Build RAMS for Excavation — Buried Services, Shoring, Plant | Riskora

Paste the dig details and build a site-specific RAMS for excavation — buried-services scan, CAT & Genny, shoring or battering, plant/person interface, spoil placement and ground conditions.

Frequently asked questions

Does the RAMS reference HSG47?
Yes — 'Avoiding danger from underground services' is cited and the procedure (drawings, scan, trial holes) is structured into the method.
When do trench supports become mandatory?
Riskora prompts a supports / battering decision at any depth and treats trenches over 1.2m with confined-space considerations including atmospheric monitoring.
Service strike — what's the emergency procedure?
The RAMS includes utility emergency numbers, evacuation distance, and the trigger for calling the relevant DNO / gas emergency line.
Plant-person interface?
Exclusion zone, banksman with agreed signals, slew radius marked and 360° camera / proximity sensor confirmed on the machine.