RAMS Missing a Rescue Plan? Add One in Minutes

Paste the rejection comments and Riskora rebuilds your RAMS with hazards, controls, method steps, emergency arrangements, sign-off, review notes and export-ready structure. Reviewer-grade structure, no blank templates. 100+ industries supported.

Preview first. No card needed. Download when you're happy.

  • Site-specific rebuild
  • Structured for review
  • Ready to re-issue

Structured around HSE-recognised RAMS format — review before use and adapt to your site.

  • UK · IE · US · CA · AU · NZ
  • RAMS · SWMS · JHA · JSA · COSHH · Task Analysis · Toolbox Talks
  • Site-specific — not a blank template
  • First document free · No card required
You're probably here because…
  • 'Rescue plan missing — please add before re-submission.'
  • Working at height task with no rescue method described.
  • No competent rescuer named, no equipment listed.
  • Suspension-trauma window not addressed.
What to add to the box
  • A client email asking for paperwork
  • A site manager's WhatsApp or text message
  • Scope of works or job description
  • Tender or PQQ notes for the package
  • A previous RAMS to update or improve
Inside the document

What Riskora rebuilds

Competent rescuer

Named on-site rescuer with the training and equipment to reach a suspended operative fast.

Rescue equipment

Rescue kit specified — descender, anchor, spare harness — held at the work face.

Rescue method

Numbered rescue steps: raise alarm, reach casualty, lower to safe surface, first aid, escalate.

Suspension-trauma window

Time window addressed with positioning and post-rescue medical response.

Emergency escalation

999 script, PC contact, first aider on site and A&E route filled in.

Briefing + drill evidence

Sign-off block for pre-start rescue brief and reference to the last rescue drill.

Example output

A site-ready RAMS, rebuilt

See how Riskora shapes your brief into a RAMS designed for competent review — every section structured, with everything editable before re-issue.

Start in seconds

Rebuild your RAMS now — done in minutes

Preview first. No card needed. Download when you're happy.

FAQ

Questions for this exact situation

For any working at height where a fall arrest system is in use, yes. The Work at Height Regulations 2005 require a rescue plan proportionate to the task — self-rescue is rarely sufficient on its own.

Named competent rescuer(s), rescue equipment held at the work face, the rescue method itself, suspension-trauma response and escalation to emergency services.

A first draft in under a minute, a ready-to-issue RAMS in 10–15 minutes. Competent-person review still required.

Riskora helps structure a site-specific safety document. It does not replace competent review, site supervision, client requirements or legal duties. Always check the final document before issue.