RAMS for Solar Panel Installation UK

By the Riskora Editorial Team · Reviewed against our editorial standards · Last reviewed

Installing solar panels? Riskora generates RAMS covering roof access, DC electrical hazards, panel handling, weather restrictions, and scaffold or MEWP arrangements.

Under 5 minutesNo training neededPDF download

UK (RAMS) example document — Two-Storey Rear Extension — 14 Birchwood Lane, Reading. Client: Mr & Mrs A. Whitfield (Private Client). Site: 14 Birchwood Lane, Reading, RG1 5JT. Scope: Construction of a two-storey rear extension (6.4m × 4.2m) to an existing semi-detached dwelling. Works comprise breaking out of existing rear elevation, trench-fill foundations to 1.0m, traditional cavity blockwork to first floor, pre-stressed concrete lintels, timber roof structure with natural slate finish, plus alterations to existing rear wall to form structural opening with rolled steel joist (RSJ 203×102 UB23). Works programmed over 9 weeks with a peak site team of 6 operatives. Hazards assessed: Manual handling — blocks, lintels, plasterboard, Working at height — independent scaffold & roof structure, Buried services strike during excavation, Collapse of excavation / trench wall, Hand-arm vibration (HAVS) — breaking out, drilling, Silica dust — cutting blocks, brick, concrete, Vehicle/pedestrian segregation — narrow domestic street.

Example UK (RAMS) front cover produced by Riskora
Try the new compact mode. Same document, just more compact

Full version

Start Your RAMS Now — It's Free

Takes less than 5 minutes

No card required · 1 free PDF · Upgrade any time (completely free)

Solar Installation Combines Electrical and Height Risks

Solar panel installation is unique in that it combines working at height with live DC electrical systems. Panels generate electricity as soon as they're exposed to light, and DC current behaves differently to AC — it can't be easily switched off and arcs are harder to extinguish. Add in the manual handling of large panels on a roof surface, and you've got a task that needs thorough RAMS covering both disciplines. Many contractors aren't sure what a RAMS document actually requires, which leads to submissions being rejected.

Solar PV installation must comply with BS 7671 (IET Wiring Regulations) and the Work at Height Regulations 2005. MCS-accredited installers are expected to maintain documented safe working procedures.

How Riskora Helps

Riskora generates solar-specific RAMS with hazards for DC electrical systems, roof access, panel handling at height, inverter installation, and cable routing. The system covers domestic retrofits and large-scale commercial arrays. If you're new to RAMS, our step-by-step guide to writing a RAMS explains the fundamentals before you start generating.

Who it's for

  • Solar installers fitting domestic rooftop PV systems
  • Commercial solar contractors installing large arrays
  • MCS-accredited installers requiring documented procedures
  • Electrical contractors managing DC system connections

Key Risks and Considerations

  • DC electric shock — panels generate voltage in any light conditions
  • Falls from height — working on domestic and commercial roofs
  • Panel handling — large panels acting as sails in wind, cuts from edges
  • Roof loading — structural capacity for additional panel weight
  • Inverter installation — AC/DC interface, isolation procedures
  • Cable routing — trip hazards, damage protection, fire stops

Key Features

  • Solar-specific hazard library
  • DC electrical safety sections
  • Roof access and fall protection
  • Panel handling procedures
  • Weather and wind limitations
  • Download to PDF

Example Structure (UK Standard)

  1. Project Details and System Specification
  2. Risk Assessment — DC Electrical, Falls, Panel Handling, Wind
  3. Method Statement — Mounting System, Panel Installation, Wiring
  4. Roof Access Arrangements
  5. Electrical Isolation and Testing Procedures
  6. PPE Requirements
  7. Emergency Procedures — DC Isolation, Falls Rescue
  8. Sign-Off

Common Questions Before Getting Started

Will this take long?

Under 5 minutes. Select your trade, pick hazards, download.

Is it complicated?

No training needed. The guided builder walks you through every step.

Do I need experience?

If you know what work you're doing, you can use Riskora.

Is it free to try?

Yes. The Free plan needs no card — generate, review and download one free PDF. Upgrade any time for branding, DOCX, sign-off and higher limits.

Create your RAMS in under 5 minutes

No onboarding or setup needed — start generating documents instantly

Try Riskora Free

No card required · 1 free PDF · Upgrade any time (completely free)

Used by contractors and professionalsNo learning curveDocuments ready in minutes
Built for real job scenarios · Used by UK contractors and professionals

All documents generated by Riskora should be reviewed by a competent person before use on site. Riskora provides structured templates — professional judgement is always required.

Inside the document

What your RAMS actually contains

Riskora builds a structured, client-facing document — not a generic AI paragraph. Every section is shaped around your job, your site and your team.

  • Hazards

    Task-specific hazards for the job, captured row by row — not a generic list pulled from an old RAMS.

  • Controls

    Control measures mapped to each hazard with residual risk scoring after controls are applied.

  • PPE

    PPE requirements tied to the activity and site, ready to brief to the team.

  • Method steps

    Step-by-step method statement structured around how the work is actually sequenced on site.

  • Emergency arrangements

    First aid, rescue plan, emergency contacts and site-specific escalation routes.

  • COSHH prompts

    Substance prompts when the work involves chemicals, dusts, fumes or sealants — flagged early, not missed at review.

  • Sign-off

    Operative sign-off captured against the document — names, dates and acknowledgement of the brief.

  • Version history

    Every change tracked so you can show what was issued, when, and which version the team signed.

  • Approval status

    Clear approval state on every document — draft, in review, approved, issued — visible across the team.

  • Audit trail

    Who created it, who reviewed it, who signed it. A complete trail you can hand to a principal contractor or auditor.

Before & after

From copied-and-pasted to site-specific

The reason RAMS get rejected is rarely the format — it's that the document is obviously generic. Riskora rebuilds it around this job, this site and this task.

Before

Generic template copied from an old job.

  • • Hazards and controls that don't match this site or task.
  • • Method steps written for a different sequence of work.
  • • No emergency arrangements specific to the location.
  • • Client flags it as generic and asks for a rewrite.
After

Site-specific document structured around this job, site and task.

  • • Hazards captured from the actual scope you pasted in.
  • • Method steps sequenced for how the work runs on site.
  • • Emergency arrangements and rescue plan tied to the location.
  • • Approved internally, briefed to the team, signed off and stored.
How it works

From job details to signed-off document

A four-step workflow used by contractors, consultants and safety teams to turn informal job details into client-ready safety paperwork.

  1. 1
    Paste job details

    Drop in a client email, a WhatsApp from the site manager, a scope of works or a tender note. Anything that describes the job.

  2. 2
    Riskora structures the document

    Riskora turns your brief into hazards, controls, method steps, PPE, emergency arrangements and COSHH prompts.

  3. 3
    Review, edit and download

    You stay in control of every section. Tweak anything, then download a clean PDF or share a link.

  4. 4
    Brief the team and record sign-off

    Brief operatives, capture their sign-off and keep a full audit trail of who signed which version.

Built for site reality

Built by people who've written this paperwork on real sites

Riskora is built by a founder with hands-on site and document experience — designed for contractors, consultants and safety teams who need to issue, brief and prove safety paperwork without losing a day to admin.

  • Built for contractors, consultants and teams
    Solo trades, principal contractors and in-house safety teams all run on the same workflow.
  • Supports multiple countries
    UK, Ireland, Australia, New Zealand, US and Canada — wording and document types match the local standard.
  • Not just documents
    Sign-off, approvals, version history and an audit trail — the management workflow around the paperwork.

Frequently Asked Questions

No — solar panels generate DC voltage whenever exposed to light. This means there is always a live electrical hazard during installation. Panels must be covered or installed using DC-safe procedures to manage this risk.

Yes. Solar installation has unique hazards — particularly the combination of DC electrical systems and working at height — that should be documented in task-specific RAMS rather than covered by generic construction documentation.

Most manufacturers specify maximum handling wind speeds of 15-20 mph for large panels. Your RAMS should define site-specific wind limits based on panel size, roof height, and exposure.

RAMS as a single document is not named in UK law, but the underlying duties are. The Management of Health and Safety at Work Regulations 1999 require a suitable and sufficient risk assessment, and CDM 2015 effectively requires a written method statement on most construction work. A RAMS satisfies both in one document, which is why principal contractors expect to see one.

Anyone competent to assess the risks of the work. Most subcontractors write their own RAMS for the tasks they carry out — formal qualifications aren't required, but the writer needs to genuinely understand the hazards, the controls and the site. Principal contractors will reject documents that look like they were written by someone who hasn't done the job.

Long enough to cover every hazard and method step honestly — usually 4 to 12 pages. Short, vague RAMS get rejected. Padded ones get skim-read on site, which defeats the point. Aim for specific, not lengthy.

At minimum: before each new site, after any significant change to the work, and after any near-miss or incident. Many principal contractors also expect a documented annual review even if nothing has changed.

Ready? It takes less than 5 minutes.

No training. No complex setup. Just select your trade and go.

Start Your RAMS Now — It's Free

No card required · 1 free PDF · Upgrade for branding, DOCX, sign-off and audit trails (completely free)

Already have a RAMS? Upload and rebuild it

References & Further Reading

Primary UK sources covering the legal and practical framework behind RAMS, risk assessments and method statements.

Free RAMS builder

Create your solar panel installation uk RAMS free — preview before sign-up

Generate a preview first. Sign up only when you want to save, edit or export.

Final RAMS must be reviewed and approved by a competent person before use.

Riskora is an assistive document preparation tool. All documents generated must be reviewed, verified, and approved by a competent person before use on site. Riskora does not replace professional safety judgment, and no output should be treated as a legal compliance guarantee.