Generate cladding RAMS that withstand post-Grenfell scrutiny — covering BS 8579 facade design, panel wind loading, MEWP and mast climber access, fire performance verification (A1/A2-s1,d0), and the golden thread evidence required under the Building Safety Act 2022.
UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Full version
Takes less than 5 minutes
No card required · 1 free PDF · Upgrade any time (completely free)
A cladding RAMS must cover the system specification (rainscreen, curtain wall, ACM/MCM, terracotta, brickslip), the European fire classification of every layer (A1/A2-s1,d0 expected for HRBs over 18m), Building Safety Act 2022 / Approved Document B compliance reference, BS 8579:2020 design guidance, panel weights and lifting plan, mechanical or vacuum lift methodology, MEWP/mast climber/scaffold access plan with wind shut-down thresholds (typically 17–25 mph depending on panel size), fixing torque and pull-out test records, fire-stopping at compartment lines, and the golden thread documentation pack handed over to the Accountable Person.
Since Grenfell, cladding installation operates under a regulatory regime no other facade trade faces. The Building Safety Act 2022 introduced gateways, the Accountable Person duty, and a 'golden thread' of digital evidence that must be maintained for the life of the building. Approved Document B restricts combustible materials in external walls of buildings over 18m (11m in Wales), and the new BSR (Building Safety Regulator) actively reviews documentation on higher-risk buildings. On top of all this, your operatives are still working at height, handling 80–200 kg panels in wind, and interfacing with multiple facade trades. A generic 'working at height' RAMS will be rejected on any HRB. Many contractors aren't sure what the law actually requires of their risk assessments.
Riskora generates cladding RAMS structured for post-BSA scrutiny. The builder prompts for system classification (Reaction to Fire to BS EN 13501-1), HRB status, BS 8579 design reference, panel-by-panel lifting plan, wind shut-down thresholds, and golden thread evidence outputs. Method steps cover bracket setting, breather membrane installation, insulation (mineral wool A1 expected), cavity barriers and fire-stopping, panel hanging sequence, and post-installation pull-out testing. For more complex projects, you may also need a standalone risk assessment or method statement.
Before you generate your document, these guides cover the knowledge that underpins every good RAMS, risk assessment, and method statement.
What Is a RAMS Document?
Understand the two components of a RAMS and why they're required before work begins on site.
How to Write a RAMS Document
A step-by-step guide to structuring your RAMS from project details through to sign-off.
UK Legal Requirements for Risk Assessments
What the law requires under MHSWR 1999 and CDM 2015, and what 'suitable and sufficient' means.
Who Needs a RAMS?
Find out whether your work requires a RAMS and who is responsible for producing one.
RAMS vs Risk Assessment — Key Differences
When you need a full RAMS versus a standalone risk assessment, and how the two documents work together.
Construction Safety Documents Explained
An overview of the key safety documents required on UK construction sites and how they relate to each other.
Will this take long?
Under 5 minutes. Select your trade, pick hazards, download.
Is it complicated?
No training needed. The guided builder walks you through every step.
Do I need experience?
If you know what work you're doing, you can use Riskora.
Is it free to try?
Yes. The Free plan needs no card — generate, review and download one free PDF. Upgrade any time for branding, DOCX, sign-off and higher limits.
Create your RAMS in under 5 minutes
No onboarding or setup needed — start generating documents instantly
Try Riskora FreeNo card required · 1 free PDF · Upgrade any time (completely free)
All documents generated by Riskora should be reviewed by a competent person before use on site. Riskora provides structured templates — professional judgement is always required.
"The Building Safety Act 2022 changed cladding from a normal facade trade into a duty-holder activity. If your RAMS doesn't reference Approved Document B classifications, BS 8579 design, and the golden thread, it isn't a cladding RAMS — it's a working at height document with cladding in the title."
Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.
Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.
Control measures mapped to each hazard with residual risk scoring after controls are applied.
PPE requirements tied to the activity and site, ready to brief to the team.
Step-by-step method statement structured around how the work is actually sequenced on site.
First aid, rescue plan, emergency contacts and site-specific escalation routes.
Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.
Operative sign-off captured against the document — names, dates and acknowledgement of the brief.
Every change tracked so you can show what was issued, when, and which version the team signed.
Clear approval state on every document — draft, in review, approved, issued — visible across the team.
Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.
The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.
Generic template copied from an old job.
Site-specific document structured around this job, site and task.
A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.
Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.
Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.
You stay in control of every section. Tweak anything, then download a clean PDF or share a link.
Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.
Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.
No training. No complex setup. Just select your trade and go.
Start Your RAMS Now — It's FreeNo card required · 1 free PDF · Upgrade for branding, DOCX, sign-off and audit trails (completely free)
Primary UK sources covering the legal and practical framework behind RAMS, risk assessments and method statements.
Generate a preview first. Sign up only when you want to save, edit or export.
Final RAMS must be reviewed and approved by a competent person before use.
Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.