- What safety documents does a UK construction site need?
- At minimum: site-specific RAMS (risk assessment + method statement), toolbox talks for high-risk tasks, a construction phase plan on CDM projects, and permits for hot works, height, confined spaces and excavation where applicable.
- Are these documents CDM 2015 compliant?
- Yes — the structure aligns with what a UK principal contractor's CDM 2015 checklist expects.
- Do I need separate documents for each trade?
- Each contractor issues their own site-specific RAMS. The PC gathers them under the construction phase plan.
- How often should documents be reviewed?
- Before mobilisation, when the scope changes, after an incident, and at planned intervals through the project.