Method Statement Rejected? Rebuild It Properly in Minutes

Paste the rejection comments and Riskora rebuilds your method statement with sequence of works, method steps, plant, PPE, permits and sign-off. Reviewer-grade structure, no blank templates. 100+ industries supported.

UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Example UK (RAMS) front cover produced by Riskora
Try the new compact mode. Same document, just more compact

Full version

Preview first. No card needed. Download when you're happy.

  • Site-specific rebuild
  • Structured for review
  • Ready to re-issue

Structured around HSE-recognised method statement format — review before use and adapt to your site.

  • UK · IE · US · CA · AU · NZ
  • RAMS · SWMS · JHA · JSA · COSHH · Task Analysis · Toolbox Talks
  • Site-specific — not a blank template
  • First document free · No card required
You're probably here because…
  • 'Method statement not accepted — please resubmit.'
  • Client wants a numbered sequence, not bullet points.
  • Controls listed once at the top, not per hazard.
  • No named supervisor, no emergency plan, no sign-off.
What to add to the box
  • A client email asking for paperwork
  • A site manager's WhatsApp or text message
  • Scope of works or job description
  • Tender or PQQ notes for the package
  • A previous RAMS to update or improve
Inside the document

What Riskora rebuilds

Every section is regenerated around your actual brief and the rejection reason — not boilerplate. You confirm what applies to the site before you re-issue it.

Numbered sequence of works

Concrete method steps in order, with responsible person, timing and hold points.

Task-specific hazards

Written from the actual scope in the client's email — not lifted from a template.

Controls per hazard

Collective controls first, PPE last, mapped to every hazard the client will read.

Named site + supervisor

Site address, principal contractor, competent supervisor and working hours in the cover block.

Site-specific emergency plan

Nearest A&E, muster point, first aider, escalation — not template text.

Client-ready sign-off

Author, reviewer, date, version and briefing register — the block clients tick off first.

Example output

A site-ready method statement, rebuilt

See how Riskora shapes your brief into a method statement your reviewer will accept — every section structured, edit anything before you re-issue.

Not a blank template

Fix the reasons method statement get rejected

Generic 'method statement template' downloads are blank docs. Loose AI prose won't survive a competent-person review. Riskora rebuilds a structured, site-specific method statement — with the sections principal contractors and site managers actually expect — from a brief you can paste in under a minute.

Inside the document

What your RAMS actually contains

Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.

  • Hazards

    Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.

  • Controls

    Control measures mapped to each hazard with residual risk scoring after controls are applied.

  • PPE

    PPE requirements tied to the activity and site, ready to brief to the team.

  • Method steps

    Step-by-step method statement structured around how the work is actually sequenced on site.

  • Emergency arrangements

    First aid, rescue plan, emergency contacts and site-specific escalation routes.

  • COSHH prompts

    Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.

  • Sign-off

    Operative sign-off captured against the document — names, dates and acknowledgement of the brief.

  • Version history

    Every change tracked so you can show what was issued, when, and which version the team signed.

  • Approval status

    Clear approval state on every document — draft, in review, approved, issued — visible across the team.

  • Audit trail

    Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.

Before & after

From copied-and-pasted to site-specific

The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.

Before

Generic template copied from an old job.

  • • Hazards and controls that don't match this site or task.
  • • Method steps written for a different sequence of work.
  • • No emergency arrangements specific to the location.
  • • Client flags it as generic and asks for a rewrite.
After

Site-specific document structured around this job, site and task.

  • • Hazards captured from the actual scope you pasted in.
  • • Method steps sequenced for how the work runs on site.
  • • Emergency arrangements and rescue plan tied to the location.
  • • Approved internally, briefed to the team, signed off and stored.
How it works

From job details to signed-off document

A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.

  1. 1
    Paste job details

    Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.

  2. 2
    Riskora structures the document

    Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.

  3. 3
    Review, edit and download

    You stay in control of every section. Tweak anything, then download a clean PDF or share a link.

  4. 4
    Brief the team and record sign-off

    Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.

Built for site reality

Built by people who've written this paperwork on real sites

Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.

  • Built for contractors, consultants and teams
    Solo trades, principal contractors and in-house safety teams all run on the same workflow.
  • Supports multiple countries
    UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard.
  • Not just documents
    Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.
Start in seconds

Rebuild your method statement now — done in minutes

Describe the rejection comment, the job details or the current method statement. Riskora rebuilds the rest around the actual task so you can review, edit and re-issue today.

Preview first. No card needed. Download when you're happy.

FAQ

Questions for this exact situation

Almost always because the sequence of works isn't clear, controls aren't linked to hazards, or the document isn't recognisably about this site. Client H&S teams review dozens a week — they need to see the site-specific detail immediately.

Yes — pasting the rejection email is the fastest way. Riskora reads the objections and rebuilds the sections the client flagged, in the structure they expect.

Yes. Riskora produces the document. A competent person on your side must review and sign it off before you re-issue to the client.

Riskora helps structure a site-specific safety document. It does not replace competent review, site supervision, client requirements or legal duties. Always check the final document before issue.