Do I need a lift plan for every crane lift?
Yes. LOLER requires that every lifting operation is planned. Routine lifts can use a generic lift plan, but complex, heavy, or tandem lifts need a specific lift plan prepared by a competent appointed person.
What wind speed stops crane operations?
Most mobile cranes have a maximum operating wind speed of 38 mph (moderate gale). Tower cranes typically cease operations at lower speeds. The exact limit depends on the crane type, configuration, and load.
Who needs to be competent for crane operations?
The appointed person (lift planner), crane operator, slinger/signaller, and anyone supervising the lift must be competent. This usually means holding relevant CPCS or NPORS cards.