Refurbishment and strip-out work often takes place in occupied or partially occupied buildings, with unknown materials, hidden asbestos, and structural uncertainties. Your RAMS needs to cover material identification, dust suppression, structural integrity, and segregation from building occupants. Riskora generates structured documentation with refurbishment-specific hazards built in.
UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Full version
Takes less than 5 minutes
No card required · 1 free PDF · Upgrade any time (completely free)
HSE data shows that refurbishment and maintenance work accounts for a disproportionate number of construction injuries and fatalities compared to new build. The reasons are clear: unknown structural conditions, asbestos-containing materials, live services within walls and ceilings, shared access with building occupants, and working in confined or restricted spaces. Strip-out work adds the risk of structural instability as loadbearing elements are exposed or disturbed. Many contractors underestimate these risks because refurbishment feels less hazardous than demolition — but the statistics tell a different story. Without knowing who actually needs a RAMS, many small firms either over-document or under-document their work.
CDM 2015 requires that pre-construction information includes details of existing structures, hazardous materials, and services. For refurbishment work, a Refurbishment and Demolition Asbestos Survey is required under the Control of Asbestos Regulations 2012 before any intrusive work begins.
Riskora generates refurbishment and strip-out RAMS covering asbestos management, structural assessment, dust and noise control, service isolation, and occupied building procedures. The system loads hazards specific to interior demolition, ceiling removal, partition stripping, and floor preparation. If you're new to RAMS, our step-by-step guide to writing a RAMS explains the fundamentals before you start generating.
Before you generate your document, these guides cover the knowledge that underpins every good RAMS, risk assessment, and method statement.
What Is a RAMS Document?
Understand the two components of a RAMS and why they're required before work begins on site.
How to Write a RAMS Document
A step-by-step guide to structuring your RAMS from project details through to sign-off.
UK Legal Requirements for Risk Assessments
What the law requires under MHSWR 1999 and CDM 2015, and what 'suitable and sufficient' means.
Who Needs a RAMS?
Find out whether your work requires a RAMS and who is responsible for producing one.
Construction Safety Documents Explained
An overview of the key safety documents required on UK construction sites and how they relate to each other.
How to Write a RAMS (UK Guide)
A practical walkthrough of writing RAMS from scratch, covering structure, common mistakes, and what reviewers look for.
Direct quotes from the named regulations, with plain-English explanations of what each one means in practice.
Regulation 5, Control of Asbestos Regulations 2012
“An employer must not undertake work in demolition, maintenance or any other work which exposes or is liable to expose his employees to asbestos in respect of any premises unless either he has carried out a suitable and sufficient assessment.”
Refurbishment of any pre-2000 building must be preceded by an R&D survey. Not the simpler Management Survey — a Refurbishment & Demolition survey, which involves intrusive sampling. Skipping this is the single most common CAR 2012 enforcement trigger.
Read the source on legislation.gov.uk →Regulation 13, Construction (Design and Management) Regulations 2015
“A contractor must plan, manage and monitor construction work carried out either by the contractor or by workers under the contractor's control.”
Refurbishment is sequenced work where each trade depends on the previous one's clean handover. The RAMS must show the planning that holds this together — not a generic 'we'll work it out' approach.
Read the source on legislation.gov.uk →Why this matters — the most recent published figures from the Health and Safety Executive and ONS.
5,000+ asbestos deaths each year
Annual UK deaths attributed to past asbestos exposure. Refurbishment and maintenance workers continue to be exposed — every year — because R&D surveys aren't done before work begins.
Source: HSE — Asbestos statistics →£3.4 billion sector spend
Approximate annual UK commercial refurbishment market — within which the proportion of jobs starting without an adequate R&D survey remains worryingly high.
Source: HSE — Asbestos in workplaces →A small main contractor is engaged to refurbish a Victorian pub cellar — convert from beer storage to a small kitchen-prep area. Three-week programme: strip out, structural alterations, M&E first fix, finishes. Building dates from 1880; previously refurbished in the 1970s.
The structured builder addresses the layered risk profile: (1) R&D survey referenced — pipe lagging on the boiler riser identified as crocidolite, removed under licensed contract before any other works, (2) structural opening for the new ventilation duct designed by SE; props installed before opening cut, (3) old electrical first fix isolated, locked-out and tested dead before strip-out, (4) lead paint encountered on the cellar door — IATP lead-aware operatives, FFP3 masks, wet-stripping technique, (5) services routed away from any unsurveyed wall cavities, (6) phased trade handovers with documented condition at each stage, (7) final clean and air-quality test before handover.
Each trade has its own sub-RAMS referenced from the master document. The master RAMS is the planning evidence that satisfies CDM Reg 13. Total master-RAMS time: 18 minutes; sub-RAMS for each trade ~5 minutes each. The pub reopens on schedule.
1. Using a Management Survey instead of an R&D Survey
Why it fails: Management Surveys are non-intrusive and intended for occupied buildings. Refurbishment requires intrusive sampling — that's the R&D Survey. Confusing the two is a frequent CAR 2012 finding.
Fix: Always commission an R&D Survey from a UKAS-accredited organisation before refurbishment starts. Reference the survey type explicitly in the RAMS.
2. Lead-paint hazards omitted from older properties
Why it fails: Properties built before 1992 can contain lead-based paints, particularly on doors and woodwork. Disturbance creates respirable dust. Refurb RAMS routinely overlook this.
Fix: On any pre-1992 property, document the lead-paint assessment. If present: IATP lead awareness, FFP3, wet-stripping or chemical removal — never dry sanding.
3. Trade sequencing missing handover hold points
Why it fails: Refurbishment goes wrong when one trade's mess becomes the next trade's hazard. CDM Reg 13's 'manage' duty includes inter-trade handovers.
Fix: Document handover hold points between trades: what condition, what sign-off, who approves. The RAMS is the place to set the standard.
Will this take long?
Under 5 minutes. Select your trade, pick hazards, download.
Is it complicated?
No training needed. The guided builder walks you through every step.
Do I need experience?
If you know what work you're doing, you can use Riskora.
Is it free to try?
Yes. The Free plan needs no card — generate, review and download one free PDF. Upgrade any time for branding, DOCX, sign-off and higher limits.
Create your RAMS in under 5 minutes
No onboarding or setup needed — start generating documents instantly
Try Riskora FreeNo card required · 1 free PDF · Upgrade any time (completely free)
All documents generated by Riskora should be reviewed by a competent person before use on site. Riskora provides structured templates — professional judgement is always required.
Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.
Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.
Control measures mapped to each hazard with residual risk scoring after controls are applied.
PPE requirements tied to the activity and site, ready to brief to the team.
Step-by-step method statement structured around how the work is actually sequenced on site.
First aid, rescue plan, emergency contacts and site-specific escalation routes.
Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.
Operative sign-off captured against the document — names, dates and acknowledgement of the brief.
Every change tracked so you can show what was issued, when, and which version the team signed.
Clear approval state on every document — draft, in review, approved, issued — visible across the team.
Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.
The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.
Generic template copied from an old job.
Site-specific document structured around this job, site and task.
A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.
Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.
Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.
You stay in control of every section. Tweak anything, then download a clean PDF or share a link.
Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.
Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.
No training. No complex setup. Just select your trade and go.
Start Your RAMS Now — It's FreeNo card required · 1 free PDF · Upgrade for branding, DOCX, sign-off and audit trails (completely free)
Primary UK sources covering the legal and practical framework behind RAMS, risk assessments and method statements.
Generate a preview first. Sign up only when you want to save, edit or export.
Final RAMS must be reviewed and approved by a competent person before use.
Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.