The 6 main types of risk assessment used in UK construction. Generic, specific, dynamic, COSHH, fire, and manual handling — when to use each.
Frequently asked questions
- Do I need all types for every project?
- No. Most construction projects need a site-specific risk assessment (or RAMS). You'll need additional types — COSHH, fire, manual handling — only when those specific hazards are present in your work.
- Can Riskora create different types?
- Riskora generates structured risk assessments covering construction hazards including substance exposure, manual handling, and working at height. The guided builder adapts content based on your selected work type.