Upload your existing JHA — get an OSHA-ready one back
Got a generic JHA someone else wrote? Received a JSA the GC bounced back? Drop the PDF or Word file in. Riskora reads the whole document, keeps your company, project and scope, and rebuilds it as a structured JHA — sequence of basic job steps, potential hazards, recommended controls and required PPE — in the OSHA 3071 format reviewers expect. 100+ industries supported.
US (JHA) example document — Rooftop HVAC Unit Changeout — 1400 Larimer Commerce Center, Denver. Client: Larimer Commerce Center Property Management. Site: 1400 Larimer Commerce Center, Denver, CO 80202. Scope: Removal and replacement of two 15-ton packaged rooftop units on an occupied four-story commercial building: refrigerant recovery, electrical lockout, 90-ton crane lift from a permitted lane closure, curb adaptation, duct transition welding under hot work permit, gas reconnection and commissioning. Works programmed over 5 working days with a crew of 5.

Full version
Drop in a PDF, Word doc or old JHA
Riskora reads it end-to-end, keeps what's yours (company, site, scope) and rebuilds a structured, audit-ready JHA around it.
- PDF · Word · TXT
- Company + scope kept
- Free to start
- No signup to preview
- Done in ~60 seconds
Riskora reads the file the way an experienced safety manager would — extracts the real task and site context, discards the boilerplate, and rebuilds the sections a general contractor or CSHO expects to see.
- UK · IE · US · CA · AU · NZ
- RAMS · SWMS · JHA · JSA · COSHH · Task Analysis · Toolbox Talks
- Site-specific — not a blank template
- First document free · No card required
- You inherited a generic JHA template that doesn't match the actual scope.
- The GC or owner rejected the JSA and asked for a real one.
- The document is missing steps, hazards or the required PPE column.
- You need the OSHA 3071 structure without rewriting from scratch.
What Riskora extracts from the file you upload
The uploaded document usually has the raw material — company, project, scope, some hazards. Riskora keeps what's yours and rebuilds the rest into a structured JHA.
Company + crew details
Company name, address, competent person and crew — kept verbatim from the uploaded file.
Project + site context
Project, address, GC, phase and access window pulled from the document.
Sequence of basic job steps
The actual task — broken into numbered steps the way OSHA 3071 asks.
Potential hazards per step
Fall, struck-by, caught-in-between, electrical, silica, heat, confined space — mapped to each step.
Recommended controls
Hierarchy of controls: elimination, substitution, engineering, administrative, PPE — matched to each hazard.
Required PPE
Hard hat, hi-vis Class II/III, safety glasses, gloves, harness, respirator — specific to the extracted task.
Tools + equipment
Ladders, MEWPs, powered tools — extracted and flagged for pre-use inspection.
Emergency + sign-off
Nearest hospital, MOB assembly, competent person and crew sign-off block ready for signatures.
Gap prompts
Riskora flags anything the uploaded file was missing — SDS, permit-required confined space, LOTO — before issue.
From uploaded PDF to an OSHA-ready JHA
A generic JHA template becomes a job-specific document with steps, hazards, controls and required PPE — ready for the daily briefing and the GC's file.
Not a paragraph rewrite. Not a filename change.
Generic AI tools paraphrase your file into long prose. Riskora reads the uploaded document, extracts the underlying task and site context, and rebuilds the sections OSHA 29 CFR 1926 and the OSHA 3071 JHA format expect — steps, hazards, controls, PPE, sign-off — with your company details kept intact.
What your JHA actually contains
Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.
Hazards
Task-specific hazards for the job, captured row by row — not a generic list pulled from an old JHA.
Controls
Control measures mapped to each hazard with residual risk scoring after controls are applied.
PPE
PPE requirements tied to the activity and site, ready to brief to the team.
Method steps
Step-by-step method statement structured around how the work is actually sequenced on site.
Emergency arrangements
First aid, rescue plan, emergency contacts and site-specific escalation routes.
COSHH prompts
Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.
Sign-off
Operative sign-off captured against the document — names, dates and acknowledgement of the brief.
Version history
Every change tracked so you can show what was issued, when, and which version the team signed.
Approval status
Clear approval state on every document — draft, in review, approved, issued — visible across the team.
Audit trail
Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.
From copied-and-pasted to site-specific
The reason JHA get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.
Generic template copied from an old job.
- • Hazards and controls that don't match this site or task.
- • Method steps written for a different sequence of work.
- • No emergency arrangements specific to the location.
- • Client flags it as generic and asks for a rewrite.
Site-specific document structured around this job, site and task.
- • Hazards captured from the actual scope you pasted in.
- • Method steps sequenced for how the work runs on site.
- • Emergency arrangements and rescue plan tied to the location.
- • Approved internally, briefed to the team, signed off and stored.
From job details to signed-off document
A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.
- 1Paste job details
Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.
- 2Riskora structures the document
Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.
- 3Review, edit and download
You stay in control of every section. Tweak anything, then download a clean PDF or share a link.
- 4Brief the team and record sign-off
Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.
Built by people who've written this paperwork on real sites
Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.
- Built for contractors, consultants and teams
Solo trades, principal contractors and in-house safety teams all run on the same workflow. - Supports multiple countries
UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard. - Not just documents
Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.
Upload the file — get a proper JHA back
Drop in the PDF or Word file. Riskora rebuilds it as a structured JHA with steps, hazards, controls and sign-off.
Drop in a PDF, Word doc or old JHA
Riskora reads it end-to-end, keeps what's yours (company, site, scope) and rebuilds a structured, audit-ready JHA around it.
- PDF · Word · TXT
- Company + scope kept
Questions for this exact situation
Riskora helps structure a site-specific safety document. It does not replace competent review, site supervision, client requirements or legal duties. Always check the final document before issue.