By the Riskora Editorial Team · Reviewed against our editorial standards · Last reviewed
Tiling work generates respirable crystalline silica from wet and dry cutting, exposes operatives to adhesive and grout sensitisers, and creates serious manual-handling and slip hazards. Riskora generates a structured tiling RAMS that addresses these risks specifically — not as generic construction line items.
UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Full version
Takes less than 5 minutes
No card required · 1 free PDF · Upgrade any time (completely free)
A tiling RAMS must cover silica dust control during cutting (water suppression or LEV), COSHH controls for adhesives and grouts (skin sensitisers, isocyanates in some products), manual handling of tile boxes and large-format tiles, kneeling and stooped working postures, slip hazards from wet adhesives and floor preparation, electrical safety for wet cutting, and disposal of cementitious waste. It should reference HSG258 for dust and the COSHH Regulations 2002 for chemical exposures.
Tiling looks low-risk compared to working at height or excavation, but it accounts for a steady stream of long-latency health claims in the UK construction sector. Dry-cutting porcelain or natural stone with an angle grinder generates respirable silica well above the workplace exposure limit. Cement-based grouts and adhesives cause irritant and allergic dermatitis. Sustained kneeling damages knees and lower back. And wet floors during preparation and grouting are a leading cause of same-level slip injuries. A generic construction RAMS will not address any of these in the detail a principal contractor expects. UK risk-assessment law requires controls to be specific to the actual hazards present.
HSE's HSG258 makes clear that dry-cutting tiles without water suppression or LEV will exceed the silica workplace exposure limit within minutes. Tiling RAMS must specify the cutting method and the dust control.
Riskora's tiling preset loads silica-dust controls (wet cutting, on-tool extraction, FFP3 RPE), COSHH lines for cement-based and epoxy adhesives, manual-handling controls for large-format tiles, kneeling-pad and rotation requirements, and slip-management procedures for wet phases. You confirm the site specifics — adhesive product, cutting method, area type — and download a document a competent person would recognise as fit for purpose. For the standalone risk-assessment portion you can also use our risk assessment builder.
Before you generate your document, these guides cover the knowledge that underpins every good RAMS, risk assessment, and method statement.
What Is a RAMS Document?
Understand the two components of a RAMS and why they're required before tiling work begins on site.
How to Write a RAMS Document
Step-by-step guide to structuring your RAMS from project details through to sign-off.
UK Legal Requirements for Risk Assessments
What MHSWR 1999, COSHH 2002 and CDM 2015 require, and what 'suitable and sufficient' means in practice.
Construction Safety Documents Explained
How RAMS sit alongside CPP, COSHH assessments, and other documents on a UK site.
Will this take long?
Under 5 minutes. Select your trade, pick hazards, download.
Is it complicated?
No training needed. The guided builder walks you through every step.
Do I need experience?
If you know what work you're doing, you can use Riskora.
Is it free to try?
Yes. The Free plan needs no card — generate, review and download one free PDF. Upgrade any time for branding, DOCX, sign-off and higher limits.
Create your RAMS in under 5 minutes
No onboarding or setup needed — start generating documents instantly
Try Riskora FreeNo card required · 1 free PDF · Upgrade any time (completely free)
All documents generated by Riskora should be reviewed by a competent person before use on site. Riskora provides structured templates — professional judgement is always required.
Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.
Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.
Control measures mapped to each hazard with residual risk scoring after controls are applied.
PPE requirements tied to the activity and site, ready to brief to the team.
Step-by-step method statement structured around how the work is actually sequenced on site.
First aid, rescue plan, emergency contacts and site-specific escalation routes.
Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.
Operative sign-off captured against the document — names, dates and acknowledgement of the brief.
Every change tracked so you can show what was issued, when, and which version the team signed.
Clear approval state on every document — draft, in review, approved, issued — visible across the team.
Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.
The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.
Generic template copied from an old job.
Site-specific document structured around this job, site and task.
A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.
Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.
Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.
You stay in control of every section. Tweak anything, then download a clean PDF or share a link.
Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.
Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.
No training. No complex setup. Just select your trade and go.
Start Your RAMS Now — It's FreeNo card required · 1 free PDF · Upgrade for branding, DOCX, sign-off and audit trails (completely free)
Primary UK sources covering the legal and practical framework behind RAMS, risk assessments and method statements.
Generate a preview first. Sign up only when you want to save, edit or export.
Final RAMS must be reviewed and approved by a competent person before use.
Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.