Build RAMS for confined space entry

Confined space RAMS must show a safe system of work, atmospheric testing regime and — critically — a rescue plan that doesn't rely on the fire brigade. Riskora structures all three around the actual space. 100+ industries supported.

Preview first. No card needed. Download when you're happy.

  • Free to start
  • No signup to preview
  • Done in ~60 seconds

Riskora structures your brief into a site-specific RAMS for confined space entry — hazards, controls, PPE, permits, method steps and emergency arrangements. Not a generic template.

  • UK · IE · US · CA · AU · NZ
  • RAMS · SWMS · JHA · JSA · COSHH · Task Analysis · Toolbox Talks
  • Site-specific — not a blank template
  • First document free · No card required
You're probably here because…
  • Client requires confined space entry RAMS + permit pack before work.
  • Operatives need to be trained / certified — RAMS needs to record that.
  • Rescue team has to be on site — written rescue plan required.
  • Sewer / tank / chamber work and atmospheric risk uncertain.
What to paste into the box
  • Scope of works for the confined space entry
  • A client email, PQQ note or RFI
  • A site manager's WhatsApp or text message
  • Pre-start meeting notes or programme
  • A previous RAMS to update or improve
  • Drawings, permits or site rules to align with
Inside the document

Inside a Riskora RAMS for confined space entry

Every section is built around the actual task — not boilerplate. These are the task-specific items Riskora drops in by default for confined space entry, ready for you to refine and sign off.

Task-specific hazards

Oxygen deficiency or enrichment · Toxic gases — H2S, CO, methane, solvent vapour · Flammable atmosphere — explosion risk · Engulfment by liquid, gas or free-flowing solid · Drowning from upstream flow / rainfall · Heat stress / hypothermia in extreme temperatures · Casualty trapped — collapsed or unconscious

Controls matched to each hazard

Permit-to-work issued by competent authoriser (Confined Spaces Regs 1997) · Pre-entry and continuous 4-gas atmospheric monitoring (O2, H2S, CO, LEL) · Forced ventilation to maintain breathable atmosphere · Upstream isolation, flow diversion, lock-off · Top-man / sentry at entrance with comms and entrant log · Trained rescue team on site with tripod, winch and BA · Communication system between entrant and top-man (radio / line)

Likely PPE

Full body harness with recovery point · Escape set or BA depending on assessment · Personal gas monitor · Intrinsically-safe torch and radio · Coveralls + boots + gloves · Hard hat with chin strap

Permits & hold points

Confined space entry permit (mandatory) · Isolation / lock-out permit for upstream flow · Hot work permit if heat used inside the space · Electrical permit if energising equipment inside

Emergency arrangements

Written rescue plan — NOT calling 999 · Trained rescue team on site for the duration of entry · Tripod, winch, full body harness and recovery line set up before entry · BA / escape sets serviced and worn · Casualty extraction route to surface and onward to A&E planned

Method steps & sign-off

Numbered method sequence with responsible person, briefing register, and competent reviewer sign-off before work starts.

Example output

A site-ready RAMS for confined space entry

See how Riskora structures hazards, controls, PPE, permits and method steps into a single document specifically for confined space entry — edit anything before you issue it.

Not a blank template

Not a generic Confined Space Entry template

Most "RAMS for confined space entry" templates online are blank docs you still have to fill in, or AI prose with no structure. Riskora reads your brief and writes the right sections — hazards, controls, PPE, permits, method steps, emergency arrangements and sign-off — built for the actual task on the actual site.

Inside the document

What your RAMS actually contains

Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.

  • Hazards

    Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.

  • Controls

    Control measures mapped to each hazard with residual risk scoring after controls are applied.

  • PPE

    PPE requirements tied to the activity and site, ready to brief to the team.

  • Method steps

    Step-by-step method statement structured around how the work is actually sequenced on site.

  • Emergency arrangements

    First aid, rescue plan, emergency contacts and site-specific escalation routes.

  • COSHH prompts

    Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.

  • Sign-off

    Operative sign-off captured against the document — names, dates and acknowledgement of the brief.

  • Version history

    Every change tracked so you can show what was issued, when, and which version the team signed.

  • Approval status

    Clear approval state on every document — draft, in review, approved, issued — visible across the team.

  • Audit trail

    Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.

Before & after

From copied-and-pasted to site-specific

The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.

Before

Generic template copied from an old job.

  • • Hazards and controls that don't match this site or task.
  • • Method steps written for a different sequence of work.
  • • No emergency arrangements specific to the location.
  • • Client flags it as generic and asks for a rewrite.
After

Site-specific document structured around this job, site and task.

  • • Hazards captured from the actual scope you pasted in.
  • • Method steps sequenced for how the work runs on site.
  • • Emergency arrangements and rescue plan tied to the location.
  • • Approved internally, briefed to the team, signed off and stored.
How it works

From job details to signed-off document

A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.

  1. 1
    Paste job details

    Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.

  2. 2
    Riskora structures the document

    Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.

  3. 3
    Review, edit and download

    You stay in control of every section. Tweak anything, then download a clean PDF or share a link.

  4. 4
    Brief the team and record sign-off

    Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.

Built for site reality

Built by people who've written this paperwork on real sites

Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.

  • Built for contractors, consultants and teams
    Solo trades, principal contractors and in-house safety teams all run on the same workflow.
  • Supports multiple countries
    UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard.
  • Not just documents
    Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.
Start in seconds

Start your confined space entry RAMS now

Describe the job details, site message or scope of works. Riskora builds the rest around the task.

Preview first. No card needed. Download when you're happy.

FAQ

Questions for this exact situation

Yes — the regulations and L101 ACOP are cited, and the structure follows: assess > avoid entry > safe system + emergency arrangements.

Yes — Reg 5 of the Confined Spaces Regulations 1997 requires suitable and sufficient emergency arrangements before any entry. Riskora forces a rescue plan section.

Pre-entry and continuous 4-gas (O2, H2S, CO, LEL) with calibration dates recorded and trigger levels noted.

Yes — Riskora records the permit number, authoriser and revalidation interval against the RAMS.

Riskora helps structure a site-specific safety document. It does not replace competent review, site supervision, client requirements or legal duties. Always check the final document before issue.