Build RAMS for Hot Works — Permit, Fire Watch, Cool-Down | Riskora

Paste the job and build a site-specific RAMS for hot works — welding, cutting, grinding, brazing, torch-on. Permit to work, fire watch, extinguishers, cool-down period and combustibles control.

Frequently asked questions

What counts as hot work?
Welding, brazing, soldering, cutting, grinding, torch-on roofing, lead burning, or any operation that produces sparks, flame or heat capable of igniting combustibles.
How long is the fire watch?
Insurer-standard is during the work plus a minimum 60 minutes after — Riskora records this against the permit and prompts the signing-off check.
Do detector isolations need permits?
Yes — most FM regimes require a separate detector isolation permit. Riskora prompts you to record the permit number and reinstatement check.
Can I link the permit to the RAMS?
Yes — attach the permit number / FM reference so reviewers see the documents are paired.