Build RAMS for contractors

Every new site means another RAMS, and every principal contractor has their own bar. Riskora reads your brief and produces a structured, site-specific RAMS — trade hazards, controls, method, PPE, permits and sign-off — instead of a re-badged template that gets kicked back. 100+ industries supported.

UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Example UK (RAMS) front cover produced by Riskora
Try the new compact mode. Same document, just more compact

Full version

Preview first. No card needed. Download when you're happy.

  • Free to start
  • No signup to preview
  • Done in ~60 seconds

Riskora structures your brief into a site-specific RAMS for contractors — hazards, controls, PPE, permits, method steps and emergency arrangements. Not a generic template.

  • UK · IE · US · CA · AU · NZ
  • RAMS · SWMS · JHA · JSA · COSHH · Task Analysis · Toolbox Talks
  • Site-specific — not a blank template
  • First document free · No card required
You're probably here because…
  • Principal contractor won't grant site access until RAMS are in.
  • Last submission came back: 'not site-specific'.
  • Multi-trade job — you need separate RAMS per discipline.
  • You're on a new site every week and rewriting from scratch is killing your evenings.
What to paste into the box
  • Scope of works for the contractors
  • A client email, PQQ note or RFI
  • A site manager's WhatsApp or text message
  • Pre-start meeting notes or programme
  • A previous RAMS to update or improve
  • Drawings, permits or site rules to align with
Inside the document

Inside a Riskora RAMS for contractors

Every section is built around the actual task — not boilerplate. These are the task-specific items Riskora drops in by default for contractors, ready for you to refine and sign off.

Task-specific hazards

Slips, trips and shared-site housekeeping · Interface with other trades and live premises · Manual handling of materials on multi-floor sites · Power tools, hand-arm vibration, noise · Work at height on access equipment · Electrical, gas or water services on refurb sites

Controls matched to each hazard

Site-specific induction and daily pre-start brief · Permits to work for hot works, height, isolation · Sequenced programme with other contractors · Task-end tidy and demarcation of work areas · HAVS tool register and rotation of high-vibration tasks · Competent-person sign-off before work starts

Likely PPE

Hard hat · Hi-vis vest · Safety boots (S3) · Cut-resistant gloves · Eye protection · Ear defenders where noise > 80dB

Permits & hold points

Site induction · Hot works permit · Working at height permit · Isolation / permit to break

Emergency arrangements

Named first aider on shift · Nearest A&E route · Muster point + assembly procedure · Incident escalation to principal contractor

Method steps & sign-off

Numbered method sequence with responsible person, briefing register, and competent reviewer sign-off before work starts.

Example output

A site-ready RAMS for contractors

See how Riskora structures hazards, controls, PPE, permits and method steps into a single document specifically for contractors — edit anything before you issue it.

Not a blank template

Not a generic Contractors template

Most "RAMS for contractors" templates online are blank docs you still have to fill in, or AI prose with no structure. Riskora reads your brief and writes the right sections — hazards, controls, PPE, permits, method steps, emergency arrangements and sign-off — built for the actual task on the actual site.

Inside the document

What your RAMS actually contains

Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.

  • Hazards

    Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.

  • Controls

    Control measures mapped to each hazard with residual risk scoring after controls are applied.

  • PPE

    PPE requirements tied to the activity and site, ready to brief to the team.

  • Method steps

    Step-by-step method statement structured around how the work is actually sequenced on site.

  • Emergency arrangements

    First aid, rescue plan, emergency contacts and site-specific escalation routes.

  • COSHH prompts

    Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.

  • Sign-off

    Operative sign-off captured against the document — names, dates and acknowledgement of the brief.

  • Version history

    Every change tracked so you can show what was issued, when, and which version the team signed.

  • Approval status

    Clear approval state on every document — draft, in review, approved, issued — visible across the team.

  • Audit trail

    Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.

Before & after

From copied-and-pasted to site-specific

The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.

Before

Generic template copied from an old job.

  • • Hazards and controls that don't match this site or task.
  • • Method steps written for a different sequence of work.
  • • No emergency arrangements specific to the location.
  • • Client flags it as generic and asks for a rewrite.
After

Site-specific document structured around this job, site and task.

  • • Hazards captured from the actual scope you pasted in.
  • • Method steps sequenced for how the work runs on site.
  • • Emergency arrangements and rescue plan tied to the location.
  • • Approved internally, briefed to the team, signed off and stored.
How it works

From job details to signed-off document

A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.

  1. 1
    Paste job details

    Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.

  2. 2
    Riskora structures the document

    Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.

  3. 3
    Review, edit and download

    You stay in control of every section. Tweak anything, then download a clean PDF or share a link.

  4. 4
    Brief the team and record sign-off

    Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.

Built for site reality

Built by people who've written this paperwork on real sites

Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.

  • Built for contractors, consultants and teams
    Solo trades, principal contractors and in-house safety teams all run on the same workflow.
  • Supports multiple countries
    UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard.
  • Not just documents
    Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.
Start in seconds

Start your contractors RAMS now

Describe the job details, site message or scope of works. Riskora builds the rest around the task.

Preview first. No card needed. Download when you're happy.

FAQ

Questions for this exact situation

Only as a starting point — the RAMS must be specific to this site, scope and crew. Riskora lets you clone a previous document and change what's actually different, which is the sensible middle ground between starting from scratch and submitting an unedited copy.

Generic hazards with no site context, missing rescue / emergency arrangements, no named competent person, and controls that don't actually match the method. Riskora structures every section so those gaps don't appear.

Usually yes — most PCs want a separate RAMS per discipline so the site team knows which document to brief for each activity. Building them in Riskora is fast enough that this isn't a problem.

Riskora produces a structured, professional document that meets industry expectations. A competent person on your side should still review and sign it off before issue.

Yes — your first RAMS is free, no card. Paid plans add unlimited documents, projects and team sign-off.

Riskora helps structure a site-specific safety document. It does not replace competent review, site supervision, client requirements or legal duties. Always check the final document before issue.