The reality of refurbishment asbestos survey on a live UK site is that the risks are well known and well documented — and the law expects them to be managed in writing. Asbestos remains the single largest cause of work-related death in the UK, killing roughly 5,000 people every year — and the risk does not end when removal work begins. For refurbishment asbestos survey specifically, HSG264 requires an R&D survey before any refurbishment work in pre-2000 buildings. A Method Statement written specifically for this activity is the only practical way to evidence that the risks have been thought through before work starts.
Example Method Statement
Method Statement for Refurbishment Asbestos Survey — UK
No card required · 1 lifetime safety document · Upgrade when you need more
HSG264 requires an R&D survey before any refurbishment work in pre-2000 buildings. The survey must be carried out by a UKAS-accredited surveyor. The method statement must cover the survey methodology and precautions for encountering ACMs.
A specialist subcontractor delivering a contract has discovered that the existing template they have been using does not actually cover the activities on the new job — they need a fresh Method Statement. Using Riskora, they pick the relevant trade preset, drop in the project address, refine the pre-loaded hazards for refurbishment asbestos survey, and export a clean PDF ready for sign-off the same afternoon. The finished document explicitly addresses surveyor disturbing acms during invasive inspection, which the principal contractor would otherwise expect to see written into the pack.
Select your trade, pick your hazards, and generate a structured document — no training required.
Create a refurbishment asbestos survey method statement freeNo card required · 1 lifetime safety document · Paid tiers add branding, sign-off and audit trails
Or learn more about the platform: See plans and one-off options →
All documents should be reviewed by a competent person before use on site.
Generate a preview first. Sign up only when you want to save, edit or export.
Final RAMS must be reviewed and approved by a competent person before use.
Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.