Build a UK RAMS for formwork and falsework — BS 5975 temp works, coordinator sign-off, striking sequence, edge protection and load-out controls. Free to start.
Frequently asked questions
- Does the RAMS reference BS 5975?
- Yes — BS 5975:2019 is referenced and the design category is called out, with TWC and TWS named on the document. Cat 3 designs prompt for an independent design check reference.
- How is the striking schedule handled?
- The striking schedule is written into the method with references to the concrete cube strength required before strike, and requires TWC permission to strike.
- Do you cover proprietary systems?
- Yes — PERI, Doka, Meva, RMD Kwikform and similar systems can be named in the RAMS with the supplier method statement referenced.
- What about wind loading at height?
- Wind stop thresholds are written into the method for large-panel and high-level formwork, referenced to the design wind speed.
- Is it free to start?
- Yes — your first RAMS is free, no card.