Risk Assessment for Temporary Works UK

By the Riskora Editorial Team · Reviewed against our editorial standards · Last reviewed

Managing temporary works? Riskora generates risk assessments covering propping, falsework, shoring, and temporary support systems — aligned with BS 5975 procedures.

Under 5 minutesNo training neededPDF download

UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Example UK (RAMS) front cover produced by Riskora
Try the new compact mode. Same document, just more compact

Full version

Start Your RAMS Now — It's Free

Takes less than 5 minutes

No card required · 1 free PDF · Upgrade any time (completely free)

Temporary Works Failures Have Catastrophic Consequences

Temporary works — propping, falsework, formwork, shoring, and temporary bracing — support permanent structures during construction. When they fail, the consequences are immediate and severe: structural collapse, multiple casualties, and major site shutdowns. BS 5975 sets out a procedural framework for managing temporary works, including design checking, inspection, and controlled loading. Understanding the complete guide to RAMS in the UK helps frame why proper documentation matters.

BS 5975:2019 provides the procedural framework for managing temporary works in construction. CDM 2015 requires that temporary works are properly designed, installed, and managed throughout their use.

How Riskora Helps

Riskora generates temporary works risk assessments covering the identification of temporary works elements, design and check responsibilities, installation procedures, loading sequences, monitoring, and striking procedures. You can also use our standalone risk assessment builder or method statement tool.

Who it's for

  • Site engineers managing temporary works on construction projects
  • Temporary works coordinators implementing BS 5975 procedures
  • Formwork contractors designing and installing concrete formwork
  • Structural engineers assessing temporary support requirements

Key Risks and Considerations

  • Structural collapse — failure of props, falsework, or temporary bracing
  • Overloading — exceeding design loads during construction
  • Premature striking — removing temporary support before the permanent structure is adequate
  • Inadequate design — temporary works not designed for actual loads and conditions
  • Poor installation — temporary works not built to the design specification
  • Ground bearing failure — props bearing on inadequate ground

What UK Law Actually Says

Direct quotes from the named regulations, with plain-English explanations of what each one means in practice.

Clause 5, BS 5975:2019 — Code of practice for temporary works procedures

Each organisation shall appoint a Temporary Works Coordinator (TWC) for every project, with responsibility for ensuring temporary works are designed, checked, installed and removed in accordance with documented procedures.

BS 5975:2019 is the framework HSE inspectors and principal contractors apply. The risk assessment must name the TWC, the Temporary Works Designer (TWD), and the independent design checker — with the design check category (1, 2, or 3) recorded.

Read the source on legislation.gov.uk →

Regulation 19, Construction (Design and Management) Regulations 2015

All practicable steps shall be taken, where necessary to prevent danger to any person, to ensure that any new or existing structure or any part of such a structure which may become unstable or in a temporary state of weakness or instability does not collapse.

CDM 2015 Reg 19 is the regulation behind every temporary works prosecution. The risk assessment must show the loading sequence was designed (not just assumed), the load on each prop calculated, and the permit-to-load issued before any concrete pour or backfill.

Read the source on legislation.gov.uk →

Regulation 28, Construction (Design and Management) Regulations 2015

Suitable and sufficient steps shall be taken to prevent, so far as is reasonably practicable, any person being buried under earth-falls or trapped by falls or dislodgement of any material.

Reg 28 is invoked when temporary supports to excavations (trench boxes, sheet piles, cofferdams) fail. The risk assessment must show the support was designed by a competent engineer and inspected weekly per Schedule 3.

Read the source on legislation.gov.uk →

The Numbers Behind the Risk

Why this matters — the most recent published figures from the Health and Safety Executive and ONS.

10+ collapses per year

HSE temporary-works investigation data consistently identifies 10–15 reportable temporary-works collapses per year in UK construction, with multiple-casualty incidents averaging one to two annually.

Source: HSE — Construction sector

Category 3 check mandatory above £1m / complex

BS 5975 mandates a Category 3 independent design check (separate organisation) for high-risk falsework, deep excavation support, and demolition propping — skipping it is the most common audit finding.

Source: BS 5975:2019 — Code of practice

Common Mistakes (and How to Avoid Them)

1. No TWC named on the assessment

Why it fails: BS 5975 makes the TWC role mandatory and personal — without a named person, no design check can be signed, no permit-to-load issued, and no formal striking authorised.

Fix: Name the TWC with their qualification (CITB SMSTS + TWC course or equivalent) and contact number on the front sheet.

2. Treating standard-solution props as 'no design needed'

Why it fails: Category 1 standard solutions (e.g. Acrow props in single floor formwork) still require the design check to confirm load and arrangement match the published catalogue — not a free pass.

Fix: Reference the supplier's design data sheet and the load calculation showing the actual applied load is below the rated capacity at the as-installed height.

3. Striking before the permanent structure is gained strength

Why it fails: Concrete element strikes before 70% characteristic strength (typically 7 days at 20°C) regularly cause collapse. RAMS must reference the cube-test or maturity-meter trigger, not a calendar date.

Fix: Specify the strength-gain method (cubes, maturity meter), the trigger value, and the named person authorising the permit-to-strike.

Temporary Works Design Check Categories — BS 5975 Quick Reference

BS 5975:2019 classifies temporary works into three categories based on complexity and consequence of failure. The category determines who can carry out the design check, and the risk assessment must reference this explicitly.

CategoryTypical examplesDesign check byPermit to load required?
Category 1Standard-solution props, short trench boxes, simple edge protectionAnother competent person in same teamNo — TWC inspection only
Category 2Falsework < 6 m, trench supports > 2.4 m, scaffold fansIndependent competent person in same organisationYes — issued by TWC
Category 3Falsework > 6 m, cofferdams, demolition propping, bridge bearing replacementIndependent organisationYes — countersigned by TWD

Sources: BS 5975:2019 Clause 5; CDM 2015 Regulation 19; CIRIA C760 (Guidance on embedded retaining wall design). Original synthesis — confirm against project temporary-works register.

Key Features

  • Temporary works classification
  • BS 5975 procedure alignment
  • Design check requirements
  • Installation and striking procedures
  • Loading sequence controls
  • Download to PDF

Example Structure (UK Standard)

  1. Project Details and Temporary Works Register
  2. Risk Assessment — Collapse, Overloading, Ground Failure
  3. Design and Check Certificate References
  4. Method Statement — Installation, Loading, Monitoring, Striking
  5. Inspection and Approval Procedures
  6. Emergency Procedures
  7. Sign-Off and TWC Approval

Common Questions Before Getting Started

Will this take long?

Under 5 minutes. Select your trade, pick hazards, download.

Is it complicated?

No training needed. The guided builder walks you through every step.

Do I need experience?

If you know what work you're doing, you can use Riskora.

Is it free to try?

Yes. The Free plan needs no card — generate, review and download one free PDF. Upgrade any time for branding, DOCX, sign-off and higher limits.

Create your RAMS in under 5 minutes

No onboarding or setup needed — start generating documents instantly

Try Riskora Free

No card required · 1 free PDF · Upgrade any time (completely free)

Used by contractors and professionalsNo learning curveDocuments ready in minutes
Built for real job scenarios · Used by UK contractors and professionals

All documents generated by Riskora should be reviewed by a competent person before use on site. Riskora provides structured templates — professional judgement is always required.

Inside the document

What your RAMS actually contains

Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.

  • Hazards

    Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.

  • Controls

    Control measures mapped to each hazard with residual risk scoring after controls are applied.

  • PPE

    PPE requirements tied to the activity and site, ready to brief to the team.

  • Method steps

    Step-by-step method statement structured around how the work is actually sequenced on site.

  • Emergency arrangements

    First aid, rescue plan, emergency contacts and site-specific escalation routes.

  • COSHH prompts

    Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.

  • Sign-off

    Operative sign-off captured against the document — names, dates and acknowledgement of the brief.

  • Version history

    Every change tracked so you can show what was issued, when, and which version the team signed.

  • Approval status

    Clear approval state on every document — draft, in review, approved, issued — visible across the team.

  • Audit trail

    Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.

Before & after

From copied-and-pasted to site-specific

The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.

Before

Generic template copied from an old job.

  • • Hazards and controls that don't match this site or task.
  • • Method steps written for a different sequence of work.
  • • No emergency arrangements specific to the location.
  • • Client flags it as generic and asks for a rewrite.
After

Site-specific document structured around this job, site and task.

  • • Hazards captured from the actual scope you pasted in.
  • • Method steps sequenced for how the work runs on site.
  • • Emergency arrangements and rescue plan tied to the location.
  • • Approved internally, briefed to the team, signed off and stored.
How it works

From job details to signed-off document

A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.

  1. 1
    Paste job details

    Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.

  2. 2
    Riskora structures the document

    Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.

  3. 3
    Review, edit and download

    You stay in control of every section. Tweak anything, then download a clean PDF or share a link.

  4. 4
    Brief the team and record sign-off

    Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.

Built for site reality

Built by people who've written this paperwork on real sites

Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.

  • Built for contractors, consultants and teams
    Solo trades, principal contractors and in-house safety teams all run on the same workflow.
  • Supports multiple countries
    UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard.
  • Not just documents
    Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.

Frequently Asked Questions

The TWC is the person responsible for managing temporary works procedures on site. They ensure designs are checked, installations are inspected, and controlled loading and striking procedures are followed.

All temporary works need to be considered — even simple props. Category 1 (lower risk) items may use standard solutions, but Category 2 and 3 items require formal design and independent checking.

Temporary works should only be struck when the permanent structure can safely carry all loads. This requires formal approval — typically a permit to load or permit to strike — from the TWC and designer.

It's the wording from the Management of Health and Safety at Work Regulations 1999. In practice it means the assessment identifies the significant hazards, evaluates who could be harmed, considers existing controls, and is proportionate to the risk — not generic, not exhaustive, but enough to actually inform safer work.

Not always. If the work, site conditions and people are genuinely the same as a previous job, you can reuse a risk assessment — but you must review it and confirm nothing has changed. As soon as the site, scope or team changes, it needs revisiting.

Ready? It takes less than 5 minutes.

No training. No complex setup. Just select your trade and go.

Start Your RAMS Now — It's Free

No card required · 1 free PDF · Upgrade for branding, DOCX, sign-off and audit trails (completely free)

Already have a RAMS? Upload and rebuild it

References & Further Reading

Primary UK sources covering the legal and practical framework behind RAMS, risk assessments and method statements.

Free RAMS builder

Create your RAMS free — preview before sign-up

Generate a preview first. Sign up only when you want to save, edit or export.

Final RAMS must be reviewed and approved by a competent person before use.

Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.