Most electrical installation work happens above shoulder height — ceiling voids, lighting installations, containment runs, distribution boards mounted at 1.8m. Falls from low heights (under 2m) account for a disproportionate share of construction injury statistics, and electricians are particularly exposed because the work demands two-hand precision while balanced. A RAMS for electrical working at height must address access selection (podium vs ladder vs MEWP) against the actual task duration and reach, not assume a one-size step-up.
Build RAMS for this trade and hazardNo account required for the preview · No card required
Work at Height Regulations 2005
Regulation 7 & Schedule 6
Selection of work equipment must consider the working conditions, distance to be negotiated, distance and consequences of a potential fall, duration and frequency of use.
HSE INDG402 Safe Use of Ladders & Stepladders
All
Ladders only for short-duration work (under 30 minutes), light loads (under 10kg), 3-point contact maintained.
Every UK RAMS reviewer applies the hierarchy of controls in the order below. Defaulting straight to PPE is the single most common reason a RAMS fails review.
1. Eliminate
Pre-fabricate luminaires and containment at ground level, lift complete assemblies into position with a MEWP.
2. Substitute
Use a podium step (caged platform) instead of a stepladder for any work taking more than 30 minutes at a single position.
3. Engineering controls
MEWP for ceiling void runs. PASMA-trained mobile tower for vertical risers. Podium platforms for board terminations.
4. Administrative controls
Pre-task assessment confirming the equipment matches the duration. No ladder use for two-handed work.
5. PPE (last line)
Helmet, slip-resistant boots. Harness only when MEWP working and tied to internal anchor.
Defaulting to 'stepladders will be used' for all working-at-height tasks. Stepladders are inappropriate for any work that exceeds the duration, load or balance limits in INDG402, and a blanket RAMS choice will be rejected by any PC trained to the WAH hierarchy.
An illustrative extract structured for principal-contractor review. Site-specific facts must be substituted and checked by a competent person.
Access equipment will be selected per task: ceiling void containment runs will use a 1.5m podium step (caged); luminaire installation in plant rooms will use a PASMA-trained mobile tower (3.5m platform height, outriggers deployed); board terminations at 1.8m will use a single podium step. Stepladders are not permitted for any installation activity exceeding 30 minutes or requiring two-handed work. All access equipment inspected pre-use and weekly recorded inspection by site supervisor.
Pre-use inspection logged daily. Weekly recorded inspection (Reg 12). Toolbox talk on equipment selection at start of each new phase.
Can electricians use stepladders?
Yes, but only for short-duration (under 30 minutes), light-load, single-handed tasks — exactly the limits set by HSE INDG402. Most electrical installation tasks exceed at least one of those limits and need a podium or tower.
Do electricians need a MEWP licence?
An IPAF PAL card is the industry-recognised competence certificate for MEWP operation. Most sites will require it for any 1B (vertical) or 3B (boom) machine use.
Is harness required in a MEWP?
Yes — a full body harness with short restraint lanyard tied to the internal anchor is required for boom MEWPs (3a/3b). Scissor lifts (1a/1b) generally do not require a harness inside the basket but the site rules may differ.
Riskora prompts the right hazards for your trade, you confirm what applies on your site, and the document downloads to clean PDF in minutes.