Paste the scope and build a site-specific RAMS for scaffold erection — SG4:22 advance method, TG20:21 reference, tie pattern, loading, inspection regime and scaftag handover.
Frequently asked questions
- Does Riskora cover both erection and dismantling?
- Yes — the RAMS treats erection, alteration and dismantling as separate phases, each with its own hazards, controls and method.
- Where do I record the TG20:21 compliance sheet?
- Riskora adds a compliance/design reference field. Attach the eGuide sheet or SE-stamped drawing number — auditors look for this every time.
- Do I need to name the CISRS inspector?
- Yes — competence and supervision are part of the WAHR Reg 9 requirement. Riskora prompts for the CISRS Advanced inspector and the inspection schedule.
- What about cantilever or birdcage scaffolds?
- Select the scaffold type and Riskora swaps in the relevant hazards (e.g. counterweight, internal access, restricted egress) and references the bespoke design.