RAMS problem you need solved today?

Rejected by the principal contractor, needed on site by tomorrow morning, or knocked back for being too generic? Riskora rebuilds it into a structured, site-specific RAMS with hazards, controls, method, PPE, permits, emergency arrangements and sign-off. Free preview, no card. 100+ industries supported.

Preview first. No card needed. Download when you're happy.

  • Free to start
  • No signup to preview
  • Done in ~60 seconds

Not a blank template. Not AI prose. A structured RAMS — CDM 2015 aware, with the sections principal contractors expect. Competent-person review still required before issue.

  • UK · IE · US · CA · AU · NZ
  • RAMS · SWMS · JHA · JSA · COSHH · Task Analysis · Toolbox Talks
  • Site-specific — not a blank template
  • First document free · No card required
You're probably here because…
  • Principal contractor just rejected the RAMS and you're on site tomorrow.
  • Client emailed asking for paperwork by end of day.
  • Reviewer flagged the rescue plan / emergency arrangements as missing.
  • You're using an old template that keeps getting questioned.
What to add to fix or build fast
  • The rejection comment from the PC
  • The client email asking for paperwork
  • The site manager's WhatsApp or text
  • The scope of works or job description
  • The previous RAMS that got knocked back
  • Site rules, permits or induction pack
Inside the document

Pick the scenario Riskora rebuilds around

Six urgent situations — each one produces a structured RAMS built around the specific fault the reviewer is flagging.

RAMS rejected

Principal contractor sent it back? Rebuild into a cleaner, contractor-ready version with the sections they actually check.

Need RAMS today

Single trade, short timeline. Structured workflow + same-day review checklist before you send.

RAMS for site tomorrow

Starting in the morning. Walk the pre-start checklist tonight, in front of a competent person before 7am.

Fix a failed RAMS

Failed review on a specific section. Rebuild just the weak sections without starting from scratch.

Free RAMS validator

Not sure if your draft is complete? Run it through the validator and see what's missing before you submit.

Template isn't enough

Static template not landing with the contractor? See what a structured builder adds a blank doc can't.

Example output

A site-ready RAMS, rebuilt from your situation

See how Riskora rebuilds a rejected or half-finished RAMS into a structured document for UK PC review — every section editable before issue.

Not a blank template

Templates fail here — structure doesn't

The reason your last RAMS got rejected is almost always the same: a template with generic wording, no site context, no matched controls, no rescue plan. Riskora produces a structured RAMS — not prose — with the sections principal contractors, insurers and clients actually check.

Inside the document

What your RAMS actually contains

Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.

  • Hazards

    Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.

  • Controls

    Control measures mapped to each hazard with residual risk scoring after controls are applied.

  • PPE

    PPE requirements tied to the activity and site, ready to brief to the team.

  • Method steps

    Step-by-step method statement structured around how the work is actually sequenced on site.

  • Emergency arrangements

    First aid, rescue plan, emergency contacts and site-specific escalation routes.

  • COSHH prompts

    Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.

  • Sign-off

    Operative sign-off captured against the document — names, dates and acknowledgement of the brief.

  • Version history

    Every change tracked so you can show what was issued, when, and which version the team signed.

  • Approval status

    Clear approval state on every document — draft, in review, approved, issued — visible across the team.

  • Audit trail

    Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.

Before & after

From copied-and-pasted to site-specific

The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.

Before

Generic template copied from an old job.

  • • Hazards and controls that don't match this site or task.
  • • Method steps written for a different sequence of work.
  • • No emergency arrangements specific to the location.
  • • Client flags it as generic and asks for a rewrite.
After

Site-specific document structured around this job, site and task.

  • • Hazards captured from the actual scope you pasted in.
  • • Method steps sequenced for how the work runs on site.
  • • Emergency arrangements and rescue plan tied to the location.
  • • Approved internally, briefed to the team, signed off and stored.
How it works

From job details to signed-off document

A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.

  1. 1
    Paste job details

    Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.

  2. 2
    Riskora structures the document

    Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.

  3. 3
    Review, edit and download

    You stay in control of every section. Tweak anything, then download a clean PDF or share a link.

  4. 4
    Brief the team and record sign-off

    Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.

Built for site reality

Built by people who've written this paperwork on real sites

Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.

  • Built for contractors, consultants and teams
    Solo trades, principal contractors and in-house safety teams all run on the same workflow.
  • Supports multiple countries
    UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard.
  • Not just documents
    Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.
Start in seconds

Start rebuilding now

Describe the rejection comment, the client email or the scope. Riskora structures the RAMS around the actual situation so you can review, edit and issue today.

Preview first. No card needed. Download when you're happy.

FAQ

Questions for this exact situation

Most users have a first draft inside 60 seconds and a fully edited, ready-to-issue RAMS inside 10–15 minutes. Riskora structures the document — you refine the site-specific details before sign-off.

It produces a structured starting point covering the sections commonly reviewed on UK sites: named site, sequenced hazards and controls, method statement, PPE, permits, emergency arrangements and sign-off. CDM compliance and acceptance depend on the actual work and site, so a competent person must review and amend it before issue.

Paste it anyway. Riskora catches the most common rejection reasons (not site-specific, missing rescue plan, missing COSHH, weak emergency arrangements, generic controls) and rebuilds the sections that trigger them.

Yes. Riskora helps you prepare the document. A competent person on your side must review and sign it off before it's issued to site.

Yes — the free plan includes one lifetime RAMS with no card. Paid plans add higher limits; projects and team sign-off begin on the Team tier.

Riskora helps structure a site-specific safety document. It does not replace competent review, site supervision, client requirements or legal duties. Always check the final document before issue.