Construction method statement — sequence, controls, sign-off

A construction method statement should describe how the work will be done — safely, in sequence, with named responsibilities. Riskora builds an editable UK method statement for competent-person and PC review. 100+ industries supported.

Preview first. No card needed. Download when you're happy.

  • Free to start
  • No signup to preview
  • Done in ~60 seconds

Not a blank template. Not loose AI prose. A structured method statement — the sections a competent reviewer expects to see — from a brief you can paste in under a minute.

  • UK · IE · US · CA · AU · NZ
  • RAMS · SWMS · JHA · JSA · COSHH · Task Analysis · Toolbox Talks
  • Site-specific — not a blank template
  • First document free · No card required
You're probably here because…
  • The PC asked specifically for a method statement, not just a risk assessment.
  • Your last method statement was rejected for missing the sequence.
  • You need a method statement paired to an existing risk assessment.
  • The scope has changed and the method statement needs a new revision.
What to add to the box
  • A client email asking for paperwork
  • A site manager's WhatsApp or text message
  • Scope of works or job description
  • Tender or PQQ notes for the package
  • A previous RAMS to update or improve
Inside the document

What Riskora builds for this method statement

Every section is built around your actual scope of work and the framework this page is about — not boilerplate. You confirm what applies to the site before you issue it.

Numbered sequence

Steps in the order the crew will actually work them.

Named responsible person

Named competent person accountable for each phase.

PPE + tools

Task-appropriate PPE and tools listed against each step.

Permits + isolations

Hot works, height, excavation, permits and isolations flagged.

Emergency arrangements

First aid, muster, escalation, nearest A&E.

Sign-off + briefing

Crew sign-on and supervisor sign-off before start.

Example output

A site-ready method statement, ready to review

See how Riskora shapes your brief into a method statement designed for competent review — every section structured, with everything editable before issue.

Not a blank template

Not a template. Not loose AI prose. A structured method statement.

Most 'method statement template' downloads are blank docs you still have to fill in, and generic AI tools produce loose prose a competent reviewer will bin. Riskora produces a structured method statement — with the sections the relevant framework expects — from a brief you can paste in under a minute.

Inside the document

What your RAMS actually contains

Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.

  • Hazards

    Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.

  • Controls

    Control measures mapped to each hazard with residual risk scoring after controls are applied.

  • PPE

    PPE requirements tied to the activity and site, ready to brief to the team.

  • Method steps

    Step-by-step method statement structured around how the work is actually sequenced on site.

  • Emergency arrangements

    First aid, rescue plan, emergency contacts and site-specific escalation routes.

  • COSHH prompts

    Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.

  • Sign-off

    Operative sign-off captured against the document — names, dates and acknowledgement of the brief.

  • Version history

    Every change tracked so you can show what was issued, when, and which version the team signed.

  • Approval status

    Clear approval state on every document — draft, in review, approved, issued — visible across the team.

  • Audit trail

    Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.

Before & after

From copied-and-pasted to site-specific

The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.

Before

Generic template copied from an old job.

  • • Hazards and controls that don't match this site or task.
  • • Method steps written for a different sequence of work.
  • • No emergency arrangements specific to the location.
  • • Client flags it as generic and asks for a rewrite.
After

Site-specific document structured around this job, site and task.

  • • Hazards captured from the actual scope you pasted in.
  • • Method steps sequenced for how the work runs on site.
  • • Emergency arrangements and rescue plan tied to the location.
  • • Approved internally, briefed to the team, signed off and stored.
How it works

From job details to signed-off document

A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.

  1. 1
    Paste job details

    Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.

  2. 2
    Riskora structures the document

    Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.

  3. 3
    Review, edit and download

    You stay in control of every section. Tweak anything, then download a clean PDF or share a link.

  4. 4
    Brief the team and record sign-off

    Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.

Built for site reality

Built by people who've written this paperwork on real sites

Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.

  • Built for contractors, consultants and teams
    Solo trades, principal contractors and in-house safety teams all run on the same workflow.
  • Supports multiple countries
    UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard.
  • Not just documents
    Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.
Start in seconds

Build your method statement now — done in minutes

Describe the job details, an email from the client, or a rough scope of works. Riskora shapes the rest around the actual task so you can review, edit and issue today.

Preview first. No card needed. Download when you're happy.

FAQ

Questions for this exact situation

A method statement describes how the work is done. A risk assessment identifies hazards and controls. RAMS combines them in one document — most UK PCs want the combined RAMS, but a standalone method statement is common on smaller jobs.

Detailed enough that a competent operative unfamiliar with the site can follow the order of work safely — but not so long the crew won't read it. Riskora balances both.

The competent person who wrote it signs it off; the site supervisor accepts it and the crew sign on before work starts.

Riskora helps structure a site-specific safety document. It does not replace competent review, site supervision, client requirements or legal duties. Always check the final document before issue.