Stop filling in a blank UK method statement template

A PDF template gives you the headings. Riskora structures the document from your scope — sequenced method, responsibilities, PPE, hold points and emergency arrangements — so a competent person can review and sign off. 100+ industries supported.

Preview first. No card needed. Download when you're happy.

  • Free to start
  • No signup to preview
  • Done in ~60 seconds

Covers the same sections a proper UK method statement template covers — scope, sequence, plant, PPE, permits, hold points, emergency arrangements and briefing — except Riskora actually fills them in for your job.

  • UK · IE · US · CA · AU · NZ
  • RAMS · SWMS · JHA · JSA · COSHH · Task Analysis · Toolbox Talks
  • Site-specific — not a blank template
  • First document free · No card required
You're probably here because…
  • You downloaded a method statement template and didn't get past page 1.
  • The principal contractor wants a method statement before site access.
  • Your last one got knocked back as 'a paragraph, not a method'.
  • You need a template that understands UK contractor expectations.
What to add to the box
  • Client email asking for a method statement
  • Scope of works or quote
  • Site manager WhatsApp or message
  • An existing template to fill in properly
  • A risk assessment to pair the MS with
Inside the document

Every section a UK method statement template should cover — filled in

Scope & site info

Activity, location, dates and team — populated at the top of the document.

Roles & responsibilities

Supervisor, lead, first-aider, banksman — who does what on the day.

Plant, tools & equipment

Equipment in use, inspection requirements and certification.

Materials & substances

Materials in use and any COSHH cross-references.

Step-by-step method

Chronological sequence with the responsible person per step.

Hold points & checks

Inspection and check points between phases of work.

Emergency arrangements

First aid, fire, spill, rescue and escalation specific to the task.

Briefing & sign-off

Briefing register, version lock and audit trail inside your workspace.

Cross-reference to risk assessment

Hazards from the RA referenced inside the method steps.

Example output

What a finished method statement from this template looks like

Numbered steps in order, responsible person per step, equipment, PPE and hold points — not paragraphs. Built so a UK principal contractor can sign off on the first read.

Not a blank template

Why this beats a PDF template — and a generic AI chatbot

Word templates leave every step blank. Chatbots produce paragraphs that don't survive review. Riskora is part of an end-to-end safety document and site safety management system — the method statement lands in your workspace alongside risk assessments, RAMS, COSHH, toolbox talks and sign-off.

Inside the document

What your RAMS actually contains

Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.

  • Hazards

    Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.

  • Controls

    Control measures mapped to each hazard with residual risk scoring after controls are applied.

  • PPE

    PPE requirements tied to the activity and site, ready to brief to the team.

  • Method steps

    Step-by-step method statement structured around how the work is actually sequenced on site.

  • Emergency arrangements

    First aid, rescue plan, emergency contacts and site-specific escalation routes.

  • COSHH prompts

    Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.

  • Sign-off

    Operative sign-off captured against the document — names, dates and acknowledgement of the brief.

  • Version history

    Every change tracked so you can show what was issued, when, and which version the team signed.

  • Approval status

    Clear approval state on every document — draft, in review, approved, issued — visible across the team.

  • Audit trail

    Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.

Before & after

From copied-and-pasted to site-specific

The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.

Before

Generic template copied from an old job.

  • • Hazards and controls that don't match this site or task.
  • • Method steps written for a different sequence of work.
  • • No emergency arrangements specific to the location.
  • • Client flags it as generic and asks for a rewrite.
After

Site-specific document structured around this job, site and task.

  • • Hazards captured from the actual scope you pasted in.
  • • Method steps sequenced for how the work runs on site.
  • • Emergency arrangements and rescue plan tied to the location.
  • • Approved internally, briefed to the team, signed off and stored.
How it works

From job details to signed-off document

A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.

  1. 1
    Paste job details

    Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.

  2. 2
    Riskora structures the document

    Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.

  3. 3
    Review, edit and download

    You stay in control of every section. Tweak anything, then download a clean PDF or share a link.

  4. 4
    Brief the team and record sign-off

    Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.

Built for site reality

Built by people who've written this paperwork on real sites

Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.

  • Built for contractors, consultants and teams
    Solo trades, principal contractors and in-house safety teams all run on the same workflow.
  • Supports multiple countries
    UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard.
  • Not just documents
    Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.
Start in seconds

Describe the job — get a populated method statement

Drop in the scope, the client email or a site manager's message. Riskora structures the sequence.

Preview first. No card needed. Download when you're happy.

FAQ

Questions for this exact situation

The first method statement is free, no card. You don't need to download a blank template — paste the job and Riskora structures the document.

Scope, roles, plant and equipment, materials and substances, step-by-step method, hold points, PPE, emergency arrangements, briefing and sign-off.

Yes. Every step, role and control is editable before you download the PDF.

It's built for that. Sequence, responsibilities, hold points and emergency arrangements all in the format UK PCs expect.

Yes — pair with a standalone risk assessment, or generate them together as a RAMS.

No. Riskora structures the content; a competent person should review and approve before issue.

Riskora helps structure a site-specific safety document. It does not replace competent review, site supervision, client requirements or legal duties. Always check the final document before issue.