Frequently asked questions

What safety documents does a UK construction site need?
At minimum: site-specific RAMS (risk assessment + method statement), toolbox talks for high-risk tasks, a construction phase plan on CDM projects, and permits for hot works, height, confined spaces and excavation where applicable.
Are these documents CDM 2015 compliant?
Yes — the structure aligns with what a UK principal contractor's CDM 2015 checklist expects.
Do I need separate documents for each trade?
Each contractor issues their own site-specific RAMS. The PC gathers them under the construction phase plan.
How often should documents be reviewed?
Before mobilisation, when the scope changes, after an incident, and at planned intervals through the project.