Generate a UK-structured RAMS for heating installation — boiler, radiator and pipework works. Covers Gas Safe scope boundary, hot works, F-gas, scalding and L8 Legionella controls.
Frequently asked questions
- Does the RAMS need to record Gas Safe numbers?
- Yes. Principal contractors expect the engineer's Gas Safe registration number and the relevant ACS competencies (e.g. CCN1, CENWAT) recorded against the named operative carrying out gas connection and commissioning.
- How does Riskora handle the hot-works portion?
- There's a dedicated hot-works section with a permit template, fire-watch period (typically 60 minutes after the last hot operation), and combustible-material control measures. This is what most reviewers look for first.
- Do I need a separate Legionella risk assessment?
- For first fill of new pipework, the controls (chlorination, flushing) sit inside the heating RAMS. For ongoing system management on commercial installations, a separate L8 written scheme is required and Riskora can generate the risk-assessment portion.
- Can I attach the boiler manufacturer's commissioning checklist?
- Yes. The downloaded document supports appendices, and the manufacturer's commissioning sheet is normally appended as evidence the unit was set up to spec.