Build CDM 2015-aligned RAMS your principal contractor will accept. Site-specific hazards, hierarchy of controls, F10 alignment. Free to try.
Frequently asked questions
- What does CDM 2015 require in a RAMS?
- CDM 2015 requires each contractor to plan, manage and monitor construction work so it is carried out without risk to health and safety. In practice the principal contractor asks for a site-specific RAMS covering hazards, controls, method sequence, PPE, permits and emergency arrangements.
- Will the principal contractor accept a generated RAMS?
- Yes — provided it is site-specific, the hazards reflect the actual work, controls are proportionate and a competent person has reviewed and signed it. Riskora provides the CDM-aligned structure; you provide the site-specific detail.
- Does this cover F10 notifiable projects?
- The RAMS structure supports F10 projects. The client / principal designer is responsible for the F10 notification itself.
- How often should CDM RAMS be reviewed?
- Before mobilisation, whenever the scope changes, after an incident and at planned intervals through the project.