Refurbishment and strip-out work often takes place in occupied or partially occupied buildings, with unknown materials, hidden asbestos, and structural uncertainties. Your RAMS needs to cover material identification, dust suppression, structural integrity, and segregation from building occupants. Riskora generates structured documentation with refurbishment-specific hazards built in.

Under 5 minutesNo training neededPDF download

UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Example UK (RAMS) front cover produced by Riskora
Try the new compact mode. Same document, just more compact

Full version

Start Your RAMS Now — It's Free

Takes less than 5 minutes

No card required · 1 free PDF · Upgrade any time (completely free)

Refurbishment Work Is More Dangerous Than New Build

HSE data shows that refurbishment and maintenance work accounts for a disproportionate number of construction injuries and fatalities compared to new build. The reasons are clear: unknown structural conditions, asbestos-containing materials, live services within walls and ceilings, shared access with building occupants, and working in confined or restricted spaces. Strip-out work adds the risk of structural instability as loadbearing elements are exposed or disturbed. Many contractors underestimate these risks because refurbishment feels less hazardous than demolition — but the statistics tell a different story. Without knowing who actually needs a RAMS, many small firms either over-document or under-document their work.

CDM 2015 requires that pre-construction information includes details of existing structures, hazardous materials, and services. For refurbishment work, a Refurbishment and Demolition Asbestos Survey is required under the Control of Asbestos Regulations 2012 before any intrusive work begins.

How Riskora Helps

Riskora generates refurbishment and strip-out RAMS covering asbestos management, structural assessment, dust and noise control, service isolation, and occupied building procedures. The system loads hazards specific to interior demolition, ceiling removal, partition stripping, and floor preparation. If you're new to RAMS, our step-by-step guide to writing a RAMS explains the fundamentals before you start generating.

Who it's for

  • Fit-out contractors stripping out commercial offices before refurbishment
  • Residential refurbishment teams working in occupied blocks of flats
  • Retail contractors carrying out store refit and strip-out works
  • Heritage building renovation requiring careful material assessment
  • Hospital and school refurbishment with strict occupied building protocols

Key Risks and Considerations

  • Asbestos-containing materials — textured coatings, floor tiles, pipe lagging, ceiling tiles
  • Structural instability — removing loadbearing elements or transferring loads unexpectedly
  • Live services within walls, floors, and ceilings — electricity, gas, water
  • Dust generation — silica dust from concrete, plaster dust, general construction dust
  • Working in occupied buildings — segregation, fire escape routes, noise disturbance
  • Manual handling — removing heavy fixtures, fittings, and building components
  • Working at height — ceiling removal, high-level strip-out, access scaffolding
  • Waste management — mixed waste streams, hazardous materials, skip loading

What UK Law Actually Says

Direct quotes from the named regulations, with plain-English explanations of what each one means in practice.

Regulation 5, Control of Asbestos Regulations 2012

An employer must not undertake work in demolition, maintenance or any other work which exposes or is liable to expose his employees to asbestos in respect of any premises unless either he has carried out a suitable and sufficient assessment.

Refurbishment of any pre-2000 building must be preceded by an R&D survey. Not the simpler Management Survey — a Refurbishment & Demolition survey, which involves intrusive sampling. Skipping this is the single most common CAR 2012 enforcement trigger.

Read the source on legislation.gov.uk →

Regulation 13, Construction (Design and Management) Regulations 2015

A contractor must plan, manage and monitor construction work carried out either by the contractor or by workers under the contractor's control.

Refurbishment is sequenced work where each trade depends on the previous one's clean handover. The RAMS must show the planning that holds this together — not a generic 'we'll work it out' approach.

Read the source on legislation.gov.uk →

The Numbers Behind the Risk

Why this matters — the most recent published figures from the Health and Safety Executive and ONS.

5,000+ asbestos deaths each year

Annual UK deaths attributed to past asbestos exposure. Refurbishment and maintenance workers continue to be exposed — every year — because R&D surveys aren't done before work begins.

Source: HSE — Asbestos statistics

£3.4 billion sector spend

Approximate annual UK commercial refurbishment market — within which the proportion of jobs starting without an adequate R&D survey remains worryingly high.

Source: HSE — Asbestos in workplaces

Worked Example: RAMS for the Refurbishment of a Victorian Pub Cellar

A small main contractor is engaged to refurbish a Victorian pub cellar — convert from beer storage to a small kitchen-prep area. Three-week programme: strip out, structural alterations, M&E first fix, finishes. Building dates from 1880; previously refurbished in the 1970s.

The structured builder addresses the layered risk profile: (1) R&D survey referenced — pipe lagging on the boiler riser identified as crocidolite, removed under licensed contract before any other works, (2) structural opening for the new ventilation duct designed by SE; props installed before opening cut, (3) old electrical first fix isolated, locked-out and tested dead before strip-out, (4) lead paint encountered on the cellar door — IATP lead-aware operatives, FFP3 masks, wet-stripping technique, (5) services routed away from any unsurveyed wall cavities, (6) phased trade handovers with documented condition at each stage, (7) final clean and air-quality test before handover.

Each trade has its own sub-RAMS referenced from the master document. The master RAMS is the planning evidence that satisfies CDM Reg 13. Total master-RAMS time: 18 minutes; sub-RAMS for each trade ~5 minutes each. The pub reopens on schedule.

Common Mistakes (and How to Avoid Them)

1. Using a Management Survey instead of an R&D Survey

Why it fails: Management Surveys are non-intrusive and intended for occupied buildings. Refurbishment requires intrusive sampling — that's the R&D Survey. Confusing the two is a frequent CAR 2012 finding.

Fix: Always commission an R&D Survey from a UKAS-accredited organisation before refurbishment starts. Reference the survey type explicitly in the RAMS.

2. Lead-paint hazards omitted from older properties

Why it fails: Properties built before 1992 can contain lead-based paints, particularly on doors and woodwork. Disturbance creates respirable dust. Refurb RAMS routinely overlook this.

Fix: On any pre-1992 property, document the lead-paint assessment. If present: IATP lead awareness, FFP3, wet-stripping or chemical removal — never dry sanding.

3. Trade sequencing missing handover hold points

Why it fails: Refurbishment goes wrong when one trade's mess becomes the next trade's hazard. CDM Reg 13's 'manage' duty includes inter-trade handovers.

Fix: Document handover hold points between trades: what condition, what sign-off, who approves. The RAMS is the place to set the standard.

Key Features

  • Refurbishment-specific hazard presets
  • Asbestos management plan integration
  • Structural assessment prompts
  • Occupied building management sections
  • Dust and noise control templates
  • Service isolation procedures
  • Download to PDF

Example Structure (UK Standard)

  1. Project Details and Strip-Out Scope
  2. Pre-Start Survey Findings — Asbestos, Structure, Services
  3. Risk Assessment — Asbestos, Structure, Services, Dust, Noise
  4. Asbestos Management Plan and Survey Reference
  5. Structural Assessment and Temporary Support Requirements
  6. Service Isolation and Live Service Identification
  7. Method Statement — Strip-Out Sequence by Area
  8. Dust and Noise Control Measures
  9. Occupied Building Management and Segregation
  10. Waste Segregation and Disposal
  11. PPE Requirements
  12. Emergency Procedures
  13. Sign-Off

Common Questions Before Getting Started

Will this take long?

Under 5 minutes. Select your trade, pick hazards, download.

Is it complicated?

No training needed. The guided builder walks you through every step.

Do I need experience?

If you know what work you're doing, you can use Riskora.

Is it free to try?

Yes. The Free plan needs no card — generate, review and download one free PDF. Upgrade any time for branding, DOCX, sign-off and higher limits.

Create your RAMS in under 5 minutes

No onboarding or setup needed — start generating documents instantly

Try Riskora Free

No card required · 1 free PDF · Upgrade any time (completely free)

Used by contractors and professionalsNo learning curveDocuments ready in minutes
Built for real job scenarios · Used by UK contractors and professionals

All documents generated by Riskora should be reviewed by a competent person before use on site. Riskora provides structured templates — professional judgement is always required.

Inside the document

What your RAMS actually contains

Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.

  • Hazards

    Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.

  • Controls

    Control measures mapped to each hazard with residual risk scoring after controls are applied.

  • PPE

    PPE requirements tied to the activity and site, ready to brief to the team.

  • Method steps

    Step-by-step method statement structured around how the work is actually sequenced on site.

  • Emergency arrangements

    First aid, rescue plan, emergency contacts and site-specific escalation routes.

  • COSHH prompts

    Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.

  • Sign-off

    Operative sign-off captured against the document — names, dates and acknowledgement of the brief.

  • Version history

    Every change tracked so you can show what was issued, when, and which version the team signed.

  • Approval status

    Clear approval state on every document — draft, in review, approved, issued — visible across the team.

  • Audit trail

    Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.

Before & after

From copied-and-pasted to site-specific

The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.

Before

Generic template copied from an old job.

  • • Hazards and controls that don't match this site or task.
  • • Method steps written for a different sequence of work.
  • • No emergency arrangements specific to the location.
  • • Client flags it as generic and asks for a rewrite.
After

Site-specific document structured around this job, site and task.

  • • Hazards captured from the actual scope you pasted in.
  • • Method steps sequenced for how the work runs on site.
  • • Emergency arrangements and rescue plan tied to the location.
  • • Approved internally, briefed to the team, signed off and stored.
How it works

From job details to signed-off document

A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.

  1. 1
    Paste job details

    Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.

  2. 2
    Riskora structures the document

    Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.

  3. 3
    Review, edit and download

    You stay in control of every section. Tweak anything, then download a clean PDF or share a link.

  4. 4
    Brief the team and record sign-off

    Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.

Built for site reality

Built by people who've written this paperwork on real sites

Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.

  • Built for contractors, consultants and teams
    Solo trades, principal contractors and in-house safety teams all run on the same workflow.
  • Supports multiple countries
    UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard.
  • Not just documents
    Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.

Frequently Asked Questions

Yes. A Refurbishment and Demolition (R&D) asbestos survey is required before any intrusive work begins in buildings constructed before 2000. This is more thorough than a management survey and involves destructive inspection to identify hidden asbestos materials.

Before removing any building elements, you should identify loadbearing walls, structural floors, and any elements that may be under load. A structural engineer should advise on temporary support requirements where loadbearing elements are affected.

You need clear segregation between work areas and occupied spaces — physical barriers, separate access routes, dust suppression, and agreed working hours. Fire escape routes must be maintained at all times.

RAMS as a single document is not named in UK law, but the underlying duties are. The Management of Health and Safety at Work Regulations 1999 require a suitable and sufficient risk assessment, and CDM 2015 effectively requires a written method statement on most construction work. A RAMS satisfies both in one document, which is why principal contractors expect to see one.

Anyone competent to assess the risks of the work. Most subcontractors write their own RAMS for the tasks they carry out — formal qualifications aren't required, but the writer needs to genuinely understand the hazards, the controls and the site. Principal contractors will reject documents that look like they were written by someone who hasn't done the job.

Long enough to cover every hazard and method step honestly — usually 4 to 12 pages. Short, vague RAMS get rejected. Padded ones get skim-read on site, which defeats the point. Aim for specific, not lengthy.

At minimum: before each new site, after any significant change to the work, and after any near-miss or incident. Many principal contractors also expect a documented annual review even if nothing has changed.

Ready? It takes less than 5 minutes.

No training. No complex setup. Just select your trade and go.

Start Your RAMS Now — It's Free

No card required · 1 free PDF · Upgrade for branding, DOCX, sign-off and audit trails (completely free)

Already have a RAMS? Upload and rebuild it

References & Further Reading

Primary UK sources covering the legal and practical framework behind RAMS, risk assessments and method statements.

Free RAMS builder

Create your refurbishment strip out uk RAMS free — preview before sign-up

Generate a preview first. Sign up only when you want to save, edit or export.

Final RAMS must be reviewed and approved by a competent person before use.

Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.