Build RAMS for utilities work

Utilities RAMS get rejected when isolation, LOTO, live-working controls and buried-services strike are handled generically. Riskora builds a RAMS matching your utility, referencing HSG47 / ENA / GS6 / WIRSAE as relevant. 100+ industries supported.

UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Example UK (RAMS) front cover produced by Riskora
Try the new compact mode. Same document, just more compact

Full version

Preview first. No card needed. Download when you're happy.

  • Free to start
  • No signup to preview
  • Done in ~60 seconds

Riskora structures your brief into a site-specific RAMS for utilities work — hazards, controls, PPE, permits, method steps and emergency arrangements. Not a generic template.

  • UK · IE · US · CA · AU · NZ
  • RAMS · SWMS · JHA · JSA · COSHH · Task Analysis · Toolbox Talks
  • Site-specific — not a blank template
  • First document free · No card required
You're probably here because…
  • DNO / gas transporter wants a RAMS before any works.
  • SAP / AP required — need to name them in the RAMS.
  • Buried services in the dig — no CAT scan referenced last time.
  • Live-working scope — you need explicit dead / live status called out.
What to paste into the box
  • Scope of works for the utilities work
  • A client email, PQQ note or RFI
  • A site manager's WhatsApp or text message
  • Pre-start meeting notes or programme
  • A previous RAMS to update or improve
  • Drawings, permits or site rules to align with
Inside the document

Inside a Riskora RAMS for utilities work

Every section is built around the actual task — not boilerplate. These are the task-specific items Riskora drops in by default for utilities work, ready for you to refine and sign off.

Task-specific hazards

Live electrical contact / arc flash · Gas escape / ignition · Water main strike / flooding · Buried services (multi-utility) strike · Confined space in chambers / substations · Traffic management in the highway · Manual handling of jointing kits, cables, pipes

Controls matched to each hazard

Isolation + prove dead + LOTO (HSG85 / GS6 / ENA S03) · SAP / AP authorised for the works · CAT & Genny + record drawings before dig · Arc-rated PPE + Class 0/1 gloves as appropriate · 4-gas monitor + rescue for chambers · Chapter 8 TM + NRSWA notice · Purge + gas-free certificate for gas work

Likely PPE

Arc-rated coverall + hood · Class 0/1 insulating gloves · Hard hat · Class 2 hi-vis · Safety boots (S3) · 4-gas monitor + escape set

Permits & hold points

Electrical / gas / water isolation permit · SAP / AP authorisation · NRSWA S50/S58 notice · Excavation + confined-space permits

Emergency arrangements

Nearest A&E + burns unit route · Escalation to DNO / GT emergency line · Fire extinguisher on site · Named first aider on shift

Method steps & sign-off

Numbered method sequence with responsible person, briefing register, and competent reviewer sign-off before work starts.

Example output

A site-ready RAMS for utilities work

See how Riskora structures hazards, controls, PPE, permits and method steps into a single document specifically for utilities work — edit anything before you issue it.

Not a blank template

Not a generic Utilities Work template

Most "RAMS for utilities work" templates online are blank docs you still have to fill in, or AI prose with no structure. Riskora reads your brief and writes the right sections — hazards, controls, PPE, permits, method steps, emergency arrangements and sign-off — built for the actual task on the actual site.

Inside the document

What your RAMS actually contains

Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.

  • Hazards

    Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.

  • Controls

    Control measures mapped to each hazard with residual risk scoring after controls are applied.

  • PPE

    PPE requirements tied to the activity and site, ready to brief to the team.

  • Method steps

    Step-by-step method statement structured around how the work is actually sequenced on site.

  • Emergency arrangements

    First aid, rescue plan, emergency contacts and site-specific escalation routes.

  • COSHH prompts

    Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.

  • Sign-off

    Operative sign-off captured against the document — names, dates and acknowledgement of the brief.

  • Version history

    Every change tracked so you can show what was issued, when, and which version the team signed.

  • Approval status

    Clear approval state on every document — draft, in review, approved, issued — visible across the team.

  • Audit trail

    Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.

Before & after

From copied-and-pasted to site-specific

The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.

Before

Generic template copied from an old job.

  • • Hazards and controls that don't match this site or task.
  • • Method steps written for a different sequence of work.
  • • No emergency arrangements specific to the location.
  • • Client flags it as generic and asks for a rewrite.
After

Site-specific document structured around this job, site and task.

  • • Hazards captured from the actual scope you pasted in.
  • • Method steps sequenced for how the work runs on site.
  • • Emergency arrangements and rescue plan tied to the location.
  • • Approved internally, briefed to the team, signed off and stored.
How it works

From job details to signed-off document

A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.

  1. 1
    Paste job details

    Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.

  2. 2
    Riskora structures the document

    Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.

  3. 3
    Review, edit and download

    You stay in control of every section. Tweak anything, then download a clean PDF or share a link.

  4. 4
    Brief the team and record sign-off

    Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.

Built for site reality

Built by people who've written this paperwork on real sites

Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.

  • Built for contractors, consultants and teams
    Solo trades, principal contractors and in-house safety teams all run on the same workflow.
  • Supports multiple countries
    UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard.
  • Not just documents
    Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.
Start in seconds

Start your utilities work RAMS now

Describe the job details, site message or scope of works. Riskora builds the rest around the task.

Preview first. No card needed. Download when you're happy.

FAQ

Questions for this exact situation

Yes — Senior Authorised Person / Authorised Person is a required field for electrical / gas work and gets printed on the RAMS with authorisation reference.

Service search, CAT & Genny scan, hand-dig 500mm around known services and record-drawing references are all written into the excavation method.

Live-working is only permitted where dead-working is impracticable and the risk is justified. The RAMS forces this justification and requires the arc-rated PPE and safe-distance controls to be stated.

Yes — GS6, purging, gas-free certification, ignition control and emergency escalation to the gas transporter are included when gas is on the brief.

Yes — your first RAMS is free, no card.

Riskora helps structure a site-specific safety document. It does not replace competent review, site supervision, client requirements or legal duties. Always check the final document before issue.