Build a Pre-Task Plan (PTP) for a US jobsite — hazards by step, controls, PPE, permits, emergency contacts and crew sign-on. OSHA-aligned, ready in minutes. Free to start.
Frequently asked questions
- Is a PTP the same as a JHA?
- A JHA is typically a deeper, phase-level hazard analysis. A PTP is a short, daily plan built off the JHA or AHA. Most US GCs require both — JHA for the phase, PTP for the day.
- Does this fit 29 CFR 1926?
- Yes. Controls map to 29 CFR 1926 Subpart C (general safety), Subpart E (PPE), Subpart K (electrical), Subpart M (fall protection), and the GC's site-specific safety plan.
- Is there a crew sign-on?
- Yes — every crew member on the task signs on before work starts.
- Is it free to start?
- Yes — first PTP is free, no card.