Create an Australian SWMS from your job details

Riskora builds a Safe Work Method Statement with high-risk work activities, controls, monitoring, review and worker sign-off — structured for Australian PCBU and principal contractor review. 100+ industries supported.

Australia (SWMS) example document — Tenancy 3 Commercial Fit-Out — 88 Latrobe Street, Melbourne. Client: Latrobe Holdings Pty Ltd. Site: 88 Latrobe Street, Tenancy 3, Melbourne, VIC 3000. Scope: Cat-B fit-out of an existing 220 m² ground-floor tenancy: demolition of partitions, new steel-stud partitioning, suspended grid ceiling, joinery, electrical and data first/second fix, painting and floor coverings. Works occur during occupied-building hours under a building-manager permit. SWMS prepared because HRCW (work > 2 m on scissor lifts and powered mobile plant) is involved.

Example Australia (SWMS) front cover produced by Riskora
Try the new compact mode. Same document, just more compact

Full version

Preview first. No card needed. Download when you're happy.

  • Free to start
  • No signup to preview
  • Done in ~60 seconds

Preview before signup · First document free · No card required

  • UK · IE · US · CA · AU · NZ
  • RAMS · SWMS · JHA · JSA · COSHH · Task Analysis · Toolbox Talks
  • Site-specific — not a blank template
  • First document free · No card required
You're probably here because…
  • Principal contractor asked for a SWMS before site start
  • Generic PDF template doesn't cover HRCW properly
  • UK RAMS being reused — wrong terminology and structure
  • No worker consultation evidence on the last SWMS
What to add to the box
  • Principal contractor's email asking for a SWMS
  • Scope of works for the high-risk activity
  • Tender / pre-start pack notes
  • WhatsApp from the site supervisor
  • A previous SWMS to update for this job
Inside the document

What a Riskora SWMS includes

Every section a principal contractor expects on a structured Australian SWMS — built around the actual work.

PCBU & contractor details

Business, contact, ABN and responsible person details.

Principal contractor & site

Site address, project details and principal contractor information.

HRCW identification

Identify which high-risk construction work categories apply to the job.

Activity → hazard → control

Each activity with the hazards it introduces and the controls applied.

Monitoring & review

How controls will be monitored, by whom and how often.

Worker consultation

Sign-on register, briefing record and worker acknowledgement.

Emergency arrangements

First aid, fire, rescue and incident escalation appropriate to the work.

PDF download

Clean Australian SWMS PDF ready for site folders and PC review.

Example output

See what your finished SWMS can look like

A SWMS for high-risk construction work needs to be specific, monitored and consulted on with workers. Preview a structured Australian SWMS before you create an account.

Not a blank template

Not a blank template. Not a generic AI text wall.

Generic templates dump headings on you. Generic AI chats write paragraphs. A real SWMS is centred on HRCW identification, activity-level hazards and controls, monitoring arrangements and documented worker consultation — in Australian terminology.

Inside the document

What your SWMS actually contains

Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.

  • Hazards

    Task-specific hazards for the job, captured row by row — not a generic list pulled from an old SWMS.

  • Controls

    Control measures mapped to each hazard with residual risk scoring after controls are applied.

  • PPE

    PPE requirements tied to the activity and site, ready to brief to the team.

  • Method steps

    Step-by-step method statement structured around how the work is actually sequenced on site.

  • Emergency arrangements

    First aid, rescue plan, emergency contacts and site-specific escalation routes.

  • COSHH prompts

    Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.

  • Sign-off

    Operative sign-off captured against the document — names, dates and acknowledgement of the brief.

  • Version history

    Every change tracked so you can show what was issued, when, and which version the team signed.

  • Approval status

    Clear approval state on every document — draft, in review, approved, issued — visible across the team.

  • Audit trail

    Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.

Before & after

From copied-and-pasted to site-specific

The reason SWMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.

Before

Generic template copied from an old job.

  • • Hazards and controls that don't match this site or task.
  • • Method steps written for a different sequence of work.
  • • No emergency arrangements specific to the location.
  • • Client flags it as generic and asks for a rewrite.
After

Site-specific document structured around this job, site and task.

  • • Hazards captured from the actual scope you pasted in.
  • • Method steps sequenced for how the work runs on site.
  • • Emergency arrangements and rescue plan tied to the location.
  • • Approved internally, briefed to the team, signed off and stored.
How it works

From job details to signed-off document

A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.

  1. 1
    Paste job details

    Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.

  2. 2
    Riskora structures the document

    Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.

  3. 3
    Review, edit and download

    You stay in control of every section. Tweak anything, then download a clean PDF or share a link.

  4. 4
    Brief the team and record sign-off

    Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.

Built for site reality

Built by people who've written this paperwork on real sites

Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.

  • Built for contractors, consultants and teams
    Solo trades, principal contractors and in-house safety teams all run on the same workflow.
  • Supports multiple countries
    UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard.
  • Not just documents
    Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.
Start in seconds

Build your SWMS now

Describe the job, the principal contractor's email or your scope. Riskora structures the SWMS around the HRCW categories that apply.

Preview first. No card needed. Download when you're happy.

FAQ

Questions for this exact situation

A Safe Work Method Statement (SWMS) is a written document for high-risk construction work in Australia. It identifies the work, the hazards, the risks to health and safety and the control measures that will be used.

A SWMS is prepared before high-risk construction work starts and must be available on site while the work is being carried out. It is reviewed if the work, conditions or controls change.

A SWMS should include the work activity, the high-risk construction work involved, the hazards and risks, the control measures, how controls will be monitored and reviewed, and details of consultation with workers.

Categories defined under Australian WHS regulations — including work at height over 2 m, near energised services, in confined spaces, in or near excavations deeper than 1.5 m, demolition, asbestos and other higher-risk activities. Riskora prompts you to identify which apply.

Yes. Riskora supports Australian SWMS workflows with Australian terminology (PCBU, HRCW, principal contractor), high-risk construction work prompts and country-aware document templates.

No. RAMS is a UK term combining a risk assessment and method statement. A SWMS is an Australian document focused on high-risk construction work and the controls applied to it, with mandatory worker consultation evidence.

No. Riskora helps structure the content, but every SWMS must be developed in consultation with workers and reviewed by a competent person before issue. Compliance is a site-specific judgment.

Riskora helps structure a site-specific safety document. It does not replace competent review, site supervision, client requirements or legal duties. Always check the final document before issue.