Build a site-specific RAMS for highways works — Chapter 8 traffic management, NRSWA compliance, live carriageway controls, plant movements and reinstatement.
Frequently asked questions
- Does the RAMS include a Chapter 8 layout?
- The RAMS references your Chapter 8 layout and covers the operational controls that go with it — signing, coning, lookout, night lighting. The drawn TM plan is attached separately as most overseeing bodies require signed layouts.
- Is NRSWA covered?
- Yes — S50, S58 and S74 notice references are prompted based on the work type, and reinstatement to SROH spec is written into the method.
- What about night works?
- Class 3 hi-vis, lighting levels, fatigue management and additional pedestrian controls are included when you flag the works as nights.
- Do you cover HAUC and NHSS?
- The document references HAUC / NHSS accreditation and the sector-specific competency requirements for the operatives named on the RAMS.
- Is it free to start?
- Yes — your first RAMS is free, no card.