Generate structured RAMS for plumbing and pipework installation — covering hot work procedures, water system hygiene, manual handling, and COSHH assessments for sealants and fluxes.
UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Full version
Takes less than 5 minutes
No card required · 1 free PDF · Upgrade any time (completely free)
A plumbing RAMS must cover the type of pipework system (domestic hot/cold, heating, waste, rainwater), hot work procedures for soldering and brazing, water hygiene and Legionella risk management, COSHH assessments for flux, sealants, and jointing compounds, manual handling of pipe runs and fittings, working at height where accessing risers or ceiling voids, isolation and drain-down procedures, pressure testing methodology, and first and second fix sequencing on new-build projects.
Plumbing isn't just connecting pipes. It involves hot work (soldering copper with open flames near combustible materials), working with chemicals (flux, sealants, cutting oils), manual handling of heavy cast iron and steel pipe, working in confined ceiling voids and risers, and managing water hygiene risks including Legionella. On commercial and new-build sites, the principal contractor expects RAMS that address all of these — not a generic one-page document. Without knowing who actually needs a RAMS, many small firms either over-document or under-document their work.
Riskora generates plumbing-specific RAMS covering domestic and commercial pipework installation, heating systems, sanitary ware, and waste systems. The tool includes hot work procedure templates, COSHH hazards for common plumbing chemicals, manual handling controls for pipe runs, and water hygiene considerations. Select your work type and generate a structured RAMS ready for principal contractor submission. If you're new to RAMS, our step-by-step guide to writing a RAMS explains the fundamentals before you start generating.
Before you generate your document, these guides cover the knowledge that underpins every good RAMS, risk assessment, and method statement.
What Is a RAMS Document?
Understand the two components of a RAMS and why they're required before work begins on site.
How to Write a RAMS Document
A step-by-step guide to structuring your RAMS from project details through to sign-off.
UK Legal Requirements for Risk Assessments
What the law requires under MHSWR 1999 and CDM 2015, and what 'suitable and sufficient' means.
Who Needs a RAMS?
Find out whether your work requires a RAMS and who is responsible for producing one.
How to Write a RAMS (UK Guide)
A practical walkthrough of writing RAMS from scratch, covering structure, common mistakes, and what reviewers look for.
Construction Safety Documents Explained
An overview of the key safety documents required on UK construction sites and how they relate to each other.
Direct quotes from the named regulations, with plain-English explanations of what each one means in practice.
Regulation 4(1), Gas Safety (Installation and Use) Regulations 1998
“No person shall carry out any work in relation to a gas fitting or gas storage vessel unless he is competent to do so.”
GSIUR Reg 3 (often referenced as Reg 4 in older guidance) makes Gas Safe registration the legal competence test for any work on a gas-related plumbing installation. The RAMS must record the registered operative's Gas Safe number — not just their name.
Read the source on legislation.gov.uk →Regulation 7, Control of Substances Hazardous to Health Regulations 2002
“Every employer shall ensure that the exposure of his employees to substances hazardous to health is either prevented or, where this is not reasonably practicable, adequately controlled.”
Plumbing involves jointing compounds, flux, solvents and (in older properties) lead solder. COSHH Reg 7 requires each of these to be assessed and controlled — not just listed. The RAMS should reference COSHH assessments by substance.
Read the source on legislation.gov.uk →Why this matters — the most recent published figures from the Health and Safety Executive and ONS.
21 carbon monoxide deaths
Annual average domestic carbon monoxide poisoning deaths in England and Wales — many traced to incompetent gas plumbing work.
Source: HSE — Carbon monoxide →£250,000 fine, 2022
Sentence handed to an unregistered installer following a CO poisoning incident — a vivid reminder that Gas Safe registration is the legal threshold for gas plumbing work.
Source: HSE — Recent prosecutions →A self-employed Gas Safe registered plumber is replacing a 12-year-old combi boiler in a 4th-floor flat with no lift access. Two-day job: day one strip-out and pipework alterations, day two new boiler installation, commissioning and benchmarking.
The structured builder sequences the activity: (1) gas supply isolated and locked-out at the meter, with isolation tag photographed, (2) flue terminal externally accessed via a temporary mansafe line on the flat-roof balcony, (3) old boiler dismantled and lowered to ground level via the stairwell with two operatives and protection mats, (4) new pipework run with capillary fittings (lead-free solder; flux COSHH-assessed), (5) condensate route designed to discharge internally (cold-weather frost-protection per the Building Regs Part J), (6) commissioning with combustion analyser (calibration date in the RAMS), (7) benchmark book completed and Gas Safe notification submitted.
Operative's Gas Safe number, ACS qualifications (CCN1, CENWAT) and unvented competence (G3) are all recorded. The customer's smoke and CO alarms are tested before handover. Total RAMS production: 6 minutes for a job that combines gas, water and working at low-level height.
1. Gas Safe registration recorded as 'yes' rather than the number
Why it fails: A tick-box doesn't satisfy GSIUR. The Gas Safe number is the verifiable evidence of competence — and HSE will check it.
Fix: Capture the Gas Safe number, the qualifications held (CCN1, CENWAT, etc.) and the registration expiry. Verify on the Gas Safe Register before starting work.
2. No COSHH assessment for flux and solvents
Why it fails: Flux contains zinc chloride; solvent cement releases tetrahydrofuran vapour. COSHH Reg 6 requires each to be assessed. Generic 'use according to manufacturer's instructions' isn't a COSHH assessment.
Fix: Reference COSHH assessments by substance in the RAMS. Cover ventilation, glove type, eye protection, and disposal.
3. No customer notification or vulnerable-occupant check
Why it fails: Gas work in occupied properties affects occupants. Failing to identify vulnerable occupants (elderly, infants, medical-equipment users) before isolating supply is a recurring failing.
Fix: Add a customer-liaison section: who is in the property, who needs advance warning, what the no-supply window is, and the emergency contact during the work.
Will this take long?
Under 5 minutes. Select your trade, pick hazards, download.
Is it complicated?
No training needed. The guided builder walks you through every step.
Do I need experience?
If you know what work you're doing, you can use Riskora.
Is it free to try?
Yes. The Free plan needs no card — generate, review and download one free PDF. Upgrade any time for branding, DOCX, sign-off and higher limits.
Create your RAMS in under 5 minutes
No onboarding or setup needed — start generating documents instantly
Try Riskora FreeNo card required · 1 free PDF · Upgrade any time (completely free)
All documents generated by Riskora should be reviewed by a competent person before use on site. Riskora provides structured templates — professional judgement is always required.
"Good plumbing RAMS address the things that catch people out — the open flame near insulation, the heavy cylinder up the stairs, the flux fumes in an unventilated space."
Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.
Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.
Control measures mapped to each hazard with residual risk scoring after controls are applied.
PPE requirements tied to the activity and site, ready to brief to the team.
Step-by-step method statement structured around how the work is actually sequenced on site.
First aid, rescue plan, emergency contacts and site-specific escalation routes.
Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.
Operative sign-off captured against the document — names, dates and acknowledgement of the brief.
Every change tracked so you can show what was issued, when, and which version the team signed.
Clear approval state on every document — draft, in review, approved, issued — visible across the team.
Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.
The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.
Generic template copied from an old job.
Site-specific document structured around this job, site and task.
A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.
Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.
Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.
You stay in control of every section. Tweak anything, then download a clean PDF or share a link.
Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.
Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.
No training. No complex setup. Just select your trade and go.
Start Your RAMS Now — It's FreeNo card required · 1 free PDF · Upgrade for branding, DOCX, sign-off and audit trails (completely free)
Primary UK sources covering the legal and practical framework behind RAMS, risk assessments and method statements.
Generate a preview first. Sign up only when you want to save, edit or export.
Final RAMS must be reviewed and approved by a competent person before use.
Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.