RAMS for Playground Installation UK — Free 5-Min Builder

RAMS for play equipment installation — excavation, concrete, lifting. Professional format for site submission. Try Riskora free.

Frequently asked questions

Do I need a RAMS for this work?
On any UK construction site, yes. Principal contractors require safety documentation from every subcontractor before allowing work to proceed. Even on smaller projects, a RAMS demonstrates competence and is increasingly expected by clients and insurance providers.
How long does it take to create?
With Riskora, under 5 minutes. Select your work type, review the pre-loaded hazards and controls, add site-specific details, and download. No training needed.
Is the output accepted by principal contractors?
Yes. Riskora generates professional documents in the standard UK format with risk matrices, control measures, and method statements that principal contractors expect.
Can I edit the document after generating it?
Yes. Every section is editable. Add, remove, or modify hazards, controls, and method steps to match your specific site conditions.