start with a short scope, the site and the main constraints.

UK construction risk assessment

Up to 200 characters. Summarise the work; you can refine the details in the builder.

This is the title that appears on your document.

Generate a preview first. Sign up only when you want to save, edit or export.

No card required 1 lifetime safety document

REAL DOCUMENT. REAL DETAIL.

See the difference yourself.

Explore a real Riskora safety document and see the structure, depth and professional finish for yourself.

Example Riskora document · UK RAMS

Try the new compact mode. Same document, just more compact

Full version

UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Example UK (RAMS) front cover produced by Riskora

Explore the real UK construction RAMS from our homepage in Full or Compact format. This combined risk assessment and method statement demonstrates Riskora’s document presentation; it is not a standalone construction risk assessment.

FROM DETAILS TO DOCUMENT

Your first document. Three simple steps.

Start with the details you know. See your document before you sign up.

  1. 01

    Describe the package

    Name the trade, location, equipment and an important site constraint. A concise brief gives the assessment a useful starting point without filling out a blank document.

  2. 02

    Review the site risks

    Check the proposed hazards, people affected and controls against the actual work. Add the principal contractor’s requirements and resolve anything the brief could not establish.

  3. 03

    Issue your PDF

    Sign up free to save, edit and download your first document. Review the completed assessment with the people responsible for the work before it is used on site.

Create my risk assessment free

No card required · Your first safety document is free

Built around your construction package

A useful assessment starts with the actual site

Groundworks, structural work and an occupied-building fit-out have different risks. Give the reviewer enough detail to understand your package and the precautions it needs.

HSE — Managing risks and risk assessment at work
01

Scope and work boundaries

Identify the activity, work area and package boundaries. Set out exclusions and dependencies, such as access being handed over or another contractor completing an isolation, so responsibilities are clear.

02

People and neighbouring work

Consider operatives, other trades, visitors, occupants and the public. Shared delivery routes, overhead work and changing pedestrian access can alter a familiar task. Record the interfaces the site team needs to coordinate.

03

Hazards and practical controls

Connect hazards to the equipment and work described. Explain what each control involves, who will arrange it and what must be ready before starting. Check initial and residual risk against the precautions available.

04

Health risks as well as injuries

Include relevant dust, noise, vibration, substance and material-handling risks. Match controls to the process and its duration. Identify any separate assessment or specialist information needed to complete the picture.

05

Plant, access and site arrangements

Record access equipment, material movements and restrictions. Check proposed precautions against the site layout, available space and other activities, so the team can resolve conflicts before the crew arrives.

06

Actions, emergencies and review

Make outstanding actions, responsible people and local emergency arrangements clear. Update the assessment when conditions or methods change, so the issued PDF reflects the work the crew will carry out.

For contractors and site teams

Give the principal contractor something specific to review

A request for a construction risk assessment often arrives with a start date attached. Riskora helps turn a short package description into organised paperwork in minutes, so your time goes into checking the work rather than rebuilding tables. Include the detail that makes this site different from the last one.

A risk assessment records the risks and controls; a method statement explains the working sequence. Some clients request both as RAMS. A construction phase plan has a separate project-management purpose. Choose the document requested, then coordinate it with the relevant site arrangements and the people managing the work.

  • Give the activity and location: for example, drainage beside an occupied access road rather than simply groundworks.
  • Mention equipment and constraints that affect the method, including plant access, restricted space and nearby occupants.
  • Check what the principal contractor has already provided and which controls your own team must arrange.
  • Confirm the final document against site conditions, then brief the affected team before the work starts.
Your first safety document, free

Start your construction risk assessment free.

Generate a preview first. Sign up only when you want to save, edit or export.

Final RAMS must be reviewed and approved by a competent person before use.

A FEW THINGS, ANSWERED

Construction risk assessment questions.

Practical answers before you start your first document.

What should a construction risk assessment include?

Set out the work and site, significant hazards, who could be harmed, existing precautions and further actions. Make responsibility and timing clear where additional controls are needed. Relevant specialist assessments may also be required for the task; the construction assessment should connect with those records.

HSE — Managing risks and risk assessment at work
Is a construction risk assessment the same as RAMS?

RAMS combines risk assessments with a method statement. This page starts a risk assessment for your construction work. If the client needs the working sequence as well, use the RAMS generator or create a separate method statement and check that the documents describe the same scope and precautions.

Does this replace the construction phase plan?

No. The construction phase plan sets out how the project’s construction work will be managed. Your assessment addresses risks from your activity or package. Both should be consistent, including access, coordination with other contractors and emergency arrangements. The appropriate contractor retains responsibility for project planning.

HSE — Contractor responsibilities under CDM 2015
Can I use it for a small job or an occupied building?

Yes. Describe the real size and conditions of the job. For occupied premises, include who remains nearby, shared routes, service interruptions and any restrictions on noisy or dusty work. A short job can still need careful coordination, so review the assessment for the actual site.

When should I update the assessment?

Revisit it when the scope, equipment, people or site conditions change, or when an incident, near miss or worker feedback suggests the controls need attention. Check that earlier assumptions still hold before reusing an assessment on a different project.

HSE — Managing risks and risk assessment at work
Is my first construction risk assessment free?

Yes. Your free Riskora account includes one lifetime safety document with a PDF download. Preview before signup, then create a free account to save, edit and download it. No card is required; the safety-document allowance is shared across document types.

Guidance for preparing your document

Check the relevant guidance alongside the conditions, people and work at your site.