RAMS and UK Health & Safety Regulations

By the Riskora Editorial Team · Written to our editorial standards

Understand how RAMS support risk assessment and safe work planning. These rules apply in Great Britain; Northern Ireland has separate legislation.

Under 5 minutesNo training neededPDF download

UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Example UK (RAMS) front cover produced by Riskora
Try the new compact mode. Same document, just more compact

Full version

Start Your RAMS Now — It's Free

Takes less than 5 minutes

No card required · 1 lifetime safety document · Upgrade when you need more

Compliance Is Non-Negotiable — But Understanding It Shouldn't Be Hard

Employers must assess work risks and put suitable controls into practice. In Great Britain, CDM 2015 and the Management of Health and Safety at Work Regulations 1999 set duties relevant to construction planning and risk assessment. Northern Ireland has its own regulations. The documents needed depend on the work and applicable duties. Understanding the legal requirements for risk assessments in the UK is the first step toward getting your documentation right.

How Riskora Helps

Riskora helps turn your job details into clear, structured RAMS documents in minutes. Bring hazards, risk assessments, controls and method steps together for a competent person to review against the actual work, site and applicable requirements. While Riskora doesn't provide legal advice, it helps you produce documentation that demonstrates a systematic approach to risk management. If you're new to RAMS, our step-by-step guide to writing a RAMS explains the fundamentals before you start generating.

Who it's for

  • Businesses wanting to understand their RAMS obligations
  • Contractors ensuring their documentation meets CDM 2015 requirements
  • Companies preparing for HSE inspections
  • Safety managers aligning documentation with regulatory frameworks

Key Features

  • Document structure aligned with UK regulations
  • Structured RAMS for planning construction work
  • Control measure hierarchy (eliminate, reduce, inform)
  • Professional document formatting for regulatory submissions
  • Team activity logs and Business audit downloads
  • Regular updates reflecting regulatory changes

Common Questions Before Getting Started

Will this take long?

Under 5 minutes. Select your trade, pick hazards, download.

Is it complicated?

No training needed. The guided builder walks you through every step.

Do I need experience?

If you know what work you're doing, you can use Riskora.

Is it free to try?

Yes. The Free plan needs no card — generate, review and download one free PDF. Upgrade any time for branding, sign-off and higher limits.

Create your RAMS in under 5 minutes

No onboarding or setup needed — start generating documents instantly

Try Riskora Free

No card required · 1 lifetime safety document · Upgrade when you need more

Used by contractors and professionalsNo learning curveDocuments ready in minutes
Built for real job scenarios · Used by UK contractors and professionals

All documents generated by Riskora should be reviewed by a competent person before use on site. Riskora provides structured templates — professional judgement is always required.

Inside the document

Inside your RAMS and its workflow

Create a clear, professional RAMS PDF in minutes, then choose the plan features you need for competent-person sign-off, document versions and team records.

  • Hazards

    Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.

  • Controls

    Control measures mapped to each hazard with residual risk scoring after controls are applied.

  • PPE

    PPE requirements tied to the activity and site, ready to brief to the team.

  • Method steps

    Step-by-step method statement structured around how the work is actually sequenced on site.

  • Emergency arrangements

    First aid, rescue plan, emergency contacts and site-specific escalation routes.

  • COSHH prompts

    Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.

  • Sign-off

    Starter includes basic competent-person sign-off. Team adds briefing signatures and version-linked attendance records.

  • Version history

    Pro includes basic version history. Team adds full version history and version-linked sign-off records.

  • Approval status

    Track draft, in-review, approved and locked document states. Team adds multi-user organisations with defined roles.

  • Audit trail

    Team includes a per-document activity log. Business adds organisation-wide audit trails and advanced audit downloads.

Before & after

From copied-and-pasted to site-specific

Turn your job details into site-specific RAMS in minutes. Review the hazards, controls and work sequence against the actual job before issuing the document.

Before

Generic template copied from an old job.

  • • Hazards and controls that don't match this site or task.
  • • Method steps written for a different sequence of work.
  • • No emergency arrangements specific to the location.
  • • Client flags it as generic and asks for a rewrite.
After

Site-specific document structured around this job, site and task.

  • • Hazards captured from the actual scope you pasted in.
  • • Method steps sequenced for how the work runs on site.
  • • Emergency arrangements and rescue plan tied to the location.
  • • Review before issue; Team adds briefings and version-linked sign-off.
How it works

From job details to signed-off document

Create and review your RAMS PDF in minutes. Add basic sign-off with Starter, version history with Pro and team briefing records with Team.

  1. 1
    Paste job details

    Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.

  2. 2
    Riskora structures the document

    Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.

  3. 3
    Review, edit and download

    Review and edit your job details, hazards and controls, then download your RAMS as a professional PDF.

  4. 4
    Brief the team and record sign-off

    With Team, brief operatives and record their signatures against the document version used for the briefing.

Built for site reality

Built by people who've written this paperwork on real sites

Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.

  • Built for contractors, consultants and teams
    Solo trades, principal contractors and in-house safety teams all run on the same workflow.
  • Supports multiple countries
    UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard.
  • Not just documents
    Choose Starter for basic sign-off, Pro for basic version history, and Team for briefing records and activity logs.

Frequently Asked Questions

There is no general duty to use a document called RAMS. Employers must assess risks and put controls in place. In Great Britain, those with five or more employees must record significant findings; some work has further written requirements. Northern Ireland has separate legislation. Clients may also require RAMS.

CDM 2015 applies in Great Britain and assigns duties according to each project role. Task-level RAMS can support planning and communication; they do not replace the construction phase plan or fulfil every duty. Northern Ireland uses CDM 2016.

Check the risk assessment, planning and recording duties for the work, plus client requirements. A RAMS document alone does not establish compliance. In Great Britain, demolition, dismantling or structural alteration arrangements must be recorded before work begins.

No. Riskora helps prepare structured safety documents. A competent person must review them for the work and applicable requirements before use. Compliance also depends on putting the required arrangements and controls into practice.

Ready? It takes less than 5 minutes.

No training. No complex setup. Just select your trade and go.

Start Your RAMS Now — It's Free

No card required · 1 lifetime safety document · Paid tiers add branding, sign-off and audit trails

Already have a RAMS? Upload and rebuild it

References & Further Reading

Primary UK sources covering the legal and practical framework behind RAMS, risk assessments and method statements.

Free safety-document builder

Create your RAMS free — preview before sign-up

Generate a preview first. Sign up only when you want to save, edit or export.

Final RAMS must be reviewed and approved by a competent person before use.

Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.