A risk assessment is a systematic process of identifying hazards, evaluating the level of risk, and deciding on control measures to protect workers. In UK construction, risk assessments are a legal requirement under the Management of Health and Safety at Work Regulations 1999.
UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Full version
Takes less than 5 minutes
No card required · 1 free PDF · Upgrade any time (completely free)
A risk assessment is a legal requirement where employers identify workplace hazards, evaluate who might be harmed and how seriously, and record the control measures needed to reduce risk to an acceptable level. In UK construction, this must be done before work begins and reviewed regularly.
A risk assessment is the process of identifying hazards in a workplace, evaluating the likelihood and severity of harm they could cause, and determining appropriate control measures. In UK law, it's a duty under the Health and Safety at Work etc. Act 1974 and the Management of Health and Safety at Work Regulations 1999.
Many construction professionals treat risk assessments as paperwork to tick a box. Generic templates get copied between projects with minimal changes. Hazards specific to the actual site get missed. The result: documents that satisfy nobody — not the HSE, not the principal contractor, and certainly not the workers they're supposed to protect. Understanding the complete guide to RAMS in the UK helps frame why proper documentation matters.
The Health and Safety Executive states: 'A risk assessment is not about creating huge amounts of paperwork, but rather about identifying sensible measures to control the risks in your workplace.'
A good risk assessment doesn't have to be long or complex. It needs to be specific to the work being done, on the site where it's happening, with the people who'll actually be doing it. Riskora's guided builder helps you create structured risk assessments with pre-loaded hazard libraries — ensuring you cover the right risks without writing from scratch. You can also use our standalone risk assessment builder or method statement tool.
Before you generate your document, these guides cover the knowledge that underpins every good RAMS, risk assessment, and method statement.
What Is a RAMS Document?
The complete guide to RAMS — what they contain, who needs them, and why they matter.
How to Write a RAMS Document
Step-by-step guidance on structuring a professional RAMS document.
UK Legal Requirements
What UK law requires for risk assessments and safety documentation.
RAMS vs Risk Assessment
Clarify when you need a full RAMS versus a standalone risk assessment.
RAMS vs Risk Assessment — Key Differences
When you need a full RAMS versus a standalone risk assessment, and how the two documents work together.
Risk Assessment Legal Requirements (UK)
The legal framework behind risk assessments in the UK — what the law requires and what 'suitable and sufficient' means.
Yes. Under the Management of Health and Safety at Work Regulations 1999, all employers and self-employed persons must carry out risk assessments. If you employ five or more people, the significant findings must be recorded in writing.
The HSE's five steps are: 1) Identify the hazards, 2) Decide who might be harmed and how, 3) Evaluate the risks and decide on precautions, 4) Record your significant findings, 5) Review your assessment and update if necessary.
Under CDM 2015, the principal contractor is responsible for managing risk on site. However, every employer and self-employed worker has a duty to assess risks for their own activities. Subcontractors must produce risk assessments for their specific work.
Will this take long?
Under 5 minutes. Select your trade, pick hazards, download.
Is it complicated?
No training needed. The guided builder walks you through every step.
Do I need experience?
If you know what work you're doing, you can use Riskora.
Is it free to try?
Yes. The Free plan needs no card — generate, review and download one free PDF. Upgrade any time for branding, DOCX, sign-off and higher limits.
Create your RAMS in under 5 minutes
No onboarding or setup needed — start generating documents instantly
Try Riskora FreeNo card required · 1 free PDF · Upgrade any time (completely free)
All documents generated by Riskora should be reviewed by a competent person before use on site. Riskora provides structured templates — professional judgement is always required.
Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.
Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.
Control measures mapped to each hazard with residual risk scoring after controls are applied.
PPE requirements tied to the activity and site, ready to brief to the team.
Step-by-step method statement structured around how the work is actually sequenced on site.
First aid, rescue plan, emergency contacts and site-specific escalation routes.
Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.
Operative sign-off captured against the document — names, dates and acknowledgement of the brief.
Every change tracked so you can show what was issued, when, and which version the team signed.
Clear approval state on every document — draft, in review, approved, issued — visible across the team.
Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.
The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.
Generic template copied from an old job.
Site-specific document structured around this job, site and task.
A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.
Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.
Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.
You stay in control of every section. Tweak anything, then download a clean PDF or share a link.
Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.
Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.
No training. No complex setup. Just select your trade and go.
Start Your RAMS Now — It's FreeNo card required · 1 free PDF · Upgrade for branding, DOCX, sign-off and audit trails (completely free)
Primary UK sources covering the legal and practical framework behind RAMS, risk assessments and method statements.
Generate a preview first. Sign up only when you want to save, edit or export.
Final RAMS must be reviewed and approved by a competent person before use.
Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.