What does CDM 2015 require in a RAMS?
CDM 2015 requires each contractor to plan, manage and monitor construction work so it is carried out without risk to health and safety. In practice the principal contractor asks for a site-specific RAMS covering hazards, controls, method sequence, PPE, permits and emergency arrangements.
Will the principal contractor accept a generated RAMS?
Yes — provided it is site-specific, the hazards reflect the actual work, controls are proportionate and a competent person has reviewed and signed it. Riskora provides the CDM-aligned structure; you provide the site-specific detail.
Does this cover F10 notifiable projects?
The RAMS structure supports F10 projects. The client / principal designer is responsible for the F10 notification itself.
How often should CDM RAMS be reviewed?
Before mobilisation, whenever the scope changes, after an incident and at planned intervals through the project.