Who Signs Off a RAMS Document?
A RAMS document passes through several hands before work begins. Understanding who is responsible at each stage — preparation, review, approval, and briefing — prevents delays and ensures accountability.
The sign-off chain
1. Prepared by: The competent person
The person who writes the RAMS must be competent to do so. This means having sufficient training, experience, and knowledge of the work and its hazards. They don't need formal qualifications, but they must genuinely understand the task, the risks, and the controls required.
Typically, this is the site supervisor, contracts manager, or a health and safety professional within the contracting company.
2. Reviewed by: Internal quality check
Best practice is for someone other than the author to review the RAMS before submission. This catches errors, omissions, and assumptions that the author may be too close to the work to spot. The reviewer is usually a senior manager or dedicated QHSE (Quality, Health, Safety, and Environment) person.
3. Approved by: The principal contractor
On most UK construction sites, the principal contractor reviews and approves subcontractor RAMS before work begins. This is part of their CDM 2015 duty to plan, manage, and monitor the construction phase. Approval doesn't transfer responsibility — the subcontractor remains responsible for the accuracy and implementation of their RAMS.
4. Briefed to: All workers
Before work starts, the RAMS must be briefed to every person who will carry out or be affected by the work. This is typically done through a toolbox talk. Workers should sign to confirm they've received, understood, and will comply with the RAMS.
Common misunderstandings
- "The principal contractor writes our RAMS" — No. Each contractor is responsible for their own RAMS. The PC reviews and approves them.
- "Once signed off, it doesn't change" — Wrong. RAMS must be reviewed if conditions change, and re-briefed if updated.
- "Only the safety officer can sign it" — Any competent person can prepare RAMS. It doesn't have to be a safety professional.
- "Workers signing means they've read it" — Signing should follow a genuine briefing, not just a signature collection exercise.
For a complete walkthrough of RAMS structure and content, see how to write a RAMS document. Understanding what a RAMS document is provides the foundation, and our construction safety documents guide shows how RAMS fit within the wider documentation system.
A RAMS generator helps ensure the document is structured professionally before it reaches the review and approval stages, reducing rejection rates and rework.
Create your RAMS instantly with Riskora →
Create your who signs off RAMS free — preview before sign-up
Generate a preview first. Sign up only when you want to save, edit or export.
Final RAMS must be reviewed and approved by a competent person before use.