What is RAMS?

By the Riskora Editorial Team · Written to our editorial standards

RAMS = Risk Assessment and Method Statement. One document, two halves: the hazards and how you control them, then the step-by-step safe method. This is the plain-English version — what the acronym means, what UK law says, and how contractors can produce one without burning a day on it.

Under 5 minutesNo training neededPDF download

UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Example UK (RAMS) front cover produced by Riskora
Try the new compact mode. Same document, just more compact

Full version

Start Your RAMS Now — It's Free

Takes less than 5 minutes

No card required · 1 lifetime safety document · Upgrade when you need more

Why the term gets confusing

There's no single piece of UK legislation that says 'thou shalt produce a RAMS'. The term is industry shorthand. What the law does require is a suitable and sufficient risk assessment (Regulation 3, MHSWR 1999) and, on construction work, evidence that the job has been planned and managed safely (CDM 2015). A RAMS is the practical document that does both. Principal contractors ask for one before allowing work to start because their own duty under CDM hinges on it.

How Riskora Helps

A good RAMS has two sides that fit together. The risk assessment lists each hazard for the task, scores it using a matrix (typically 5×5 — likelihood × severity), then sets out controls following the hierarchy: eliminate, substitute, engineer, administer, PPE. The method statement then describes the work as a numbered sequence of steps, with the relevant controls baked into each step rather than buried in a separate list. Add project details, plant and materials, emergency arrangements, briefing and sign-off — that's a RAMS.

Who it's for

  • Subcontractors submitting RAMS to a principal contractor before site access
  • Sole traders providing a RAMS to a domestic or commercial client
  • Site managers producing task-specific RAMS for each phase of work
  • Safety advisors reviewing trade RAMS for adequacy and site-specificity

Key Risks and Considerations

  • •Copying a previous job's RAMS without adapting it to the new site — the single biggest rejection reason on UK sites
  • •Listing PPE as the only control measure (PPE is last in the hierarchy, not first)
  • •Scoring hazards without re-scoring after controls — inspectors look for the residual risk
  • •Generic method-statement steps like 'work safely' — every step must say what is done, how, by whom
  • •Missing emergency arrangements specific to the work (rescue from height, confined-space retrieval, fire watch after hot works)
  • •Forgetting to brief and sign on workers before the task starts

Key Features

  • Risk Assessment — hazards, 5×5 scoring, controls in the hierarchy order
  • Method Statement — numbered safe sequence of work with embedded controls
  • Project information — site, client, dates, supervisors, named operatives
  • Plant, equipment, materials and COSHH references
  • PPE schedule by activity
  • Emergency arrangements (first aid, fire, rescue from height, near-miss)
  • Briefing and sign-on record + competent-person approval

Common Questions Before Getting Started

Will this take long?

Under 5 minutes. Select your trade, pick hazards, download.

Is it complicated?

No training needed. The guided builder walks you through every step.

Do I need experience?

If you know what work you're doing, you can use Riskora.

Is it free to try?

Yes. The Free plan needs no card — generate, review and download one free PDF. Upgrade any time for branding, sign-off and higher limits.

Create your RAMS in under 5 minutes

No onboarding or setup needed — start generating documents instantly

Try Riskora Free

No card required · 1 lifetime safety document · Upgrade when you need more

Used by contractors and professionalsNo learning curveDocuments ready in minutes
Built for real job scenarios · Used by UK contractors and professionals

All documents generated by Riskora should be reviewed by a competent person before use on site. Riskora provides structured templates — professional judgement is always required.

Inside the document

What your RAMS actually contains

Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.

  • Hazards

    Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.

  • Controls

    Control measures mapped to each hazard with residual risk scoring after controls are applied.

  • PPE

    PPE requirements tied to the activity and site, ready to brief to the team.

  • Method steps

    Step-by-step method statement structured around how the work is actually sequenced on site.

  • Emergency arrangements

    First aid, rescue plan, emergency contacts and site-specific escalation routes.

  • COSHH prompts

    Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.

  • Sign-off

    Operative sign-off captured against the document — names, dates and acknowledgement of the brief.

  • Version history

    Every change tracked so you can show what was issued, when, and which version the team signed.

  • Approval status

    Clear approval state on every document — draft, in review, approved, issued — visible across the team.

  • Audit trail

    Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.

Before & after

From copied-and-pasted to site-specific

The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.

Before

Generic template copied from an old job.

  • • Hazards and controls that don't match this site or task.
  • • Method steps written for a different sequence of work.
  • • No emergency arrangements specific to the location.
  • • Client flags it as generic and asks for a rewrite.
After

Site-specific document structured around this job, site and task.

  • • Hazards captured from the actual scope you pasted in.
  • • Method steps sequenced for how the work runs on site.
  • • Emergency arrangements and rescue plan tied to the location.
  • • Approved internally, briefed to the team, signed off and stored.
How it works

From job details to signed-off document

A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.

  1. 1
    Paste job details

    Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.

  2. 2
    Riskora structures the document

    Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.

  3. 3
    Review, edit and download

    You stay in control of every section. Tweak anything, then download a clean PDF or share a link.

  4. 4
    Brief the team and record sign-off

    Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.

Built for site reality

Built by people who've written this paperwork on real sites

Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.

  • Built for contractors, consultants and teams
    Solo trades, principal contractors and in-house safety teams all run on the same workflow.
  • Supports multiple countries
    UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard.
  • Not just documents
    Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.

Frequently Asked Questions

Risk Assessment and Method Statement — two documents combined.

The acronym isn't named in law, but the duties are. MHSWR 1999 requires a suitable and sufficient risk assessment; CDM 2015 requires construction work to be planned, managed and monitored. A RAMS demonstrates both.

The contractor doing the work — written by a competent person with practical knowledge of the task. On multi-contractor sites the principal contractor reviews and coordinates them.

From a blank PDF template: 2–4 hours for a single-trade task, longer for complex work. Using a guided builder with trade-specific hazard libraries: 5–10 minutes.

Long enough to be site-specific, short enough to brief on the morning. A single-task RAMS is usually 6–15 pages. 40-page generic RAMS get rejected more than they get read.

Yes — as a starting point. A blank template forces you to identify every hazard and control from memory. The risk is omissions: missing hazards, wrong scoring, PPE-only controls. A guided builder removes that risk by loading the right hazards for your trade.

Ready? It takes less than 5 minutes.

No training. No complex setup. Just select your trade and go.

Start Your RAMS Now — It's Free

No card required · 1 lifetime safety document · Paid tiers add branding, sign-off and audit trails

Already have a RAMS? Upload and rebuild it

References & Further Reading

Primary UK sources covering the legal and practical framework behind RAMS, risk assessments and method statements.

Free safety-document builder

Create your RAMS free — preview before sign-up

Generate a preview first. Sign up only when you want to save, edit or export.

Final RAMS must be reviewed and approved by a competent person before use.

Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.