By the Riskora Editorial Team · Reviewed against our editorial standards · Last reviewed
Generate structured RAMS for Gas Safe registered work — covering gas installation, testing, purging, leak detection, commissioning, and emergency procedures for gas-related incidents.
UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Full version
Takes less than 5 minutes
No card required · 1 free PDF · Upgrade any time (completely free)
Gas work RAMS must cover the scope of gas work (installation, maintenance, repair, commissioning), Gas Safe registration confirmation, gas tightness testing procedures, purging methodology, combustion analysis, ventilation requirements, carbon monoxide detection, flue gas analysis, isolation procedures, and emergency actions for gas leaks including the National Gas Emergency number (0800 111 999). The RAMS must confirm that all gas work will be carried out by Gas Safe registered engineers.
The Gas Safety (Installation and Use) Regulations 1998 make it a criminal offence for any unregistered person to carry out gas work on natural gas or LPG installations. Gas Safe Register (formerly CORGI) is the only legal body for registration. The standards stack on top: BS 6891 for low-pressure pipework, IGE/UP/1 and /1B for tightness testing and purging on industrial and commercial systems, BS 6644 for commercial boilers, and the Building Regulations Part J for combustion ventilation and flueing. Carbon monoxide from poor combustion or inadequate flueing kills around 30 people a year in the UK and hospitalises hundreds. Your RAMS isn't just a site document — it's the evidence that a registered, ACS-qualified engineer applied the right procedures, in the right order, on the right scope. Understanding the legal requirements for risk assessments in the UK is the first step toward getting your documentation right.
Riskora generates gas work RAMS covering domestic boiler installation, commercial catering gas, gas pipework alterations, meter relocation and decommissioning. The tool prompts for Gas Safe registration number, ACS category (CCN1, CENWAT, COCN1, CODNCO1 etc.), tightness testing per BS 6891 or IGE/UP/1B, controlled purging volume calculations, combustion analysis (CO, CO₂, ratio, flue gas O₂), Building Regulations Part J ventilation check, and the National Gas Emergency Service number (0800 111 999) for incident response. If you're new to RAMS, our step-by-step guide to writing a RAMS explains the fundamentals before you start generating.
Before you generate your document, these guides cover the knowledge that underpins every good RAMS, risk assessment, and method statement.
What Is a RAMS Document?
Understand the two components of a RAMS and why they're required before work begins on site.
How to Write a RAMS Document
A step-by-step guide to structuring your RAMS from project details through to sign-off.
UK Legal Requirements for Risk Assessments
What the law requires under MHSWR 1999 and CDM 2015, and what 'suitable and sufficient' means.
Who Needs a RAMS?
Find out whether your work requires a RAMS and who is responsible for producing one.
How to Write a RAMS (UK Guide)
A practical walkthrough of writing RAMS from scratch, covering structure, common mistakes, and what reviewers look for.
RAMS vs Risk Assessment — Key Differences
When you need a full RAMS versus a standalone risk assessment, and how the two documents work together.
Direct quotes from the named regulations, with plain-English explanations of what each one means in practice.
Regulation 3(1), Gas Safety (Installation and Use) Regulations 1998
“No person shall carry out any work in relation to a gas fitting or gas storage vessel unless he is competent to do so.”
GSIUR Reg 3 is the bedrock — Gas Safe registration is the proof of competence, and the RAMS must reference it by registration number. Anyone working on gas without Gas Safe registration is committing an offence regardless of how good the RAMS is.
Read the source on legislation.gov.uk →Regulation 26, Gas Safety (Installation and Use) Regulations 1998
“No person shall use, or permit to be used, any gas appliance which he knows or has reason to suspect cannot be used without constituting a danger to any person.”
Reg 26 puts an active duty on the engineer to disconnect or warn against the use of an unsafe appliance found during work. The RAMS should document the AR/ID/NCS classification process for any existing appliance encountered.
Read the source on legislation.gov.uk →Why this matters — the most recent published figures from the Health and Safety Executive and ONS.
21 CO fatalities
Annual average accidental carbon monoxide poisoning deaths in domestic settings — a meaningful share traceable to defective gas installations or work performed by unregistered persons.
Source: HSE — Carbon monoxide →12,000 enquiries to Gas Safe per year
Approximate annual enquiries received by the Gas Safe Register from members of the public about suspected unregistered gas work.
Source: Gas Safe Register →A Gas Safe registered commercial gas engineer is installing a six-burner gas range and salamander grill in a small restaurant kitchen, replacing an existing four-burner unit. The supply is U6 metered; the gas line needs uprating from 22mm to 28mm copper to handle the increased load.
The structured builder sequences: (1) load calculation done and submitted, confirming the existing meter and pipework as upgraded will deliver adequate working pressure, (2) gas isolated at the meter with valve locked-off, ID-tagged and photographed, (3) old appliance disconnected, capped, and the disconnection witnessed by the duty manager, (4) new 28mm pipework installed, pressure-tested per IGEM/UP/1A, (5) appliances connected, tightness-tested under working pressure, (6) commissioned with combustion analyser (calibration date noted), (7) gas-safe notification submitted, customer instructions and emergency-shutoff training delivered.
Operative's commercial Gas Safe categories (COMCAT 1, 3, 5) are listed by number and expiry. Ventilation calculation per BS 6173 is referenced. Fire suppression integration with the existing extraction canopy is checked. Total RAMS time: 9 minutes. The kitchen reopened on time the following day.
1. Domestic Gas Safe number used for commercial work
Why it fails: Commercial gas work requires COMCAT categories — not domestic CCN1. RAMS that reference the wrong category fail at the competence test instantly.
Fix: Match the Gas Safe category to the work type: domestic (CCN1, CENWAT, CKR1), commercial (COMCAT), LPG (LPG), pipework (CCN1).
2. No gas tightness test documented
Why it fails: GSIUR effectively requires a tightness test on any gas pipework alteration. Missing this from the RAMS is a frequent inspector finding.
Fix: Document the tightness test: pressure used, duration, pass criteria, any pressure drop observed. Per IGEM/UP/1B for domestic, IGEM/UP/1A for commercial.
3. AR/ID/NCS classification skipped on existing appliances
Why it fails: Engineers attending a job often find an unrelated unsafe appliance. GSIUR Reg 26 requires action — the RAMS should pre-empt this by stating the classification and warning-notice procedure.
Fix: Include an existing-appliance assessment section. State the procedure for AR (At Risk), ID (Immediately Dangerous) and NCS (Not to Current Standards) findings.
Will this take long?
Under 5 minutes. Select your trade, pick hazards, download.
Is it complicated?
No training needed. The guided builder walks you through every step.
Do I need experience?
If you know what work you're doing, you can use Riskora.
Is it free to try?
Yes. The Free plan needs no card — generate, review and download one free PDF. Upgrade any time for branding, DOCX, sign-off and higher limits.
Create your RAMS in under 5 minutes
No onboarding or setup needed — start generating documents instantly
Try Riskora FreeNo card required · 1 free PDF · Upgrade any time (completely free)
All documents generated by Riskora should be reviewed by a competent person before use on site. Riskora provides structured templates — professional judgement is always required.
"Gas work is the one trade where a mistake in the RAMS isn't just a document failure — it's a potential fatality waiting to happen. Every procedure matters."
Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.
Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.
Control measures mapped to each hazard with residual risk scoring after controls are applied.
PPE requirements tied to the activity and site, ready to brief to the team.
Step-by-step method statement structured around how the work is actually sequenced on site.
First aid, rescue plan, emergency contacts and site-specific escalation routes.
Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.
Operative sign-off captured against the document — names, dates and acknowledgement of the brief.
Every change tracked so you can show what was issued, when, and which version the team signed.
Clear approval state on every document — draft, in review, approved, issued — visible across the team.
Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.
The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.
Generic template copied from an old job.
Site-specific document structured around this job, site and task.
A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.
Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.
Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.
You stay in control of every section. Tweak anything, then download a clean PDF or share a link.
Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.
Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.
No training. No complex setup. Just select your trade and go.
Start Your RAMS Now — It's FreeNo card required · 1 free PDF · Upgrade for branding, DOCX, sign-off and audit trails (completely free)
Primary UK sources covering the legal and practical framework behind RAMS, risk assessments and method statements.
Generate a preview first. Sign up only when you want to save, edit or export.
Final RAMS must be reviewed and approved by a competent person before use.
Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.