Site manager asked for a method statement?

Riskora turns it into a sequenced, site-specific method statement you can send back today. 100+ industries supported.

Preview first. No card needed. Download when you're happy.

  • Site-specific structure
  • Editable before download
  • Ready to issue today

Built for contractors when the site manager is gating start time with paperwork.

  • UK · IE · US · CA · AU · NZ
  • RAMS · SWMS · JHA · JSA · COSHH · Task Analysis · Toolbox Talks
  • Site-specific — not a blank template
  • First document free · No card required
You're probably here because…
  • Site manager won't let us start until they have a method statement.
  • Need a method statement for tomorrow morning's start.
  • Asked for a sequenced method for the lifting operation today.
  • Site agent rejected the generic method — needs site-specific.
What to add to the box
  • A client email asking for paperwork
  • A site manager's WhatsApp or text message
  • Scope of works or job description
  • Tender or PQQ notes for the package
  • A previous RAMS to update or improve
Inside the document

What site managers usually want in a method statement

Every section is structured around the brief you paste — not boilerplate. You confirm what applies to the site before you send the method statement.

Sequenced work steps

How the work runs from start to finish.

Plant and equipment list

What's being used, where and how.

Site-specific controls

Tied to the hazards on this site.

PPE required at each stage

Not just a generic list.

Emergency arrangements

First aid, escape, contacts.

Sign-off acknowledgement

For supervisor and operatives.

Example output

A site-ready method statement, structured

See how Riskora shapes your brief into a method statement your client or site manager will accept — every section structured, edit anything before you send it.

Not a blank template

Why a method statement template isn't enough today

A blank template still leaves every hazard, control, method step and emergency arrangement for you to write. Riskora structures a site-specific method statement around the brief you paste — the sections principal contractors and site managers actually expect.

Inside the document

What your RAMS actually contains

Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.

  • Hazards

    Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.

  • Controls

    Control measures mapped to each hazard with residual risk scoring after controls are applied.

  • PPE

    PPE requirements tied to the activity and site, ready to brief to the team.

  • Method steps

    Step-by-step method statement structured around how the work is actually sequenced on site.

  • Emergency arrangements

    First aid, rescue plan, emergency contacts and site-specific escalation routes.

  • COSHH prompts

    Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.

  • Sign-off

    Operative sign-off captured against the document — names, dates and acknowledgement of the brief.

  • Version history

    Every change tracked so you can show what was issued, when, and which version the team signed.

  • Approval status

    Clear approval state on every document — draft, in review, approved, issued — visible across the team.

  • Audit trail

    Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.

Before & after

From copied-and-pasted to site-specific

The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.

Before

Generic template copied from an old job.

  • • Hazards and controls that don't match this site or task.
  • • Method steps written for a different sequence of work.
  • • No emergency arrangements specific to the location.
  • • Client flags it as generic and asks for a rewrite.
After

Site-specific document structured around this job, site and task.

  • • Hazards captured from the actual scope you pasted in.
  • • Method steps sequenced for how the work runs on site.
  • • Emergency arrangements and rescue plan tied to the location.
  • • Approved internally, briefed to the team, signed off and stored.
How it works

From job details to signed-off document

A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.

  1. 1
    Paste job details

    Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.

  2. 2
    Riskora structures the document

    Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.

  3. 3
    Review, edit and download

    You stay in control of every section. Tweak anything, then download a clean PDF or share a link.

  4. 4
    Brief the team and record sign-off

    Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.

Built for site reality

Built by people who've written this paperwork on real sites

Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.

  • Built for contractors, consultants and teams
    Solo trades, principal contractors and in-house safety teams all run on the same workflow.
  • Supports multiple countries
    UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard.
  • Not just documents
    Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.
Start in seconds

Get the method statement to the site manager today.

Paste what they sent — Riskora structures the steps, PPE and emergency arrangements.

Preview first. No card needed. Download when you're happy.

FAQ

Questions for this exact situation

This builds a structured method statement. If you need the risk assessment too, choose RAMS at the start of the build — Riskora produces both in one document.

We can't guarantee acceptance — that's the site manager's call. Riskora produces a structured, site-specific document designed for review. You confirm the details before sending.

You can add notes and references in the editor before download. Riskora structures the written method; you attach any supporting drawings to the download.

Riskora helps structure a site-specific safety document. It does not replace competent review, site supervision, client requirements or legal duties. Always check the final document before issue.