Create a Field-Level Hazard Assessment for the work face
An FLHA (also called FLRA) is the at-the-work-face assessment Canadian crews complete before starting a task. Riskora structures it — task, hazards, controls, energy isolation, PPE and crew sign-on — in a form a supervisor can review on the spot. 100+ industries supported.
Canada (JHA) example document — Detached Garage Foundation — 27 Riverstone Crescent, Calgary. Client: M. & Mme. Beaumont (Private Client). Site: 27 Riverstone Crescent, Calgary, AB T2X 5R8. Scope: Construction of a 24' × 24' detached garage foundation: excavation to 1.2 m frost depth, strip footings, ICF stem wall to grade, granular fill, vapour barrier and 100 mm reinforced slab-on-grade. Works programmed over 12 working days with a peak crew of 3 workers.

Full version
Preview first. No card needed. Download when you're happy.
- Free to start
- No signup to preview
- Done in ~60 seconds
Preview before signup · First document free · No card required
- UK · IE · US · CA · AU · NZ
- RAMS · SWMS · JHA · JSA · COSHH · Task Analysis · Toolbox Talks
- Site-specific — not a blank template
- First document free · No card required
- Crew must complete an FLHA at the work face each shift.
- Operator (Suncor, CNRL, Cenovus, etc.) requires FLHA every job.
- Job conditions changed mid-shift — re-FLHA before continuing.
- COR audit needs documented field-level assessments.
- A client email asking for paperwork
- A site manager's WhatsApp or text message
- Scope of works or job description
- Tender or PQQ notes for the package
- A previous RAMS to update or improve
What's in every FLHA
Job-specific hazards
Hazards drawn from the task, the site and the scope you describe — not a stock list.
Hierarchy of controls
Elimination first, PPE last. Initial and residual risk shown side by side.
Step-by-step method
Sequenced steps with a person responsible for each, written for this FLHA.
PPE & equipment
Task-specific PPE, plant and inspection requirements.
Emergency arrangements
First aid, fire, spill and rescue arrangements specific to the work.
Chemicals & substances
Substance prompts appear when materials in scope need a hazardous-substance assessment.
Permits & hold points
Hot work, working at height, confined space and inspection hold points where they apply.
Briefing & sign-off
Pre-start briefing register, version lock and an audit-ready workflow.
Supervisor-reviewed FLHA PDF
Branded, paginated PDF you can issue without reformatting.
Done at the work face, not at the office
FLHAs are short by design — the hazards in front of the crew, the controls they'll apply, energy isolations, PPE and a sign-on. Riskora keeps the form short and the record auditable.
Riskora isn't a blank template or a generic AI text generator
Riskora asks for your job and site context, then structures a client-ready, site-specific Hazard Assessment: hazards, controls, method steps, PPE, emergency arrangements and sign-off — not a paragraph of AI prose. You stay in control of every section and the output is built for an audit-ready workflow.
What your Hazard Assessment actually contains
Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.
Hazards
Task-specific hazards for the job, captured row by row — not a generic list pulled from an old Hazard Assessment.
Controls
Control measures mapped to each hazard with residual risk scoring after controls are applied.
PPE
PPE requirements tied to the activity and site, ready to brief to the team.
Method steps
Step-by-step method statement structured around how the work is actually sequenced on site.
Emergency arrangements
First aid, rescue plan, emergency contacts and site-specific escalation routes.
COSHH prompts
Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.
Sign-off
Operative sign-off captured against the document — names, dates and acknowledgement of the brief.
Version history
Every change tracked so you can show what was issued, when, and which version the team signed.
Approval status
Clear approval state on every document — draft, in review, approved, issued — visible across the team.
Audit trail
Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.
From copied-and-pasted to site-specific
The reason Hazard Assessment get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.
Generic template copied from an old job.
- • Hazards and controls that don't match this site or task.
- • Method steps written for a different sequence of work.
- • No emergency arrangements specific to the location.
- • Client flags it as generic and asks for a rewrite.
Site-specific document structured around this job, site and task.
- • Hazards captured from the actual scope you pasted in.
- • Method steps sequenced for how the work runs on site.
- • Emergency arrangements and rescue plan tied to the location.
- • Approved internally, briefed to the team, signed off and stored.
From job details to signed-off document
A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.
- 1Paste job details
Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.
- 2Riskora structures the document
Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.
- 3Review, edit and download
You stay in control of every section. Tweak anything, then download a clean PDF or share a link.
- 4Brief the team and record sign-off
Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.
Built by people who've written this paperwork on real sites
Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.
- Built for contractors, consultants and teams
Solo trades, principal contractors and in-house safety teams all run on the same workflow. - Supports multiple countries
UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard. - Not just documents
Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.
Describe the job details — get a structured Hazard Assessment
Describe the job details, scope of works, email or WhatsApp message. Riskora structures the rest.
Preview first. No card needed. Download when you're happy.
Questions for this exact situation
Riskora helps structure a site-specific safety document. It does not replace competent review, site supervision, client requirements or legal duties. Always check the final document before issue.