Generate a structured risk assessment in under ten minutes. Pre-loaded hazards, intelligent suggestions, and instant download — no more blank templates.
UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Full version
Takes less than 5 minutes
No card required · 1 free PDF · Upgrade any time (completely free)
Sometimes you need a risk assessment urgently — a last-minute site access requirement, a client request before work starts tomorrow, or an unexpected task that needs documenting before your team can proceed. Spending hours writing from a blank template isn't an option. Understanding the complete guide to RAMS in the UK helps frame why proper documentation matters.
Riskora's wizard-based approach means you can generate a complete, structured risk assessment in minutes. Select your work type, confirm the suggested hazards, and download a professional document. Company Intelligence pre-fills details from your previous work, making repeat assessments even faster. Try the RAMS generator to see how quickly you can produce professional documentation.
Before you generate your document, these guides cover the knowledge that underpins every good RAMS, risk assessment, and method statement.
What Is a RAMS Document?
Understand the fundamentals of RAMS before choosing how to create them.
How to Write a RAMS Document
The structure every RAMS should follow — and what a good tool automates for you.
UK Legal Requirements
Ensure your safety documents meet the 'suitable and sufficient' standard required by law.
Who Needs a RAMS?
Determine whether you need a RAMS and understand the obligations behind the requirement.
Construction Safety Documents Explained
An overview of the key safety documents required on UK construction sites and how they relate to each other.
RAMS vs Risk Assessment — Key Differences
When you need a full RAMS versus a standalone risk assessment, and how the two documents work together.
Direct quotes from the named regulations, with plain-English explanations of what each one means in practice.
Regulation 3, Management of Health and Safety at Work Regulations 1999
“Every employer shall make a suitable and sufficient assessment of the risks to the health and safety of his employees to which they are exposed whilst they are at work.”
'Suitable and sufficient' is the legal standard a quick risk assessment must still meet. Speed is fine — corner-cutting on hazard identification, control specificity or competent review is not.
Read the source on legislation.gov.uk →Regulation 3(6), Management of Health and Safety at Work Regulations 1999
“Where the employer employs five or more employees, he shall record the significant findings of the assessment.”
Once you employ five or more people, the significant findings must be written down. A quick tool is still acceptable provided the output is a real record — not a verbal walk-through that nobody can produce on request.
Read the source on legislation.gov.uk →Why this matters — the most recent published figures from the Health and Safety Executive and ONS.
604,000 non-fatal injuries
Self-reported workplace injuries in 2023/24 — most occurring on jobs where a basic risk assessment either didn't exist or hadn't been tailored to the task. The case for a fast, structured tool is exactly this long tail of last-minute work.
Source: HSE — Workplace injury statistics 2023/24 →Median HSE FFI invoice ~£750
Fee-for-Intervention invoices for management failures including inadequate risk assessment, based on published HSE FFI data. A 10-minute structured assessment is cheap insurance against a 4-figure invoice and project delay.
Source: HSE — Fee for Intervention →Scenario. A plumbing crew on a refurb arrives Monday morning to find that a stop-tap behind a stud wall has failed overnight and the floor is flooded. The original RAMS covered first-fix plumbing only. The PC needs a risk assessment for the strip-out and dry-down before any of the original works can resume — and they need it within the hour.
Quick-tool flow. Operator opens Riskora, selects the 'Water damage / strip-out' starting point, confirms the suggested hazards (slips on wet floors, electrical contact with damaged sockets at low level, manual handling of saturated plasterboard, mould / biological exposure if the leak is more than 48 hours old), and accepts the pre-loaded controls (isolation of the local sub-circuit confirmed, non-slip mats, double-bagging of waste plasterboard, RPE specification, two-person lifts above 15kg of saturated material). Operator adds three site-specific notes (sub-circuit ID, nearest A&E, name of competent reviewer), downloads PDF, sends to the PC's SHEQ lead.
Elapsed time. 7 minutes from opening the tool to delivering a signed PDF — short enough that the crew is back on the tools the same morning, but long enough to capture genuinely site-specific controls rather than a copy-paste template.
1. Treating 'quick' as 'minimal'
Why it fails: A quick tool isn't a permit to skip hazard identification — it's a tool that does the structure for you so all the time goes into specificity. Reviewers can spot a minimal-content RA in 10 seconds.
Fix: Spend the time you saved on structure on naming the actual site, crew, plant and adjacent hazards. The output should look indistinguishable from a 60-minute assessment.
2. Skipping the residual rating because 'it's only a short job'
Why it fails: Short jobs are over-represented in serious incident statistics — precisely because the residual risk wasn't assessed. The matrix is not optional.
Fix: Always score pre- and post-control. If the residual sits in amber, document the additional measure or stop work.
3. Verbal sign-off only, with no named reviewer in the document
Why it fails: If something goes wrong, the assessment must demonstrate competent review by a named person on a named date. 'The supervisor approved it' is not a defensible audit trail.
Fix: Name the competent reviewer, capture the signature digitally, and lock the document version. Software handles this automatically; PDF documents usually don't.
Use a quick tool for: single-task additions to an existing RAMS, emergency / reactive work where the alternative is undocumented work, repeat tasks where 80% of the content is identical to a prior assessment, and small-scope jobs (under a day) with well-understood hazards.
Don't shortcut on: first-time tasks, work involving new plant or new materials, anything notifiable under CDM 2015, work involving asbestos / lead / silica / confined spaces / hot works, or any task where serious-harm hazards are present. These need a full RAMS with competent review at proper depth, not a 10-minute document.
The output is a real risk assessment, just produced faster — not a thinner one.
Will this take long?
Under 5 minutes. Select your trade, pick hazards, download.
Is it complicated?
No training needed. The guided builder walks you through every step.
Do I need experience?
If you know what work you're doing, you can use Riskora.
Is it free to try?
Yes. The Free plan needs no card — generate, review and download one free PDF. Upgrade any time for branding, DOCX, sign-off and higher limits.
Create your RAMS in under 5 minutes
No onboarding or setup needed — start generating documents instantly
Try Riskora FreeNo card required · 1 free PDF · Upgrade any time (completely free)
All documents generated by Riskora should be reviewed by a competent person before use on site. Riskora provides structured templates — professional judgement is always required.
Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.
Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.
Control measures mapped to each hazard with residual risk scoring after controls are applied.
PPE requirements tied to the activity and site, ready to brief to the team.
Step-by-step method statement structured around how the work is actually sequenced on site.
First aid, rescue plan, emergency contacts and site-specific escalation routes.
Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.
Operative sign-off captured against the document — names, dates and acknowledgement of the brief.
Every change tracked so you can show what was issued, when, and which version the team signed.
Clear approval state on every document — draft, in review, approved, issued — visible across the team.
Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.
The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.
Generic template copied from an old job.
Site-specific document structured around this job, site and task.
A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.
Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.
Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.
You stay in control of every section. Tweak anything, then download a clean PDF or share a link.
Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.
Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.
No training. No complex setup. Just select your trade and go.
Start Your RAMS Now — It's FreeNo card required · 1 free PDF · Upgrade for branding, DOCX, sign-off and audit trails (completely free)
Primary UK sources covering the legal and practical framework behind RAMS, risk assessments and method statements.
Generate a preview first. Sign up only when you want to save, edit or export.
Final RAMS must be reviewed and approved by a competent person before use.
Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.