Site clearance is often the first phase of a construction project — and one of the most unpredictable. Unknown ground conditions, contaminated materials, hidden services, and unstable structures all need documenting before work begins. Riskora generates structured RAMS for site clearance with relevant hazards built in.

Under 5 minutesNo training neededPDF download

UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Example UK (RAMS) front cover produced by Riskora
Try the new compact mode. Same document, just more compact

Full version

Start Your RAMS Now — It's Free

Takes less than 5 minutes

No card required · 1 free PDF · Upgrade any time (completely free)

Site Clearance Uncovers Risks That Weren't in the Plan

Site clearance work regularly exposes hazards that were not identified during the initial survey — buried asbestos, uncharted services, contaminated soil, unstable retaining walls, and unexpected voids. Workers are often the first people on site and face conditions that have not been assessed. Without a thorough RAMS covering the range of potential hazards, teams are working blind. Principal contractors expect site clearance RAMS to address contamination, services, structural stability, and waste segregation before the first machine arrives. Many contractors aren't sure what a RAMS document actually requires, which leads to submissions being rejected.

CDM 2015 requires that pre-construction information is gathered and shared before work begins. For site clearance, this includes information about existing structures, contamination, services, and any other hazards that may affect the safety of workers on site.

How Riskora Helps

Riskora generates site clearance RAMS covering vegetation removal, structure demolition, waste segregation, contaminated land procedures, and underground service avoidance. The system loads hazards specific to brownfield sites, greenfield preparation, and mixed-use clearance projects. If you're new to RAMS, our step-by-step guide to writing a RAMS explains the fundamentals before you start generating.

Who it's for

  • Demolition contractors clearing brownfield sites for redevelopment
  • Groundworks firms preparing greenfield sites for housing developments
  • Environmental remediation teams clearing contaminated land
  • Developers managing site clearance before principal contractor appointment
  • Landscaping companies clearing overgrown or derelict sites

Key Risks and Considerations

  • Asbestos-containing materials in existing structures or buried waste
  • Contaminated soil — hydrocarbons, heavy metals, or industrial chemicals
  • Uncharted underground services — electricity, gas, water, telecoms
  • Unstable structures — walls, basements, and retaining structures
  • Sharps, needles, and hazardous waste on neglected or derelict sites
  • Plant operations near site boundaries and public areas
  • Dust generation from demolition and earth-moving activities
  • Ecological hazards — protected species, nesting birds, Japanese knotweed

What UK Law Actually Says

Direct quotes from the named regulations, with plain-English explanations of what each one means in practice.

Regulation 4, Control of Asbestos Regulations 2012

Every employer must take suitable and sufficient steps to identify the type, location and condition of any asbestos-containing materials in any non-domestic premises before any work liable to expose them to ACMs is carried out.

CAR 2012 Reg 4 is why every site clearance on a structure built before 2000 needs a documented Refurbishment & Demolition (R&D) Survey. The RAMS must reference the survey report number, surveyor (UKAS-accredited), and the management of any positive findings.

Read the source on legislation.gov.uk →

Regulation 4, CDM 2015 — Client duties

A client must make suitable arrangements for managing a project, including allocating sufficient time and resources, and providing pre-construction information to designers and contractors.

CDM 2015 Reg 4 puts the pre-construction information (PCI) duty on the client. Site-clearance contractors must demand the PCI pack — asbestos survey, contaminated-land report, services drawings — and reference it explicitly in the RAMS, otherwise the duty defaults back to the contractor.

Read the source on legislation.gov.uk →

Regulation 22, Construction (Design and Management) Regulations 2015

Where an excavation is liable to fall or dislodge material, suitable and sufficient steps shall be taken to prevent any person from being buried or trapped, including by underground services.

Site clearance often involves grubbing-up foundations and exposing buried services. Reg 22 requires the RAMS to document service detection (CAT & Genny + trial holes) before any mechanical excavation — the same standard as utility excavation.

Read the source on legislation.gov.uk →

The Numbers Behind the Risk

Why this matters — the most recent published figures from the Health and Safety Executive and ONS.

5,000+ asbestos deaths per year

HSE confirms around 5,000 UK deaths per year from past asbestos exposure (mesothelioma, asbestos-related lung cancer) — many traced to construction and demolition workers who disturbed ACMs decades earlier without a survey.

Source: HSE — Asbestos-related disease statistics

13 demolition deaths per year

HSE construction sector reports show demolition and site clearance accounts for an outsized share of fatalities relative to hours worked — typically 10–15 deaths per year, with structural collapse and falls as the leading causes.

Source: HSE — Construction industry statistics

Common Mistakes (and How to Avoid Them)

1. No R&D survey before any mechanical works

Why it fails: Even minor mechanical disturbance of a pre-2000 structure (sheds, garages, hardstanding, painted soffits) can release asbestos fibres. CAR 2012 Reg 4 makes the R&D survey a precondition, not a desirable.

Fix: Reference the R&D survey report number on the RAMS front sheet, list every ACM finding with location, and specify the licensed contractor for any removal before clearance starts.

2. Treating contaminated land as 'discover and react'

Why it fails: On brownfield sites with industrial history, the RAMS must assume contamination until a Phase 2 ground investigation proves otherwise. Workers exposed to lead, hydrocarbons, or heavy metals through inadequate PPE drive enforcement action.

Fix: Reference the Phase 1 desk study and Phase 2 GI report; specify the unexpected-find procedure (stop work, set zone, sample, dispose under EWC code) before machine clearance.

3. Ecology not assessed before vegetation strip

Why it fails: Clearing nesting birds (Wildlife & Countryside Act 1981), bat roosts (Habitats Regulations 2017), or Japanese knotweed (Environmental Protection Act 1990) without survey is a criminal offence — and triggers project-stop notices.

Fix: Reference the ecology walkover (PEA) report and any protected-species licence numbers. Specify the seasonal window for vegetation strip (typically outside Mar–Aug for nesting birds).

Pre-Clearance Survey Stack — UK Quick Reference

Before any plant arrives on site, the RAMS must reference the complete pre-clearance survey pack. Missing one survey is the most common reason site-clearance RAMS are rejected by principal contractors and the most common cause of HSE notices once work starts.

SurveyTriggerRegulationCompetent person
Refurbishment & Demolition (R&D) asbestos surveyAny structure built pre-2000CAR 2012 Reg 4UKAS-accredited surveyor (P402 / BOHS)
Phase 1 / Phase 2 ground investigationIndustrial / brownfield historyEnvironmental Protection Act 1990 Part IIAChartered geo-environmental engineer
Utility drawing pack + CAT scanAny excavation or grubbingCDM 2015 Reg 22; HSG47PAS 128 utility surveyor
Preliminary Ecological Appraisal (PEA)Vegetated or derelict siteWildlife & Countryside Act 1981; Habitats Regs 2017CIEEM-registered ecologist
Structural appraisalDemolition / soft-strip of existing structureBS 6187:2011; CDM 2015 Reg 19Chartered structural engineer

Sources: CAR 2012; CDM 2015; BS 6187:2011 (Code of practice for full and partial demolition); HSE HSG47; CIEEM Guidelines for Preliminary Ecological Appraisal. Original synthesis — confirm scope with the project CDM Principal Designer.

Key Features

  • Site clearance hazard presets for brownfield and greenfield sites
  • Contaminated land risk sections
  • Asbestos survey integration prompts
  • Waste segregation and disposal templates
  • Underground service avoidance procedures
  • Download to PDF

Example Structure (UK Standard)

  1. Project Details and Site Clearance Scope
  2. Pre-Clearance Survey Findings
  3. Risk Assessment — Contamination, Services, Structures, Ecology
  4. Asbestos Management and Refurbishment/Demolition Survey
  5. Underground Service Identification and Avoidance
  6. Method Statement — Vegetation, Structures, Hardstanding, Soil
  7. Waste Segregation and Disposal Procedures
  8. Plant and Vehicle Management
  9. Dust and Noise Control Measures
  10. PPE Requirements
  11. Emergency Procedures
  12. Sign-Off

Common Questions Before Getting Started

Will this take long?

Under 5 minutes. Select your trade, pick hazards, download.

Is it complicated?

No training needed. The guided builder walks you through every step.

Do I need experience?

If you know what work you're doing, you can use Riskora.

Is it free to try?

Yes. The Free plan needs no card — generate, review and download one free PDF. Upgrade any time for branding, DOCX, sign-off and higher limits.

Create your RAMS in under 5 minutes

No onboarding or setup needed — start generating documents instantly

Try Riskora Free

No card required · 1 free PDF · Upgrade any time (completely free)

Used by contractors and professionalsNo learning curveDocuments ready in minutes
Built for real job scenarios · Used by UK contractors and professionals

All documents generated by Riskora should be reviewed by a competent person before use on site. Riskora provides structured templates — professional judgement is always required.

Inside the document

What your RAMS actually contains

Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.

  • Hazards

    Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.

  • Controls

    Control measures mapped to each hazard with residual risk scoring after controls are applied.

  • PPE

    PPE requirements tied to the activity and site, ready to brief to the team.

  • Method steps

    Step-by-step method statement structured around how the work is actually sequenced on site.

  • Emergency arrangements

    First aid, rescue plan, emergency contacts and site-specific escalation routes.

  • COSHH prompts

    Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.

  • Sign-off

    Operative sign-off captured against the document — names, dates and acknowledgement of the brief.

  • Version history

    Every change tracked so you can show what was issued, when, and which version the team signed.

  • Approval status

    Clear approval state on every document — draft, in review, approved, issued — visible across the team.

  • Audit trail

    Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.

Before & after

From copied-and-pasted to site-specific

The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.

Before

Generic template copied from an old job.

  • • Hazards and controls that don't match this site or task.
  • • Method steps written for a different sequence of work.
  • • No emergency arrangements specific to the location.
  • • Client flags it as generic and asks for a rewrite.
After

Site-specific document structured around this job, site and task.

  • • Hazards captured from the actual scope you pasted in.
  • • Method steps sequenced for how the work runs on site.
  • • Emergency arrangements and rescue plan tied to the location.
  • • Approved internally, briefed to the team, signed off and stored.
How it works

From job details to signed-off document

A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.

  1. 1
    Paste job details

    Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.

  2. 2
    Riskora structures the document

    Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.

  3. 3
    Review, edit and download

    You stay in control of every section. Tweak anything, then download a clean PDF or share a link.

  4. 4
    Brief the team and record sign-off

    Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.

Built for site reality

Built by people who've written this paperwork on real sites

Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.

  • Built for contractors, consultants and teams
    Solo trades, principal contractors and in-house safety teams all run on the same workflow.
  • Supports multiple countries
    UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard.
  • Not just documents
    Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.

Frequently Asked Questions

If you are clearing a site with existing structures built before 2000, a refurbishment and demolition asbestos survey is required before work begins. This applies even to small outbuildings, walls, and hardstanding that may contain asbestos materials.

If the site has a history of industrial use, you should assume potential contamination until a ground investigation proves otherwise. Your RAMS should include procedures for encountering unexpected contamination during clearance.

Yes, if it involves plant machinery, working near services, or ecological considerations such as nesting birds or protected species. Even manual vegetation clearance may require a RAMS if it involves working near hazards.

RAMS as a single document is not named in UK law, but the underlying duties are. The Management of Health and Safety at Work Regulations 1999 require a suitable and sufficient risk assessment, and CDM 2015 effectively requires a written method statement on most construction work. A RAMS satisfies both in one document, which is why principal contractors expect to see one.

Anyone competent to assess the risks of the work. Most subcontractors write their own RAMS for the tasks they carry out — formal qualifications aren't required, but the writer needs to genuinely understand the hazards, the controls and the site. Principal contractors will reject documents that look like they were written by someone who hasn't done the job.

Long enough to cover every hazard and method step honestly — usually 4 to 12 pages. Short, vague RAMS get rejected. Padded ones get skim-read on site, which defeats the point. Aim for specific, not lengthy.

At minimum: before each new site, after any significant change to the work, and after any near-miss or incident. Many principal contractors also expect a documented annual review even if nothing has changed.

Ready? It takes less than 5 minutes.

No training. No complex setup. Just select your trade and go.

Start Your RAMS Now — It's Free

No card required · 1 free PDF · Upgrade for branding, DOCX, sign-off and audit trails (completely free)

Already have a RAMS? Upload and rebuild it

References & Further Reading

Primary UK sources covering the legal and practical framework behind RAMS, risk assessments and method statements.

Free RAMS builder

Create your site clearance uk RAMS free — preview before sign-up

Generate a preview first. Sign up only when you want to save, edit or export.

Final RAMS must be reviewed and approved by a competent person before use.

Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.